Work Details

Sl.NoworkcodeYearTypeDistrictTalukaVillageCategorySub TypeSectorSub SectorSub Sector TypeAgencySubDivisionImplemented ByPlan Approval DateWork Name in EnglishWork Name in KannadaApproved AllocationADM Approval DateADM AmountTechnical Approval DateTechnical AmountTender Notification DateTender Approval DateTender AmountWork Order Approval DateWork Order AmountExpenditureWork StatusWorkStatusDescriptionRemarksLast Modified On
1 KPL15R11230402015-16RMACROKoppalKushtagiKordakeraGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Koradkera - Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.530 0.0000.000Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.05/04/2019 12:06:02
2 KPL15R41210782015-16RMACROKoppalKoppalOthersSCP InfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Hitnal - Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20162.4701.843Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.06/03/2019 12:59:43
3 KPL15R41210802015-16RMACROKoppalKoppalOthersSCP InfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Kawluru - Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20162.4701.510Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.06/03/2019 12:59:43
4 KPL15R41210822015-16RMACROKoppalKoppalOthersSCP InfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Ajlapur- Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00008/01/20195.00021/12/201806/02/20192.53012/02/20162.4701.510Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.06/03/2019 12:59:43
5 KPL15R41230622015-16RMACROKoppalKoppalKerihalliGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Kerehalli - Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20162.4701.510Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಲಾಗಿದೆ.01/04/2019 12:58:10
6 KPL15R41230642015-16RMACROKoppalKoppalChukankalGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Chukankal-Pre-fab hut(4.88m x9.76) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500 LPH Public5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20162.4701.510Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 12:58:45
7 KPL15R41230662015-16RMACROKoppalKoppalOthersGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Mundargi-Pre-gab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20162.4701.510Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.06/03/2019 12:59:43
8 KPL15R41230682015-16RMACROKoppalKoppalKanakapurGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Hosa Kankapur- Pre-fab hut (4.88m x 9.76m)Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20162.4701.510Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 13:00:21
9 KPL15R41230702015-16RMACROKoppalKoppalGabburGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Gabburu - Pre-fab hut (4.88m x9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20162.4701.510Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 13:00:48
10 KPL15R41230722015-16RMACROKoppalKoppalGuldahalliGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Guladahalli -Pre-fab hut(4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20162.4701.510Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 13:28:16
11 KPL15R41230742015-16RMACROKoppalKoppalBelgattiGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Belagatti -Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20162.4701.510Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 13:28:49
12 KPL15R41230762015-16RMACROKoppalKoppalMohammad NagarGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KoppalCEONov 30 2018 12:00AM Water Purification plant at Mahmadnagar - Pre-fab hut (4.88 x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20162.4701.510Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 13:31:45
13 KPL15R11230422015-16RMACROKoppalKushtagiDotihalGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Dotihal-Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.780Under ProgressWork Under Progressಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:27:40
14 KPL15R11230442015-16RMACROKoppalKushtagiHesrurGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Hesarur- Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.000Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:29:05
15 KPL15R11230462015-16RMACROKoppalKushtagiOthersGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Amrapur -Pre-fab hut(4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public) 5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.000Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.06/03/2019 12:59:43
16 KPL15R11230482015-16RMACROKoppalKushtagiJagir Gadadur GeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Jahagir Guddur - Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.780Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:30:47
17 KPL15R11230502015-16RMACROKoppalKushtagiPattalchintiGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Pattalchinti- Pre-fab hut (4.88m x 9.76m)Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.000Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:31:26
18 KPL15R11230522015-16RMACROKoppalKushtagiBadimnhalGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Badimanal - Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.780Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:37:48
19 KPL15R11230542015-16RMACROKoppalKushtagiKalgonhalGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Kallagonal- Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.000Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:38:31
20 KPL15R11230562015-16RMACROKoppalKushtagiGarjanhalGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Garjanal - Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.000Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:39:08
21 KPL15R11230582015-16RMACROKoppalKushtagiKidadurGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Kidadur - Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.780Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:40:52
22 KPL15R11230602015-16RMACROKoppalKushtagiKushtagi (TMC) WARD NO.-0001GeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Kushtagi town ward no.1 Slum Board colony- Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(1000LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.570Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 12:56:41
23 KPL15R11210242015-16RMACROKoppalKushtagiOthersSCP InfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Kalmalli-Pre-fab hut (4.88m x 9.76m)Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.000Under ProgressLetter of Acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.06/03/2019 12:59:43
24 KPL15R11210262015-16RMACROKoppalKushtagiOthersSCP InfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Tavargera -Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.000Under ProgressLetter of Acceptance issued on 08.02.2019 ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.06/03/2019 12:59:43
25 KPL15R11210282015-16RMACROKoppalKushtagiOthersSCP InfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Myadardokki - Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.000Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.06/03/2019 12:59:43
26 KPL15R11230302015-16RMACROKoppalKushtagiOthersGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at K.Boduru - Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.000Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.06/03/2019 12:59:43
27 KPL15R11230322015-16RMACROKoppalKushtagiZhoolkattiGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Julakatti - Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.530 0.0000.000Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:21:34
28 KPL15R11230342015-16RMACROKoppalKushtagiHanamsagarGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Santebazar of Hanumsagar - Pre-fab hut (4.88m x9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.780Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:22:09
29 KPL15R11230362015-16RMACROKoppalKushtagiHanamsagarGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Hanamansagar- Pre-fab hut (4.88m x 9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.000Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:23:07
30 KPL15R11230382015-16RMACROKoppalKushtagiHanmanhalGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSRWS KushtagiCEONov 30 2018 12:00AM Water Purification plant at Hanumanal- Pre-fab hut (4.88m x9.76m) Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.(500LPH Public)5.0008/01/20195.00031/12/20185.00021/12/201806/02/20192.53012/02/20161.4700.000Under ProgressLetter of acceptance issued on 08.02.2019ಮಂಡಳಿ ಆದೇಶ ಸಂ:3964 ದಿ: 30.11.2018ರನ್ವಯ ಸದರಿ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ KRIDL Koppal ದಿಂದ RWS Koppal ರವರಿಗೆ ವಹಿಸಿ, ಸದರಿ ಕಾಮಗಾರಿಯ ಅಂದಾಜು ರೂ.2.53 ಮೊತ್ತವು ವರ್ಗಾಯಿಸಿ ಆದೇಶಿಸಲಾಗಿದೆ.01/04/2019 11:23:46
                 150.00 150.000 150.000  75.900 52.16021.413