Work Details

Sl.NoworkcodeYearTypeDistrictTalukaVillageCategorySub TypeSectorSub SectorSub Sector TypeAgencyImplemented ByPlan Approval DateWork Name in EnglishWork Name in KannadaApproved AllocationADM Approval DateADM AmountTechnical Approval DateTechnical AmountTender Notification DateTender Approval DateTender AmountWork Order Approval DateWork Order AmountExpenditureWork StatusWorkStatusDescriptionRemarks
1 BDR1612110062016-17MICROBidarAuradOthersSCP InstitutionalWomen & ChildOthersOthersPREDCEOJul 15 2016 12:00AM ಘಮಸುಬಾಯಿ ತಾಂಡಾದಲ್ಲಿ ಅಂಗನವಾಡಿ ಕಟ್ಟಡ ನಿರ್ಮಾಣ, {Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.}13.7521/09/201613.75013/10/201613.750 22/03/201713.72022/03/201713.7206.430CompletedPhysically Completed 
2 BDR1612110072016-17MICROBidarAuradOthersSCP InstitutionalWomen & ChildOthersOthersPREDCEOJul 15 2016 12:00AM ರಾಮಸಿಂಗನಾಯಕ ತಾಂಡಾದಲ್ಲಿ ಅಂಗನವಾಡಿ ಕಟ್ಟಡ ನಿರ್ಮಾಣ {Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.}13.7528/11/201613.75005/01/201713.750 24/03/201713.00024/03/201713.0005.910CompletedPhysically Completed  
3 BDR1612112172016-17MICROBidarAuradOthersSCP InstitutionalEducationOthersOthersPWDDCJan 1 1900 12:00AM ಹಂಗರಗಾ ಗ್ರಾಮದ ಸರ್ಕಾರಿ ಪ್ರಾಥಮಿಕ ಶಾಲಾ ಕಟ್ಟಡ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision) 25.0011/01/201725.00022/05/201725.00023/05/201719/06/201724.54027/06/201721.65018.180Completedcompleted 
4 BDR1612120102016-17MICROBidarAuradOthersTSP InstitutionalHealthOthersOthersPWDDCJul 15 2016 12:00AM ಆರೋಗ್ಯ ಕೇಂದ್ರ ಸಂತಪೂರ1 ನರ್ಸ ವಸತಿಗೃಹಗಳ ನಿರ್ಮಾಣ ಮಾಡುವುದು. WITH SINGLE 2BHK ROOMS [including electrification,water supply,and sanitation]10.0007/01/201716.98015/03/201716.98016/03/201731/03/201715.96031/03/201714.18014.170Completedcompleted 
5 BDR1612130142016-17MICROBidarAuradOthersGeneralInstitutionalHealthOthersOthersPWDDCJul 15 2016 12:00AM ಹೋಳೆಸಮುದ್ರ ಗ್ರಾಮದಲ್ಲಿ ವೈದ್ಯಾಧಿಕಾರಿಗಳ ವಸತಿಗೃಹ ನಿರ್ಮಾಣ ಮಾಡುವುದು. WITH 3 BHK ROOMS.{including electrification,water supply,and sanitation}18.0010/01/201724.48015/03/201724.48016/03/201731/03/201723.37031/03/201720.79020.790Completedcompleted 
6 BDR1612130152016-17MICROBidarAuradOthersGeneralInstitutionalHealthOthersOthersPWDDCJul 15 2016 12:00AM ಸಂತಪೂರ ಗ್ರಾಮದಲ್ಲಿ ವೈದ್ಯಾಧಿಕಾರಿಗಳ ವಸತಿಗೃಹ ನಿರ್ಮಾಣ ಮಾಡುವುದು. WITH 3 BHK ROOMS.{including electrification,water supply,and sanitation}18.0007/01/201725.00015/03/201724.48016/03/201731/03/201723.37031/03/201720.79020.420Completedcompleted 
7 BDR1612130182016-17MICROBidarAuradOthersGeneralInstitutionalHealthOthersOthersPWDDCJul 15 2016 12:00AM ಸಂತಪೂರ ಗ್ರಾಮದಲ್ಲಿ ಹೆರಿಗೆ ಕೋಣೆ ನಿರ್ಮಾಣ ಮಾಡುವುದು.10.0007/01/201713.56015/03/201713.56016/03/201731/03/201712.49031/03/201711.18010.160Completedcompletedಮಂಡಳಿ ಆದೇಶ ಸಂ:9047 ದಿ.06/01/2017 ರನ್ಸವಯ ದರಿ ಕಾಮಗಾರಿಯ ಕ್ರೀಯಾ ಯೋಜನೆಯಲ್ಲಿ ಮಂಜೂರಾದ ಮೊತ್ತ ರೂ.10.00 ಲಕ್ಷ ಆದರೆ ಆಡಳಿತಾತ್ಮಕ ಅನುಮೋದನೆ ನೀಡಿದ ಮೊತ್ತ ರೂ 13.56ಲಕ್ಷಕ್ಕೆ ಅನುಮೋದನೆ ನೀಡಿ ಆದೇಶಿಸಲಾಗಿದೆ
8 BDR1612132192016-17MICROBidarAuradOthersGeneralInstitutionalSWOthersOthersPWDDCJul 15 2016 12:00AM ಹಂಗರಗಾ ಗ್ರಾಮದ ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲಾ ಕಟ್ಟಡ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision) 57.8110/01/201757.81022/05/201757.81008/05/201719/06/201756.950 53.08035.330Completedcompleted 
9 BDR1612210202016-17MICROBidarAuradOthersSCP InfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಬಬನ್ ನಾಯಕ ತಾಂಡಾದಿಂದ ಚಿಕಲಿ(ಯು) ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ 2 ಕಿ.ಮೀ80.0021/09/201680.00004/01/201780.00031/01/201731/07/201788.96005/08/201788.96086.570CompletedCompleted 
10 BDR1612210212016-17MICROBidarAuradOthersSCP InfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಬೋಂತಿಯಿಂದ ವಜ್ಜರ ವಾಯಾಥಾವ್ರಾನಾಯಕ ತಾಂಡಾವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ80.0021/09/201680.00004/01/201780.00031/01/201731/07/201789.40005/08/201789.40085.320CompletedCompleted 
11 BDR1612210222016-17MICROBidarAuradOthersSCP InfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಮಾಳೆಗಾಂವ ದಿಂದ ರೂಪ್ಲಾ ತಾಂಡಾವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ವಾಯಾ:ಮಹಾದೇವತಾಂಡ)80.0021/09/201680.00007/01/201780.00031/01/201731/07/201789.50005/08/201789.50080.990CompletedCompleted
12 BDR1612212212016-17MICROBidarAuradOthersSCP InfrastructureWater SupplyOthersOthersRWSCEOSep 28 2016 12:00AM Augmentation of PWS at Balat (B)18.8302/01/201718.83025/01/201718.830 15/06/201717.51005/07/201717.5107.140CompletedPhysically completedPhysically completed
13 BDR1612220232016-17MICROBidarAuradOthersTSP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಕೋರೆಕಲ್ ನಿಂದ ಬೆಡಕುಂದಾವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ವಾಯಾ ಲಕ್ಷ್ಮೀನಗರ)100.0027/10/2016100.23009/12/2016100.23019/12/201708/02/201799.17009/03/201788.00088.000CompletedCompleted 
14 BDR1612230242016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಮುಧೋಳದಿಂದ ಲಿಂಗದಳ್ಳಿವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (1.5 km)60.0021/09/201660.00004/01/201760.00031/01/201731/07/201766.83005/08/201766.83066.520Completed completed.
15 BDR1612230252016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಖತಗಾಂವದಿಂದ ಮದನೂರು ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (1 km)40.0021/09/201640.00003/11/201640.00031/01/201731/07/201744.60005/08/201744.60044.210Completed completed
16 BDR1612230262016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಮುರ್ಕಿಯಿಂದ ರಾವಣಗಾಂವ (Msborder) ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (2 km)80.0021/09/201680.00004/01/201780.00031/01/201731/07/201789.04005/08/201789.04059.430Completedcompleted
17 BDR1612230272016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಮಹಾಡೋಣಗಾಂವ ದಿಂದ ಹಿಪ್ಪಳಗಾಂವವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (2 km)80.0021/09/201680.00004/01/201780.00031/01/201731/07/201789.61005/08/201789.61088.580Completedcompleted
18 BDR1612230282016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಚಟನಾಳದಿಂದ ಜೀರಗಾವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (2 km)80.0021/09/201680.00004/01/201780.00031/01/201731/07/201789.18005/08/201789.18085.900Completedphysically completedphysically completed
19 BDR1612230292016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಆಲೂರು ದಿಂದ ಬೇಲೂರುವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (1 km)40.0021/09/201640.00003/11/201640.00031/01/201731/07/201744.51005/08/201744.51041.070CompletedPhysically CompletedPhysically Completed,Financially in Progress
20 BDR1612230302016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಶಿಚಪೂರದಿಂದ ಡೋಣಗಾಂವ (M) ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (1 km)40.0021/09/201640.00003/11/201640.00031/01/201731/07/201744.57005/08/201744.57039.090CompletedPhysically CompletedPhysically Completed,Fianancially in Progress.
21 BDR1612230312016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಕರಂಜಿ (ಬ) ದಿಂದ ದೇಗಲವಾಡಿ ಆಂದ್ರ ಗಡಿ ವಾಯಾ ಕರಂಜಿ(ಕೆ)ಯವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (2.00 ಕಿ.ಮೀ)80.0021/09/201680.00004/01/201780.00031/01/201709/06/201772.47030/06/201772.47063.110Completedphysically completedphysically completed
22 BDR1612230322016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಬೆಲ್ದಾಲದಿಂದ ಗುಡಪಳ್ಳಿವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಿಸುವುದು (2 km)80.0021/09/201680.00004/01/201780.00031/01/201709/06/201772.34030/06/201772.34064.460Completedphysically completedfinancially in progress
23 BDR1612230332016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಜಿರಗಾ (ಕೆ) ದಿಂದ ಜಿರಗಾ (ಬಿ) ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ66.1121/09/201666.11004/01/201766.11031/01/201709/06/201759.77030/06/201759.77051.110CompletedPhysically Completed 
24 BDR1612230342016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಶೆಂಬೆಳ್ಳಿಯಿಂದ ಧರಿಹನುಮಾನ ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ80.0021/09/201680.00004/01/201780.00031/01/201709/06/201772.34030/06/201772.34060.700CompletedPhysically completed  
25 BDR1612232252016-17MICROBidarAuradOthersGeneralInfrastructureWater SupplyOthersOthersRWSCEOSep 28 2016 12:00AM Augmentation of PWS at Jonnikeri20.0002/01/201720.00025/01/201720.00020/05/201705/07/201717.06006/07/201717.06012.230CompletedCompletedCompleted
26 BDR1612232272016-17MICROBidarAuradOthersGeneralInfrastructureWater SupplyOthersOthersRWSCEOSep 28 2016 12:00AM ಹೊಕ್ರಾಣಾ ಗ್ರಾಮದಲ್ಲಿ ಪೈಪ್ ಲೈನ್ ಮುಖಾಂತರ ನೀರು ಸರಬರಾಜು ಅಳವಡಿಸುವುದು20.0002/01/201720.00025/01/201720.000 04/05/201719.16010/05/201718.97018.960CompletedPhysically CompletedPhysically Completed
27 BDR1612232372016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersTown Panchayat AuradDCJan 1 1900 12:00AM ಔರಾದ ಡಿಗ್ರಿ ಹಾಸ್ಟೆಲ್ ನಿಂದ ಹಮಾಲ್ ಕಾಲೋನಿವರೆಗೆ ಸಿಸಿ ರಸ್ತೆ ನಿರ್ಮಾಣ 20.0019/12/201620.00002/01/201720.00022/02/201715/02/201720.00008/05/201720.00018.680CompletedWork CompletedWork Completed
28 BDR1612232382016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersTown Panchayat AuradDCJan 1 1900 12:00AM ದತ್ತಮಂದಿರದಿಂದ ಎಪಿಎಂಸಿ ತಾಂಡದವರೆಗೆ ಸಿಸಿ ರಸ್ತೆ ನಿರ್ಮಾಣ 25.0019/12/201625.00002/01/201725.00022/02/201715/02/201725.00008/05/201725.00011.620CompletedWork CompletedWork Completed
29 BDR1612232392016-17MICROBidarAuradOthersGeneralInfrastructureRoads & BridgesOthersOthersTown Panchayat AuradDCJan 1 1900 12:00AM ಔರಾದ ರಿಂಗ್ ರೋಡದಿಂದ ಮಹಾದೇವ ಮಂದಿರದವರೆಗೆ ಸಿಸಿ ರಸ್ತೆ ನಿರ್ಮಾಣ 25.0019/12/201625.00002/01/201725.00022/02/201715/02/201725.00008/05/201725.00020.550CompletedWork CompletedWork Completed
30 BDR1622110972016-17MICROBidarBhalkiOthersSCP InstitutionalSWOthersOthersPWDDCJul 15 2016 12:00AM ಭಾಲ್ಕಿ ಪಟ್ಟಣದ ಸಮಾಜ ಕಲ್ಯಾಣ ಇಲಾಖೆಯ ಮೇಟ್ರಿಕ್ ನಂತರದ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಕಟ್ಟಡ ನಿರ್ಮಾಣ [including electrification,water supply and sanitation] (ಪ್ರಸ್ತುತ ಇರುವ ಕಟ್ಟಡ ಶಿಥಿಲಾವಸ್ಥೆಯಲ್ಲಿರುವುದರಿಂದ)178.3301/12/2016178.33003/01/2017178.33018/01/201728/06/2017177.99020/07/2017177.990143.100Completed completed  
31 BDR1622120982016-17MICROBidarBhalkiOthersTSP InstitutionalHealthOthersOthersPWDDCJul 15 2016 12:00AM ಭಾಲ್ಕಿ ತಾಲೂಕ ಸರಕಾರಿ ಆಸ್ಪತ್ರೆಯಲ್ಲಿ ಒಂದು ಮಾದರಿ ಶೌಚಾಲಯ ನಿರ್ಮಾಣ.10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.74016/12/20168.6908.090CompletedCompleted 
32 BDR1622131012016-17MICROBidarBhalkiOthersGeneralInstitutionalEducationOthersOthersPWDDCJul 15 2016 12:00AM ಭಾಲ್ಕಿ ಪಟ್ಟಣದ ಸರಕಾರಿ ಪದವಿ ಕಾಲೇಜಿನಲ್ಲಿ ನಾಲ್ಕು ಹೊಸ ತರಗತಿ ಕೋಣೆಗಳ ನಿರ್ಮಾಣ ಮಾಡುವುದು. {Including electrification,fan and light.and plug provision}41.2519/11/201641.25029/11/201641.25007/12/201627/12/201639.32006/01/201739.32037.580Completedcompleted 
33 BDR1622131022016-17MICROBidarBhalkiOthersGeneralInstitutionalEducationOthersOthersPWDDCJul 15 2016 12:00AM ಭಾಲ್ಕಿ ತಾಲೂಕಿನ ಮೇಹಕರ ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆಯಲ್ಲಿ 10 ಕೋಣೆಗಳ ನಿರ್ಮಾಣ ಮಾಡುವುದು. {Including electrification,fan and light.and plug provision}100.8927/10/2016100.89007/01/2017100.89018/01/201725/04/201799.62012/06/201799.62086.400Completedcompletion  
34 BDR1622131032016-17MICROBidarBhalkiOthersGeneralInstitutionalEducationOthersOthersPWDDCJul 15 2016 12:00AM ಭಾಲ್ಕಿ ತಾಲೂಕಿನ ಐದು ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆಗಳಿಗೆ (1) ಮಳಚಾಪೂರ, (2) ಕೋಣಮೇಳಕುಂದಾ, (3) ಭಾಲ್ಕಿ, (4) ನಿಟ್ಟೂರ (ಬಿ) (5) ಕಾಕನಾಳ ತಲಾ ಒಂದು ಕೋಣೆ ನಿರ್ಮಾಣ. {Including electrification,fan and light.and plug provision}40.8511/01/201740.85022/05/201740.85023/05/201719/06/201738.27011/07/201738.27031.990Completedcompleted 
35 BDR1622211072016-17MICROBidarBhalkiOthersSCP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಖಂಡ್ರೆ ತಾಂಡಾಕ್ಕೆ ಕೊಡು ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ.1.20)75.0029/09/201675.00028/10/201675.00010/11/201614/12/201674.61016/12/201674.61065.360CompletedCompleted 
36 BDR1622211082016-17MICROBidarBhalkiOthersSCP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಗರ್ಮಾ ತಾಂಡಾಕ್ಕೆ ಕೂಡು ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ. 0.80)45.0014/10/201645.00008/11/201645.00010/11/201614/12/201642.35016/12/201642.35043.400CompletedCompleted 
37 BDR1622211092016-17MICROBidarBhalkiOthersSCP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಕಳಸದಾಳ ಗ್ರಾಮದ ಕೂಡು ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ. 2.40)122.8127/10/2016122.93005/12/2016122.93012/12/201610/02/2017121.60009/03/2017121.600118.310CompletedCompleted 
38 BDR1622211102016-17MICROBidarBhalkiOthersSCP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಮೇಹಕರ-ತುಗಾಂವ (ಹೆಚ್) ರಸ್ತೆಯ ಕಿ.ಮೀ 0.70 ರಲ್ಲಿ ಸೇತುವೆ ನಿರ್ಮಾಣ20.0022/11/201620.00005/12/201620.00007/12/201726/12/201619.42006/01/201719.41019.420CompletedCompleted 
39 BDR1622231122016-17MICROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCMar 30 2016 12:00AM ಭಾಲ್ಕಿ ತಾಲ್ಲೂಕಿನ ಹುಪನಾ, ಹುಣಜಿ (ಕೆ), ಜ್ಯಾಂತಿ, ಹಲಬರ್ಗಾ, ನಾವದಗಿ, ತರನಳ್ಳಿ, ಸಿದ್ದೇಶ್ವರವಾಡಿ ಗ್ರಾಮಗಳಲ್ಲಿ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ.200.0026/04/2017200.00026/05/2017200.00001/07/201721/09/2017198.13022/03/2018197.930161.710Completedcompleted 
40 BDR1622231132016-17MICROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಹಚ್ಚಿಕಮಠ ಗ್ರಾಮದ ಕೂಡು ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ.1.50)80.0014/10/201680.00022/11/201680.00007/12/201608/02/201779.25008/03/201779.25076.000CompletedCompleted  
41 BDR1622231142016-17MICROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಭಾತಂಬ್ರಾ ದಿಂದ ಭಾಟಸಾಂಗವಿ ವರೆಗೆನ ಆಯ್ದ ಭಾಗಗಳಲ್ಲಿ ರಸ್ತೆ ನಿರ್ಮಾಣ.190.0015/11/2016190.11009/12/2016190.11019/12/201606/03/2017187.58031/03/2017187.580186.940Completedcompleted 
42 BDR1622231152016-17MICROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಬೋಳೆಗಾಂವ ಗ್ರಾಮದ ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ. 3.00)150.0027/10/2016148.27005/12/2016148.27012/12/201620/03/2017143.88024/03/2017143.880134.000Completedcompleted  
43 BDR1622231162016-17MICROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಭಾಲ್ಕಿ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 17 ರಲ್ಲಿ ಸಿ.ಸಿ ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ.25.0029/09/201625.00018/10/201625.00010/11/201608/12/201622.01016/12/201621.86021.860CompletedCompleted 
44 BDR1622231172016-17MICROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಕೋಣಮೇಳಕುಂದಾ ಗ್ರಾಮಕ್ಕೆ ವರ್ತುಳ ರಸ್ತೆ ನಿರ್ಮಾಣ50.0014/10/201650.00025/11/201650.00007/12/201623/12/201646.88006/01/201746.88045.790CompletedCompleted 
45 BDR1632111422016-17MICROBidarHumnabadOthersSCP InstitutionalBCMOthersOthersPWDDCJul 15 2016 12:00AM ಮೇಟ್ರಿಕ್ ಪೂರ್ವ ಬಾಲಕೀಯರ ವಸತಿ ನಿಲಯ ಹುಮನಾಬಾದ, ಹೆಚ್ಚುವರಿಯಾಗಿ 2 ವಿದ್ಯಾರ್ಥಿಗಳ ವಾಸದ ಕೋಣೆ ನಿರ್ಮಾಣ {Including electrification,fan and light.and plug provision}22.0014/10/201622.00007/11/201622.00007/12/201623/12/201619.29006/01/201719.29019.270CompletedCompleted 
46 BDR1632111432016-17MICROBidarHumnabadOthersSCP InstitutionalBCMOthersOthersPWDDCJul 15 2016 12:00AM ಮೇಟ್ರಿಕ್ ಪೂರ್ವ ಬಾಲಕೀಯರ ವಸತಿ ನಿಲಯ ಚಿಟ್ಟಗುಪ್ಪಾ, ಹೆಚ್ಚುವರಿಯಾಗಿ 2 ಸ್ನಾನದ ಗೃಹ ಶೌಚಾಲಯ ನಿರ್ಮಾಣ.10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.79016/12/20169.1909.190CompletedCompleted 
47 BDR1632111442016-17MICROBidarHumnabadOthersSCP InstitutionalEducationOthersOthersKRIDLCEOJul 15 2016 12:00AMConstruction of Three(3) class room ,Govt Higher Primary School (Kannada) in Mangalgi [Including electrification fans, light and plug provisions]Construction of Three(3) class room ,Govt Higher Primary School (Kannada) in Mangalgi [Including electrification fans, light and plug provisions]19.5006/12/201619.50025/03/201719.500  0.00006/12/201619.50019.310CompletedCompletedSCP
48 BDR1632111452016-17MICROBidarHumnabadOthersSCP InstitutionalSWOthersOthersKRIDLCEOJul 15 2016 12:00AMConstruction of One(1) class room ,Govt Higher Primary School (Kannada) Boral [Including electrification fans, light and plug provisions]Construction of One(1) class room ,Govt Higher Primary School (Kannada) Boral [Including electrification fans, light and plug provisions]7.0006/12/20167.00025/03/20177.000  0.00006/12/20167.0006.930CompletedCompleted SCP
49 BDR1632112052016-17MICROBidarHumnabadOthersSCP InstitutionalEducationOthersOthersPREDCEOAug 29 2016 12:00AM ಮೆಟ್ರಿಕ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಚಿಟಗುಪ್ಪದಲ್ಲಿ 2 ಶೌಚಾಲಯ ಹಾಗೂ 2 ಸ್ನಾನದ ಗೃಹ ನಿರ್ಮಾಣ10.0019/10/201610.00010/11/201610.000 06/03/20179.77007/03/20179.7709.770CompletedCompleted 
50 BDR1632112062016-17MICROBidarHumnabadOthersSCP InstitutionalEducationOthersOthersPREDCEOAug 29 2016 12:00AM ಮೆಟ್ರಿಕ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಹುಡಗಿಯಲ್ಲಿ 2 ಶೌಚಾಲಯ ಹಾಗೂ 2 ಸ್ನಾನದ ಗೃಹ ನಿರ್ಮಾಣ10.0019/10/201610.00010/11/201610.000 02/02/20179.06003/02/20179.0609.040CompletedCompleted 
51 BDR1632112072016-17MICROBidarHumnabadOthersSCP InstitutionalEducationOthersOthersPREDCEOAug 29 2016 12:00AM ಮೆಟ್ರಿಕ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಹಳ್ಳಿಖೇಡ (ಬಿ) 2 ಶೌಚಾಲಯ ಹಾಗೂ 2 ಸ್ನಾನದ ಗೃಹ ನಿರ್ಮಾಣ10.0019/10/201610.00010/11/201610.000 06/04/20179.86006/04/20179.8609.640CompletedCompleted 
52 BDR1632112082016-17MICROBidarHumnabadOthersSCP InstitutionalEducationOthersOthersPREDCEOAug 29 2016 12:00AM ಮೆಟ್ರಿಕ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ದುಬಲಗುಂಡಿ (ಪ್ರಸ್ತುತ ವಸತಿ ನಿಲಯದಲ್ಲಿರುವ ಬೋರವೆಲ್ ಅಂತರ್ಜಲ ಮಟ್ಟ ಕುಸಿದಿದ್ದು ನೀರನ ತೊಂದರೆಯಾಗಿರುವ ಪ್ರಯುಕ್ತ)ಹೊಸ ಬೋರವೆಲ್ ಕೋರೆವುದು ಹಾಗೂ ಮೋಟಾರ ಅಳವಡಿಸಿ ಪೈಪ ಲೈನ್ ಮಾಡಿಸುವುದು5.1828/11/20165.18012/12/20165.180 30/01/20172.61030/01/20172.6102.520CompletedCompleted 
53 BDR1632121492016-17MICROBidarHumnabadOthersTSP InstitutionalEducationOthersOthersKRIDLCEOJul 15 2016 12:00AMConstruction of One(1) class room ,Govt Higher Primary School (Urdu) Nagankera [Including electrification fans, light and plug provisions]Construction of One(1) class room ,Govt Higher Primary School (Urdu) Nagankera [Including electrification fans, light and plug provisions]7.0006/12/20167.00025/03/20177.000  0.00006/12/20167.0006.930CompletedCompleted TSP
54 BDR1632121502016-17MICROBidarHumnabadOthersTSP InstitutionalWomen & ChildOthersOthersKRIDLCEOJul 15 2016 12:00AMConstruction of One Model Aganwadi in (UDABNALLI-1)- UDABNALLI Village [Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.]Construction of One Model Aganwadi in (UDABNALLI-1)- UDABNALLI Village [Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.]13.7506/12/201613.75025/03/201713.750  0.00006/12/201613.75013.610CompletedCompleted TSP
55 BDR1632122162016-17MICROBidarHumnabadOthersTSP InstitutionalBCMOthersOthersPREDCEOJan 1 1900 12:00AM ಮೆಟ್ರಿಕ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಹುಮನಾಬಾದ ಹೆಚ್ಚುವರಿ ಕೋಣೆಗಳ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision) 19.9528/11/201619.95005/01/201719.950 17/03/201717.46018/03/201717.46016.980CompletedCompleted 
56 BDR1632131532016-17MICROBidarHumnabadOthersGeneralInstitutionalHealthOthersOthersKRIDLCEOJul 15 2016 12:00AM Staff Nourse Quarters Primary Health Center Bemalakheda Village with TWIN 2BHK [electrification,water supply and sanitiation] Staff Nourse Quarters Primary Health Center Bemalakheda Village with TWIN 2BHK [electrification,water supply and sanitiation]20.0006/12/201620.00025/03/201720.000  0.00006/12/201620.00019.800CompletedCompleted General
57 BDR1632131542016-17MICROBidarHumnabadOthersGeneralInstitutionalHealthOthersOthersKRIDLCEOJul 15 2016 12:00AM Staff Nourse Quarters Primary Health Center , NIRNA Village With TWIN 2 BHK [electrification,water supply and sanitiation] Staff Nourse Quarters Primary Health Center , NIRNA Village With TWIN 2 BHK [electrification,water supply and sanitiation]20.0006/12/201620.00025/03/201720.000  0.00006/12/201620.00019.800CompletedCompleted General
58 BDR1632131552016-17MICROBidarHumnabadOthersGeneralInstitutionalHealthOthersOthersRWSCEOJul 15 2016 12:00AMProviding Water Facility With Pumping Machinery Cistern And Pipe Line Primary Health Center NIRNAProviding Water Facility With Pumping Machinery Cistern And Pipe Line Primary Health Center NIRNA3.0007/10/20163.00018/10/20163.000  0.00031/12/20162.9301.970Completedಬೌತಿಕವಾಗಿ ಪೂರ್ಣಗೊಂಡಿದೆ. 
59 BDR1632131562016-17MICROBidarHumnabadOthersGeneralInstitutionalHealthOthersOthersRWSCEOJul 15 2016 12:00AMProviding Water Facility With Driking Water Purifier ,Community Health Center MANNA-E-KHELLI VILLAGEProviding Water Facility With Driking Water Purifier ,Community Health Center MANNA-E-KHELLI VILLAGE3.0007/10/20163.00018/10/20163.000 10/02/20172.94027/03/20172.9402.480Completed ಪೂರ್ಣಗೊಂಡಿದೆ. 
60 BDR1632131572016-17MICROBidarHumnabadOthersGeneralInstitutionalEducationOthersOthersPREDCEOJul 15 2016 12:00AM ಸರಕಾರಿ ಕಿರಿಯ ಪ್ರಾಥಮಿಕ ಶಾಲೆ ಕು.ಚಿಂಚೋಳಿ ಬಡಾವಣೆ ಶಾಲೆಯಲ್ಲಿ 2 ಕೋಣೆ ನಿರ್ಮಾಣ {Including electrification,fan and light.and plug provision}13.0021/09/201613.00014/11/201613.000 31/01/201711.87031/01/201711.87011.810CompletedCompleted 
61 BDR1632131582016-17MICROBidarHumnabadOthersGeneralInstitutionalEducationOthersOthersPREDCEOJul 15 2016 12:00AM Construction of 01 rooms building to govt. school building in LR.PR. school at Mugnoor village in Humanabad tq6.5019/10/201613.00025/11/201613.000 30/01/201711.59031/01/201711.5905.620CompletedCompleted 
62 BDR1632131592016-17MICROBidarHumnabadOthersGeneralInstitutionalEducationOthersOthersPREDCEOJul 15 2016 12:00AM ಸರಕಾರಿ ಕಿರಿಯ ಪ್ರಾಥಮಿಕ ಶಾಲೆ ಚಂದನಹಳ್ಳಿ (ಬಡಾವಣೆ), ಕು.ಚಿಂಚೋಳಿ ಬಡಾವಣೆ, ಲಾಲಧರಿ ತಾಂಡಾ, ಉರ್ದು ಜಲಸಿಂಗಿ ಹಾಗೂ ಸರಕಾರಿ ಹಿರಿಯ ಪ್ರಾಥಮಿಕ ಶಾಲೆ ಚಿನಕೇರಾ ಶಾಲೆಗಳಲ್ಲಿ ಅಡುಗೆ ಕೋಣೆ ನಿರ್ಮಾಣ {Including electrification,fan and light.and plug provision}20.0021/09/201620.00004/11/201620.000 13/02/201718.90015/02/201718.90011.260CompletedPhysically Completed 
63 BDR1632131642016-17MICROBidarHumnabadOthersGeneralInstitutionalWomen & ChildOthersOthersKRIDLCEOJul 15 2016 12:00AMConstruction of One Model Aganwadi in Polakapalli Village with Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.Construction of One Model Aganwadi in Polakapalli Village with Baby toilet,compound wall,bore well ,electrification,syntex over head tank,water pipeline to kitchen room,and fan and light plug points.13.7506/12/201613.75025/03/201713.750  0.00006/12/201613.75013.610CompletedCompleted General
64 BDR1632132042016-17MICROBidarHumnabadOthersGeneralInstitutionalHealthOthersOthersKRIDLCEOJul 15 2016 12:00AMConstruction of New Veterinery Dispensary Building at Manna-E-Khelli villageConstruction of New Veterinery Dispensary Building at Manna-E-Khelli village26.9206/12/201626.92025/03/201726.920  0.00006/12/201626.92026.650CompletedCompleted General
65 BDR1632132122016-17MICROBidarHumnabadOthersGeneralInstitutionalEducationOthersOthersPREDCEOAug 29 2016 12:00AM ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆ ವಳಖಿಂಡಿ ಗ್ರಾಮದಲ್ಲಿ 02 ಕೋಣೆಗಳ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision)13.0019/10/201613.00025/11/201613.000 06/03/201711.84006/03/201711.84010.380CompletedCompleted 
66 BDR1632132132016-17MICROBidarHumnabadOthersGeneralInstitutionalEducationOthersOthersPREDCEOAug 29 2016 12:00AM ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆ ಚಂದರನಹಳ್ಳಿ ಗ್ರಾಮದಲ್ಲಿ 02 ಕೋಣೆಗಳ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision)13.0019/10/201613.00025/11/201613.000 14/02/201712.90015/02/201712.90012.900CompletedCompleted 
67 BDR1632132142016-17MICROBidarHumnabadOthersGeneralInstitutionalEducationOthersOthersPREDCEOAug 29 2016 12:00AM ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆ ಚಿಟಗುಪ್ಪಾ ಪಟ್ಟಣದಲ್ಲಿ 02 ಕೋಣೆಗಳ ನಿರ್ಮಾಣ (Including Electrification,Fan & Light Fitting and Plug provision)13.0019/10/201613.00025/11/201613.000 02/02/201712.99002/02/201712.99012.920CompletedCompleted 
68 BDR1632211662016-17MICROBidarHumnabadOthersSCP InfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಘಾಟಬೋರಳ ದಿಂದ ಬಸವಕಲ್ಯಾಣ ತಾಲೂಕು ಗಡಿವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ95.4021/09/201695.40007/01/201795.40003/02/201710/05/201786.70014/06/201786.70079.640Completedphysically completedphysically completed & financially in progress
69 BDR1632211672016-17MICROBidarHumnabadOthersSCP InfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ರಾಂಪೂರ ದಿಂದ ಇಟಗಾ ರಸ್ತೆ ನಿರ್ಮಾಣ30.0021/09/201630.00003/11/201630.00003/02/201710/05/201727.96014/06/201727.96020.230Completedphysically completedphysically completed & financially in progress
70 BDR1632211682016-17MICROBidarHumnabadOthersSCP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMImprovements to Approch Road to Devgiri thanda From SH15 (Blance Length) in Humnabad Taluka (2.2km) Improvements to Approch Road to Devgiri thanda From SH15 (Blance Length) in Humnabad Taluka (2.2km) 64.0314/10/201664.03024/11/201664.03007/12/201627/01/201751.74006/02/201751.74049.640Completedcompleted 
71 BDR1632211692016-17MICROBidarHumnabadOthersSCP InfrastructureWater SupplyOthersOthersPREDCEOJul 15 2016 12:00AM ಹುಡಗಿ ಗ್ರಾಮದ ಇಂದಿರಾನಗರ ಎಸ್.ಸಿ ಓಣಿಯಲ್ಲಿ ಸಿ.ಸಿ ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ20.0028/11/201620.00027/12/201620.000 24/02/201719.64024/02/201719.64018.820CompletedCompleted 
72 BDR1632211712016-17MICROBidarHumnabadOthersSCP InfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding augmentation to MWS Scheme Extension area Hudgi (Ramnagar)Providing augmentation to MWS Scheme Extension area Hudgi (Ramnagar)11.3521/09/201611.35026/11/201611.350 21/02/20178.36014/03/20177.2005.640Completed ಪೂರ್ಣಗೊಂಡಿದೆ. 
73 BDR1632221722016-17MICROBidarHumnabadOthersTSP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಹುಮನಾಬಾದ ಪಟ್ಟಣದ ಎನ್.ಹೆಚ್ 9 ದಿಂದ ಶಿವಪೂರ ಜಂಕ್ಷನ್ ವರೆಗೆ (ವಾಯಾ, ಸಾಯಿ ಚಿತ್ರ ಮಂದಿರ) ರಸ್ತೆ ನಿರ್ಮಾಣ. 20.0014/10/201620.00007/12/201620.00012/12/201626/12/201618.09006/01/201718.09018.070CompletedCompleted, 
74 BDR1632221732016-17MICROBidarHumnabadOthersTSP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMImprovements to Approch Road to Nagankera From NH-9 -Nirna Basantpur MDR (Blance Length) in Humnabad Taluka (1.1km) Improvements to Approch Road to Nagankera From NH-9 -Nirna Basantpur MDR (Blance Length) in Humnabad Taluka (1.1km) 47.8414/10/201647.84024/11/201647.84007/12/201624/12/201641.08006/01/201741.08038.440CompletedCompleted 
75 BDR1632221742016-17MICROBidarHumnabadOthersTSP InfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ರಾಜ್ಯ ಹೆದ್ದಾರಿ-75 ರಿಂದ ರಾಂಪೂರ ವಾಯಾ, ಮುದನಾಳ ರಸ್ತೆ ನಿರ್ಮಾಣ ಕಿ.ಮೀ. 0.00 ರಿಂದ 1.4026.7121/09/201626.71003/11/201626.71003/02/201710/05/201723.53014/06/201723.53019.190Completedphysically completed physically completed & financially in progress
76 BDR1632221752016-17MICROBidarHumnabadOthersTSP InfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ರಾಜ್ಯ ಹೆದ್ದಾರಿ-75 ರಿಂದ ಕೂಡಂಬಲ್ ಗ್ರಾಮಕ್ಕೆ ಕೂಡು ರಸ್ತೆ ನಿರ್ಮಾಣ 22.0021/09/201622.00003/11/201622.00003/02/201710/05/201719.46014/06/201719.46019.190Completed completedPhysically completed & Financial in progress
77 BDR1632221762016-17MICROBidarHumnabadOthersTSP InfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AM ಹುನ್ನಳ್ಳಿ-ಸಿಂದಬಂದಗಿ ಜಿಲ್ಲಾ ಮುಖ್ಯ ರಸ್ತೆಯ ಕಿ.ಮೀ 6.00 ರಿಂದ 6.40 ವರೆಗೆ ಸಿ.ಸಿ.ಚರಂಡಿ ಹಾಗೂ ರಸ್ತೆ ನಿರ್ಮಾಣ.25.0021/09/201625.00004/11/201625.000 30/01/201722.13031/01/201722.13021.760CompletedCompleted 
78 BDR1632221772016-17MICROBidarHumnabadOthersTSP InfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding augmentation to MWS Scheme Extension area kankatta Providing augmentation to MWS Scheme Extension area kankatta 8.0007/10/20168.00018/10/20168.000 05/01/20177.09003/02/20176.5105.130Completedಪೂರ್ಣಗೊಂಡಿದೆಪೂರ್ಣಗೊಂಡಿದೆ
79 BDR1632221782016-17MICROBidarHumnabadOthersTSP InfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding OHT and rising main pipeline kabirabad wadiProviding OHT and rising main pipeline kabirabad wadi15.4321/09/201615.43026/11/201615.430 21/02/201715.30014/03/201715.01014.080Completed ಪೂರ್ಣಗೊಂಡಿದೆ. 
80 BDR1632231792016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಹಳ್ಳೀಖೇಡ (ಬಿ) ಗ್ರಾಮದ ಬಸವೇಶ್ವರ ವೃತ್ತದಿಂದ ಆರ್ಯಸಮಾಜ ಭವನದವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ಹಾಗೂ ಚರಂಡಿ ನಿರ್ಮಾಣ.70.0014/10/201670.00022/11/201670.00007/12/201608/02/201762.00027/02/201762.00059.840Completedcompleted 
81 BDR1632231802016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ರಾಜ್ಯ ಹೆದ್ದಾರಿ-50 ರಿಂದ ಹಳ್ಳಿಖೇಡ (ಬಿ) ಗ್ರಾಮಕ್ಕೆ ಕೂಡು ರಸ್ತೆ ನಿರ್ಮಾಣ96.0014/10/201696.00030/11/201696.00007/12/201601/03/201784.52009/03/201784.52081.340CompletedCompleted  
82 BDR1632231812016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಹುಮನಾಬಾದ ಪಟ್ಟಣದ ಸೂಪರ್ ಫಂಕ್ಷನ್ ಹಾಲ್ ದಿಂದ ನೀಲಮ್ಮಾ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನುರ್ಮಾಣ20.0014/10/201620.00017/11/201620.00007/12/201623/12/201617.25006/01/201717.25015.850CompletedCompleted 
83 BDR1632231822016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AM ಹುಮನಾಬಾದ ಪಟ್ಟಣದ ಟೀಚರ್ಸ ಕಾಲೋನಿಯಲ್ಲಿ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ10.0014/10/201610.00004/11/201610.00010/11/201608/12/20169.98016/12/20169.1408.960CompletedCompleted 
84 BDR1632231832016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಅಲ್ಲೂರ ದಿಂದ ಮದರಗಾಂವ ವರೆಗೆ ರಸ್ತೆ ಡಾಂಬರೀಕರಣ (ಕಿ.ಮೀ0.00 ರಿಂದ 3.30)40.0021/09/201640.00003/11/201640.00006/03/201719/05/201743.47006/09/201743.47040.570Completedcompleted  
85 BDR1632231842016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಮದರಗಾಂವ ದಿಂದ ಮಲ್ಕಾಪೂರ ವಾಡಿ ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ0.00 ರಿಂದ1.00)30.0021/09/201630.00003/11/201630.00006/03/201719/05/201732.62006/09/201732.62031.980Completed completed
86 BDR1632231852016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಹುಡಗಿ ದಿಂದ ಸಿಂಧನಕೇರಾ ವರೆಗೆ ರಸ್ತೆ ಡಾಂಬರೀಕರಣ (ಕಿ.ಮೀ0.00 ರಿಂದ 2.40)30.0013/10/201630.00003/11/201630.00006/03/201719/05/201732.56006/09/201732.56032.000Completed Completed
87 BDR1632231862016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ರಾ.ಹೆ. 150- ಎನ್.ಹೆಚ್-9 (ಎಮ್.ಡಿ.ಆರ್) ದಿಂದ ಸಿತಾಳಗೇರಾ ವರೆಗೆ ರಸ್ತೆ ಸುಧಾರಣೆ25.0013/10/201625.00003/11/201625.00006/03/201719/05/201726.82006/09/201726.82023.960Completed completed
88 BDR1632231872016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ದುಬಲಗುಂಡಿ ದಿಂದ ಹುಣಸಗೇರಾ ವಾಯಾ, ಸೋನಕೇರಾ ರಸ್ತೆ ನಿರ್ಮಾಣ100.0013/10/2016100.00004/01/2017100.00006/03/201719/05/2017108.19006/09/2017108.190107.610Completedcompleted  
89 BDR1632231882016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AMImprovements of Road Bemalkheda to Telengana Border in humanabad Taluka (2.5 Km)Improvements of Road Bemalkheda to Telengana Border in humanabad Taluka (2.5 Km)100.0013/10/2016100.00004/01/2017100.00006/03/201719/05/2017105.56006/09/2017105.560103.170Completed completed 
90 BDR1632231892016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AMImprovements to Road From Manna-E-Kheeli to NH-9-Nirna-Basantpur MDRA humanabad Taluka (2.00 Km)Improvements to Road From Manna-E-Kheeli to NH-9-Nirna-Basantpur MDRA humanabad Taluka (2.00 Km)80.0013/10/201680.00004/01/201780.00006/03/201719/05/201786.43006/09/201786.43083.650Completedcompleted
91 BDR1632231902016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AM Construction of CC Road And Drain from Basveshawar Circle to SBH Bank, lachangar house to Kumbar Ayyappa house, Khatkur Galli to Ashok kirana House, Sargar Babu house To Khasempure shop & Milk dairy society to PKPS in NIRNA Village, HUMNABAD Taluka Construction of CC Road And Drain from Basveshawar Circle to SBH Bank, lachangar house to Kumbar Ayyappa house, Khatkur Galli to Ashok kirana House, Sargar Babu house To Khasempure shop & Milk dairy society to PKPS in NIRNA Village, HUMNABAD Taluka20.0021/09/201620.00004/11/201620.000 17/03/201718.13018/03/201718.13016.570CompletedCompleted 
92 BDR1632231912016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AM ಧುಮ್ಮನಸೂರ ಗ್ರಾಮದ ಬಾಬುರಾವ ಬುರ್ಕಿ ಮನೆಯಿಂದ ಹನುಮಾನ ಮಂದಿರವರೆಗೆ ಸಿ.ಸಿ ರಸ್ತೆ ನಿರ್ಮಾಣ.10.5221/09/201610.50004/11/201610.520 06/03/20179.09007/03/20179.0909.090CompletedCompleted 
93 BDR1632231922016-17MICROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AM Construction of CC Road And Drain from Chitaguppa Road to Basaweshawar Circle, Basaveshwar circle to Nirna-Udbal road, Paramma house to Kallappa Solpur house & Kallappa Solpur house to Nala in UDBAL Village, HUMNABAD Taluka Construction of CC Road And Drain from Chitaguppa Road to Basaweshawar Circle, Basaveshwar circle to Nirna-Udbal road, Paramma house to Kallappa Solpur house & Kallappa Solpur house to Nala in UDBAL Village, HUMNABAD Taluka17.2521/09/201617.25004/11/201617.250 22/03/201716.52022/03/201716.52014.990CompletedCompleted 
94 BDR1632231932016-17MICROBidarHumnabadOthersGeneralInfrastructureWater SupplyOthersOthersPREDCEOJul 15 2016 12:00AM ಮುಸ್ತರಿ ಗ್ರಾಮದ ಮುಖ್ಯ ರಸ್ತೆಯಿಂದ ನಾಗಶೆಟ್ಟಿ ತಂಗಾ ಅಂಗಡಿ ವರೆಗೆ ಸಿ.ಸಿ ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ15.3828/11/201615.38027/12/201615.380 24/03/201713.20024/03/201713.20013.170CompletedCompleted  
95 BDR1632231942016-17MICROBidarHumnabadOthersGeneralInfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding augmentation to MWS Scheme SitalgeraProviding augmentation to MWS Scheme Sitalgera10.0021/09/201610.00018/10/201610.000 21/12/20168.69005/01/20178.4206.410Completedಪೂರ್ಣಗೊಂಡಿದೆ. 
96 BDR1632231952016-17MICROBidarHumnabadOthersGeneralInfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding augmentation to PWS Scheme BorampalliProviding augmentation to PWS Scheme Borampalli15.0007/10/201615.00026/11/201615.000 22/02/201712.39020/03/201711.0809.850CompletedPhysically CompletedPhysically Completed
97 BDR1632231962016-17MICROBidarHumnabadOthersGeneralInfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding MWS Scheme HandikeraProviding MWS Scheme Handikera10.0007/10/201610.00018/10/201610.000 05/01/20177.98010/01/20177.2106.890Completed ಪೂರ್ಣಗೊಂಡಿದೆ. ಪೂರ್ಣಗೊಂಡಿದೆ.
98 BDR1632231972016-17MICROBidarHumnabadOthersGeneralInfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding augmentation to PWS Scheme GhodwadiProviding augmentation to PWS Scheme Ghodwadi15.0007/10/201615.00026/11/201615.000 22/02/201712.40020/03/201710.7709.130Completedಪೂರ್ಣಗೊಂಡಿದೆ.ಪೂರ್ಣಗೊಂಡಿದೆ.
99 BDR1632231982016-17MICROBidarHumnabadOthersGeneralInfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding augmentation to PWS Scheme GhatboralProviding augmentation to PWS Scheme Ghatboral15.0007/10/201615.00026/11/201615.000 22/02/201714.91020/03/201713.42013.290Completedಪೂರ್ಣಗೊಂಡಿದೆ.ಪೂರ್ಣಗೊಂಡಿದೆ.
100 BDR1632231992016-17MICROBidarHumnabadOthersGeneralInfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding augmentation to MWS Scheme near BSSK Hallikhed(B)Providing augmentation to MWS Scheme near BSSK Hallikhed(B)10.0021/09/201610.00018/10/201610.000 21/12/20169.73009/01/20178.1707.140Completed ಪೂರ್ಣಗೊಂಡಿದೆ. ಪೂರ್ಣಗೊಂಡಿದೆ.
101 BDR1632232002016-17MICROBidarHumnabadOthersGeneralInfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding rising main pipe line and Pumpset ManiknagarProviding rising main pipe line and Pumpset Maniknagar10.0007/10/201610.00018/10/201610.000 09/01/20179.94024/01/20178.5208.510Completedಪೂರ್ಣಗೊಂಡಿದೆ. ಪೂರ್ಣಗೊಂಡಿದೆ.
102 BDR1642131222016-17MICROBidarBidarOthersGeneralInstitutionalEducationOthersOthersPWDDCJul 15 2016 12:00AM ಬೀದರ ಪಟ್ಟಣದ ಮುಸ್ತಾಯಿಪುರ ಸರಕಾರಿ ಪ್ರೌಢ ಶಾಲೆಗೆ ಎರಡು ಕೋಣೆಗಳ ನಿರ್ಮಾಣ. .{Including electrification,fan and light.and plug provision}13.0014/10/201613.00026/11/201613.00007/12/201623/12/201611.38006/01/201711.3808.920CompletedCompleted 
103 BDR1642211262016-17MICROBidarBidarOthersSCP InfrastructureRoads & BridgesOthersOthersCMCDCJul 15 2016 12:00AM ಬೀದರ ಪಟ್ಟಣ ಆನಂದ ನಗರದ ರವಿ ಕಿರಾಣಾ ಅಂಗಡಿಯಿಂದ ವಿನೋದ ಮನೆವರೆಗೆ ಸಿ.ಸಿ ರಸ್ತೆ ನಿರ್ಮಾಣ ಹಾಗೂ ಬಾಬುರಾವ ಮನೆಯಿಂದ ಜನವಾಡಕರ ಮನೆವರೆಗೆ ಚರಂಡಿ ನಿರ್ಮಾಣ ಹಾಗೂ ಇಂದು ಎಮಂ. ನಿವಾಸದಿಂದ ದೀನೆ ನಿವಾಸವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ.20.0022/11/201620.00011/12/201620.00003/01/201730/03/20170.00011/04/201719.61019.890CompletedWork CompletedWORK COMPLETED
104 BDR1642211272016-17MICROBidarBidarOthersSCP InfrastructureRoads & BridgesOthersOthersCMCDCJul 15 2016 12:00AM ಬೀದರ ಪಟ್ಟಣದ ಕುಂಬಾರವಾರ್ಡದ ಹನುಮಾನ ಮಂದಿರದಿಂದ ಬಾಬುರಾವ ಡಾವಣಗಾಂವ ಮನೆವರೆಗೆ ಹಾಗೂ ಮೈಲೂರ ಕಾಲೋನಿಯ ಶ್ರಾವಣ ಮನೆಯಿಂದ ಸಿದ್ದಪ್ಪಾ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ಹಾಗೂ ಚರಂಡಿ ನಿರ್ಮಾಣ.34.1322/11/201634.13011/12/201634.13003/01/201730/03/20170.00006/04/201732.10032.080Completedwork completed work completed
105 BDR1642211282016-17MICROBidarBidarOthersSCP InfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AMCONSTRUCTION OF CC ROAD AND DRAIN From Under pass bridge (Entrance to Village) to Govt. Kannada School in HOKRANA (K) Village, BIDAR Taluka (Approach Road)CONSTRUCTION OF CC ROAD AND DRAIN From Under pass bridge (Entrance to Village) to Govt. Kannada School in HOKRANA (K) Village, BIDAR Taluka (Approach Road)23.1821/09/201623.18004/11/201623.180 31/03/201719.60031/03/201719.6005.330CompletedPhysically Completed 
106 BDR1642211292016-17MICROBidarBidarOthersSCP InfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AMCONSTRUCTION OF CC ROAD AND DRAIN from Panchayat Building to Hanuman temple at NAGOORA Village, BIDAR Taluka CONSTRUCTION OF CC ROAD AND DRAIN from Panchayat Building to Hanuman temple at NAGOORA Village, BIDAR Taluka 10.0017/10/201610.00010/11/201610.000 22/03/20178.97022/03/20178.9708.940CompletedCompleted 
107 BDR1642221302016-17MICROBidarBidarOthersTSP InfrastructureRoads & BridgesOthersOthersCMCDCJul 15 2016 12:00AM ಬೀದರ ಪಟ್ಟಣದ ಲುಂಬುನಿ ನಗರದ ನೌಬಾದ ಮುಖ್ಯ ರಸ್ತೆಯಿಂದ ರಾಮಚಂದ್ರ ನಗರ ರಸ್ತೆವರೆಗೆ ಹಾಗೂ ಮಾಲಗೊಂಡ ಕಾಲೋನಿಯ ವಿ.ಆರ್.ಎಲ್. ಎದುರುಗಡೆಯಿಂದ ( ವಾಯಾಹನುಮಾನ ಮಂದಿರ) ರಮೇಶ ಆಯಾಸಪೂರ ಮನೆವರೆಗೆ ಹಾಗೂ ವಿಜಯ ನಗರ ಕಾಲೋನಿಯ ಲಕ್ಷ್ಮಣ ಮನೆಯಿಂದ ರಾಜಶೇಖರ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ ರಸ್ತೆ ಹಾಗೂ ಚರಂಡಿ ನಿರ್ಮಾಣ. 34.4522/11/201634.45011/12/201634.45003/01/201730/03/20170.00006/04/201733.02031.580CompletedWork Completedwork completd
108 BDR1642221312016-17MICROBidarBidarOthersTSP InfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AMCONSTRUCTION OF CC ROAD AND DRAIN from Shamrao Hamma House to Gundappa Kamthana House , Shamrao Kote House to Dilip Bawge House, Isamil House to Moulana House, Khutub House to Anganwadi, Layak ali hotel to Asur khan of Block No:4,5,6 in BAGDAL Village, BIDAR TalukaCONSTRUCTION OF CC ROAD AND DRAIN from Shamrao Hamma House to Gundappa Kamthana House , Shamrao Kote House to Dilip Bawge House, Isamil House to Moulana House, Khutub House to Anganwadi, Layak ali hotel to Asur khan of Block No:4,5,6 in BAGDAL Village, BIDAR Taluka21.1221/09/201621.12004/11/201621.120 31/03/201718.94031/03/201718.94018.620CompletedCompleted 
109 BDR1642231322016-17MICROBidarBidarOthersGeneralInfrastructureRoads & BridgesOthersOthersCMCDCJul 15 2016 12:00AM ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ:23, 24 & 34 ರ ಗರೀಬ ಕಾಲೋನಿಯ ಖಾಸಿಂ ಮನೆಯಿಂದ ಪುಂಡಲಿಕ ಸೆಂಟರಿಂಗ್ ವಾಯ ಕಲ್ಲಪ್ಪಾ ಮನೆಯವರೆಗೆ ಹಾಗೂ ಅನೀಲಕುಮಾರ ಮನೆಯಿಂದ ತಿಪ್ಪಣ್ಣಾ ಮನೆಯವರೆಗೆ ಹಾಗೂ ಚಿದ್ರಿ ಕಾಲೋನಿಯ ಸುಂದ್ರಮ್ಮಾ ಹಾಲಹಳ್ಳೆ ಮೆನೆಯಿಂದ ಬಾಬು ಏರಫೊರ್ಸ ಮನೆಯವರೆಗೆ ಹಾಗೂ ಮಕದುಮಜಿ ಕಾಲೋನಿಯ ಲಕ್ಕಿ ಟ್ರೇಡರ್ಸ್ ಮನೆಯಿಂದ ಮುದಾಸೀರ ಖಾನ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ60.0322/11/201660.03011/12/201660.03003/01/201730/03/20170.00006/04/201756.52049.710CompletedCompletedCompleted
110 BDR1642231332016-17MICROBidarBidarOthersGeneralInfrastructureRoads & BridgesOthersOthersCMCDCJul 15 2016 12:00AM ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 16 ರ ದೇವಿ ಕಾಲೋನಿ ಡೇಜೋಡೆ ಮನೆಯಿಂದ ರಮೇಶ ಪಾಂಡೆ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ.20.0022/11/201620.00011/12/201620.00003/01/201730/03/20170.00006/04/201718.82020.750CompletedWork Completed 
111 BDR1642231342016-17MICROBidarBidarOthersGeneralInfrastructureRoads & BridgesOthersOthersCMCDCJul 15 2016 12:00AM ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 16 ರ ಹೌಸಿಂಗ ಬೋರ್ಡ ಕಾಲೋನಿಯ ಚಿಮಕೋಡೆ ಮನೆಯಿಂದ ಬಂಡೆಪ್ಪಾ ಕಿರಾಣಾ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ.20.0022/11/201620.00011/12/201620.00003/01/201730/03/20170.00006/04/201718.82016.730CompletedWork Completed 
112 BDR1642231352016-17MICROBidarBidarOthersGeneralInfrastructureRoads & BridgesOthersOthersCMCDCJul 15 2016 12:00AM ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 25 ರ ಬಿಲಾಲ ಕಾಲೋನಿ ಮುಖ್ಯ ರಸ್ತೆಯಿಂದ ಜಾಸ್ಮಿನ ಕಾಲೇಜ ವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ20.0022/11/201620.00011/12/201620.00003/01/201730/03/20170.00006/04/201718.80018.750CompletedWork Completed 
113 BDR1642231362016-17MICROBidarBidarOthersGeneralInfrastructureRoads & BridgesOthersOthersCMCDCJul 15 2016 12:00AM ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 25 ರ ಬಿಲಾಲ ಕಾಲೋನಿಯ ತಾಜು ಮೆನೆಯಿಂದ ಖಾಲೀದ ಮನೆ ವಾಯಾ ಪಂಪ್ ಹೌಸ್ ವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ20.0022/11/201620.00011/12/201620.00003/01/201730/03/20170.00006/04/201718.80018.750CompletedWork Completed 
114 BDR1642231372016-17MICROBidarBidarOthersGeneralInfrastructureRoads & BridgesOthersOthersCMCDCJul 15 2016 12:00AM ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ: 32ರ ಜೇರುಸಲೇಮ ಕಾಲೋನಿಯ ಕುಮಾರ ಮನೆಯಿಂದ ನಂದು ಸ್ವಾಮಿ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ.16.0022/11/201616.00011/12/201616.00003/03/201730/03/20170.00006/04/201715.05016.050Completedwork completed 
115 BDR1642231382016-17MICROBidarBidarOthersGeneralInfrastructureRoads & BridgesOthersOthersCMCDCJul 15 2016 12:00AM ಬೀದರ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ:24 ರ ಸಿದ್ರಾಮಯ್ಯಾ ಬಡಾವಣೆಯ ಚಿದ್ರಿ ರಿಂಗ್ ರೋಡ ದಿಂದ ಮುಜೀಬ ಮನೆಯವರೆಗೆ (ವಾಯ ಶಾಹಿನ ಕಾಜೇನ) ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ16.0022/11/201616.00011/12/201616.00003/01/201730/03/201715.05006/04/201715.05013.980CompletedWORK COMPLETEDWORK COMPLETED
116 BDR1642231392016-17MICROBidarBidarOthersGeneralInfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AMCONSTRUCTION OF BT/CC ROAD AND DRAIN from Marigemma Temple to PKPS in Block no.1 and Mainoddin house to Mahebub house in Block no.1, Naseer Jeneral Store to Pasha Flour mill in Block 2 & 3, Narsing house to Miraz vegitable shop in Block 2 & 3, Goswamy Subhash house to Alimoddin Bank in Block 4&5, Ibrahim Syed ali house to Hair Prize Shop in Block 5, Eshappa house to Erappa house in Block 2, Abdul Latif house to Abdul Khan house in Block 3, Shankreppa Hudagi house to Bangla Sultan in Block 3, Asur khan to Gulam sab Kirana Shop in Block 4, Chinumiya house to Akram house in Block 4, Nisar Ahemmed house to Jabber Papad in Block 3&4, Urdu School to Zameer Sunar house in Block 3&4, Naseer Tower to Mahebub Mosen house in Block 1, Muneer Tambuli house to Dastagir Khuran in Block 1, Usman ali house TO Sharif Khureshi house in Block 1& 2, Abdul Zalil house to Mustak Husain havaladar (Near Darga)in Block 1, Khayum house to Mousque in Block 1, Phozaz ali house to Khaser Pasha house in Block 1, BT Road to Police Station in Block 7, Babumiya mouli house to Husain sab house in Block 5, Basavanappa house to Kashinath Dhanur house in Block 5, Maruti Gorgi house to Channappa Andoor house in Block 5, Margemma Temple to PKPS in Block no.1, Gram Panchayath to Dilip Bawagi house in Block 4&5, Old ING Vysya Bank building to Sharfuddin tadpalli house in Block 2&3, Bituminous Road from Police Station to Urdu school (Main Road) in Block 2,3,5, Bituminous Road from Bus stand to State highway via PHC & darga, Gram Panchayath to Dilip Bawagi in Block 4&5, Malshetty Poshetty house to graveyard in Block 6, and Fhakroddin Arbaj ali house to Vikram house in Block 7 in BAGDAL Village, BIDAR TalukaCONSTRUCTION OF BT/CC ROAD AND DRAIN from Marigemma Temple to PKPS in Block no.1 and Mainoddin house to Mahebub house in Block no.1, Naseer Jeneral Store to Pasha Flour mill in Block 2 & 3, Narsing house to Miraz vegitable shop in Block 2 & 3, Goswamy Subhash house to Alimoddin Bank in Block 4&5, Ibrahim Syed ali house to Hair Prize Shop in Block 5, Eshappa house to Erappa house in Block 2, Abdul Latif house to Abdul Khan house in Block 3, Shankreppa Hudagi house to Bangla Sultan in Block 3, Asur khan to Gulam sab Kirana Shop in Block 4, Chinumiya house to Akram house in Block 4, Nisar Ahemmed house to Jabber Papad in Block 3&4, Urdu School to Zameer Sunar house in Block 3&4, Naseer Tower to Mahebub Mosen house in Block 1, Muneer Tambuli house to Dastagir Khuran in Block 1, Usman ali house TO Sharif Khureshi house in Block 1& 2, Abdul Zalil house to Mustak Husain havaladar (Near Darga)in Block 1, Khayum house to Mousque in Block 1, Phozaz ali house to Khaser Pasha house in Block 1, BT Road to Police Station in Block 7, Babumiya mouli house to Husain sab house in Block 5, Basavanappa house to Kashinath Dhanur house in Block 5, Maruti Gorgi house to Channappa Andoor house in Block 5, Margemma Temple to PKPS in Block no.1, Gram Panchayath to Dilip Bawagi house in Block 4&5, Old ING Vysya Bank building to Sharfuddin tadpalli house in Block 2&3, Bituminous Road from Police Station to Urdu school (Main Road) in Block 2,3,5, Bituminous Road from Bus stand to State highway via PHC & darga, Gram Panchayath to Dilip Bawagi in Block 4&5, Malshetty Poshetty house to graveyard in Block 6, and Fhakroddin Arbaj ali house to Vikram house in Block 7 in BAGDAL Village, BIDAR Taluka70.0021/09/201670.00015/12/201670.000 06/10/201767.94007/10/201767.94058.400CompletedPhysically Completed 
117 BDR1642231402016-17MICROBidarBidarOthersGeneralInfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AMCONSTRUCTION OF CC ROAD AND DRAIN from NH-9 to Hanuman Temple, Karibasappa Asram (Matha) to Hanamanth Biradar house in MARKUNDA VILLAGE, BIDAR Taluka CONSTRUCTION OF CC ROAD AND DRAIN from NH-9 to Hanuman Temple, Karibasappa Asram (Matha) to Hanamanth Biradar house in MARKUNDA VILLAGE, BIDAR Taluka 20.0021/09/201620.00004/11/201620.000 31/03/201717.97031/03/201717.97017.970CompletedCompleted 
118 BDR1642231412016-17MICROBidarBidarOthersGeneralInfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AMCONSTRUCTION OF CC ROAD AND DRAIN from Gurunath Panchal house to Chandrakanth Patil house, Rajkumar Patil house to Laxmi Temple & Chandrkanth Patil house to Manohar Panchal house in BHANGOOR VILLAGE, BIDAR TalukaCONSTRUCTION OF CC ROAD AND DRAIN from Gurunath Panchal house to Chandrakanth Patil house, Rajkumar Patil house to Laxmi Temple & Chandrkanth Patil house to Manohar Panchal house in BHANGOOR VILLAGE, BIDAR Taluka15.4421/09/201615.44004/11/201615.440 22/03/201714.62022/03/201714.62014.530CompletedCompleted  
119 BDR1652120472016-17MICROBidarBasvakalyanOthersTSP InstitutionalSWOthersOthersPREDCEOJul 15 2016 12:00AM ಮೇಟ್ರಿಕ್ ಪೂರ್ವ ಬಾಲಕರ ವಸತಿ ನಿಲಯ ಎರಬಾಗಕ್ಕೆ ಅಡುಗೆ ಕೋಣೆ ಹಾಗೂ ಡೈನಿಂಗ್ ಹಾಲನ್ನು ನಿರ್ಮಾಣ.[including electrification,exhunt fan ,light and plug points provision]10.0021/09/201610.00013/10/201610.000 30/01/20179.74031/01/20179.7409.070CompletedCompleted 
120 BDR1652122382016-17MICROBidarBasvakalyanOthersTSP InstitutionalEducationOthersOthersPREDCEODec 19 2016 12:00AMConstruction of Additional 03 Rooms at Govt High School Gadlegaon (B)village. (Including Electrification.Fan &Light fitting and plug provision)Construction of Additional 03 Rooms at Govt High School Gadlegaon (B)village. (Including Electrification.Fan &Light fitting and plug provision)19.5024/12/201619.50005/01/201719.500 24/03/201718.97024/03/201718.97018.030CompletedCompleted 
121 BDR1652130482016-17MICROBidarBasvakalyanOthersGeneralInstitutionalHealthOthersOthersPREDCEOJul 15 2016 12:00AM ಸಮುದಾಯ ಆರೋಗ್ಯ ಕೇಂದ್ರ ರಾಜೇಶ್ವರ ಗ್ರೂಪ ಡಿ ನೌಕರರ ವಸತಿ ಗೃಹ ನಿರ್ಮಾಣ. [including electrification,water supply,and sanitation]6.0021/09/20166.00013/10/20166.000 30/01/20175.35031/01/20175.3505.270CompletedCompleted 
122 BDR1652130502016-17MICROBidarBasvakalyanOthersGeneralInstitutionalEducationOthersOthersPWDDCJul 15 2016 12:00AMConstruction of government junior college,additional three rooms ,Basvakalyan.[including electrification,fan lights and plug points provision]Construction of government junior college,additional three rooms ,Basvakalyan.[including electrification,fan lights and plug points provision]22.5014/10/201622.50013/02/201722.50017/01/201725/02/201722.06025/02/201719.90019.900Completedcompleted 
123 BDR1652130512016-17MICROBidarBasvakalyanOthersGeneralInstitutionalEducationOthersOthersPREDCEOJul 15 2016 12:00AMConstruction of additional 2 Class rooms at Government High school Manthal [including electrification,fan lights and plug points provision]Construction of additional 2 Class rooms at Government High school Manthal [including electrification,fan lights and plug points provision]13.0021/09/201613.00004/11/201613.000 13/02/201711.99014/02/201711.99011.990CompletedCompleted 
124 BDR1652130522016-17MICROBidarBasvakalyanOthersGeneralInstitutionalEducationOthersOthersPREDCEOJul 15 2016 12:00AM ತಡೋಳಾ ಸ.ಹಿ.ಪ್ರಾ ಶಾಲೆಗೆ (ಕನ್ನಡ) ಹಾಗೂ (ಉರ್ದು) ಹೆಚ್ಚುವರಿ ಕೋಣೆ ನಿರ್ಮಾಣ [including electrification,fan lights and plug points provision]13.0021/09/201613.00004/11/201613.000 30/01/201711.78031/01/201711.7805.050CompletedPhysically Completed 
125 BDR1652132292016-17MICROBidarBasvakalyanOthersGeneralInstitutionalSWOthersOthersPREDCEOSep 21 2016 12:00AMConstruction of pre-matric Boys Hostel 50 Boys 5 No rooms Mudbi village (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of pre-matric Boys Hostel 50 Boys 5 No rooms Mudbi village (Including Electrification,Fan & Light Fitting and Plug Provision)35.0029/12/201635.00005/01/201735.000 24/03/201731.60024/03/201731.60030.620CompletedCompleted 
126 BDR1652132302016-17MICROBidarBasvakalyanOthersGeneralInstitutionalSWOthersOthersPREDCEOSep 21 2016 12:00AMConstruction of pre-matric Boys Hostel 50 Boys 5 No rooms harkud village (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of pre-matric Boys Hostel 50 Boys 5 No rooms harkud village (Including Electrification,Fan & Light Fitting and Plug Provision)35.0029/12/201635.00005/01/201735.000 03/05/201733.47003/05/201733.47022.180CompletedCompleted 
127 BDR1652132312016-17MICROBidarBasvakalyanOthersGeneralInstitutionalEducationOthersOthersPREDCEOSep 21 2016 12:00AMConstruction of additional 3 rooms Govt School at Janwada village (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of additional 3 rooms Govt School at Janwada village (Including Electrification,Fan & Light Fitting and Plug Provision)19.5024/12/201619.50005/01/201719.500 11/05/201719.27011/05/201719.27018.960CompletedCompleted 
128 BDR1652132322016-17MICROBidarBasvakalyanOthersGeneralInstitutionalEducationOthersOthersPWDDCSep 21 2016 12:00AMConstruction of additional 5 rooms Govt School at Harkud village (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of additional 5 rooms Govt School at Harkud village (Including Electrification,Fan & Light Fitting and Plug Provision)32.5023/11/201632.50030/12/201632.50002/01/201717/01/201728.55019/01/201728.55020.840Completedcompleted 
129 BDR1652132332016-17MICROBidarBasvakalyanOthersGeneralInstitutionalEducationOthersOthersPWDDCSep 21 2016 12:00AMConstruction of additional 5 rooms Govt School at Chitta village (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of additional 5 rooms Govt School at Chitta village (Including Electrification,Fan & Light Fitting and Plug Provision)32.5023/11/201632.50030/12/201632.50002/01/201717/01/201728.53019/01/201728.53028.400Completedcompleted 
130 BDR1652132342016-17MICROBidarBasvakalyanOthersGeneralInstitutionalEducationOthersOthersPWDDCSep 21 2016 12:00AMConstruction of additional 5 rooms at Govt primary School Ummapur (Including Electrification,Fan & Light Fitting and Plug Provision)Construction of additional 5 rooms at Govt primary School Ummapur (Including Electrification,Fan & Light Fitting and Plug Provision)32.5015/12/201632.50030/12/201632.50002/01/201717/01/201729.68019/01/201729.68029.530Completedcompleted 
131 BDR1652210572016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding CC Road and Drain with Lad Masjid to BSNL office 200mtrs at Basavakalyan TqProviding CC Road and Drain with Lad Masjid to BSNL office 200mtrs at Basavakalyan Tq10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.72016/12/20169.3209.210CompletedCOMPLETED 
132 BDR1652210582016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMConstruction C C Road & Drain Babuvithoba House to Tajodin Kaddewala (Engineering Shop) 200Mtr ward no 14 at Sharanagar (SC) Colony Basavakalyan CityConstruction C C Road & Drain Babuvithoba House to Tajodin Kaddewala (Engineering Shop) 200Mtr ward no 14 at Sharanagar (SC) Colony Basavakalyan City10.0014/10/201610.00014/11/201610.00011/11/201608/12/20169.73016/12/20169.1608.530CompletedCOMPLETED 
133 BDR1652210602016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMConstruction of CC drain Revan siddeshwar house to siddeshwar Temple to Dharmprakash School 350 Ft (SC) at sharanyya colony Basavakalyan city Construction of CC drain Revan siddeshwar house to siddeshwar Temple to Dharmprakash School 350 Ft (SC) at sharanyya colony Basavakalyan city 10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.73016/12/20169.3309.180CompletedCOMPLETED 
134 BDR1652210612016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding C C Road & Drains from Shivajingar Mainalle sir house to Channamma Gurayya Hiremath House 200 Mtr in Basavakalyan City Providing C C Road & Drains from Shivajingar Mainalle sir house to Channamma Gurayya Hiremath House 200 Mtr in Basavakalyan City 10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.92016/12/20168.5105.100CompletedCOMPLETED 
135 BDR1652210622016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMConstruction of Drain Vaijinath House to Hanmanthppa swamy House 100 Mtr ft at ashrya colony Basavakalyan city & Providing C C Road Jaffer from house to main Raod 100 Mtr at Ashreya colony Basavakalyan city Construction of Drain Vaijinath House to Hanmanthppa swamy House 100 Mtr ft at ashrya colony Basavakalyan city & Providing C C Road Jaffer from house to main Raod 100 Mtr at Ashreya colony Basavakalyan city 10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.95016/12/20168.9508.960CompletedCOMPLETED 
136 BDR1652210632016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMImprovements of Road from Banjara Colony to BK-Hulsoor Main Road at Basavakalyan City Improvements of Road from Banjara Colony to BK-Hulsoor Main Road at Basavakalyan City 23.0023/11/201623.00030/12/201623.00002/01/201717/01/201719.39019/01/201719.39019.060CompletedCOMPLETED 
137 BDR1652210642016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AMProviding CC road From Laxmi Temple to Gandhi Katta at Village Gokul via Parit house Gokul Tq: Basavakalyan Providing CC road From Laxmi Temple to Gandhi Katta at Village Gokul via Parit house Gokul Tq: Basavakalyan 10.0021/09/201610.00013/10/201610.000 02/02/20178.58003/02/20178.5807.500CompletedCompleted 
138 BDR1652210652016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AMProviding CC Road From Mangwada Ningawwa house to Dharam Shala at village Batgera Tq: Basavakalyan & Main road wadi to PKPS Bank 300mtrProviding CC Road From Mangwada Ningawwa house to Dharam Shala at village Batgera Tq: Basavakalyan & Main road wadi to PKPS Bank 300mtr10.0021/09/201610.00013/10/201610.000 02/02/20179.20003/02/20179.2009.150CompletedCompleted  
139 BDR1652210662016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AMProviding C C Road from Keshav Natkar house to Vishwamber Suryvanshi house 200 Mtr at Village Ladwanti Tq: BasavakalyanProviding C C Road from Keshav Natkar house to Vishwamber Suryvanshi house 200 Mtr at Village Ladwanti Tq: Basavakalyan10.0021/09/201610.00013/10/201610.000 02/02/20178.30002/02/20178.3008.030CompletedCompleted  
140 BDR1652210672016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDCEOOct 24 2017 12:00AMProviding C C Road from Babu Gaikwad house to Srimanth Gaikwad house 250 Mtr at Village Waddargaon Tq: BasavakalyanConstruction of C.C Road from Machindra Gaikwad house to Srimanth Gaikwad house at Waddargaon Village Basavakalyan Taluka11.8419/03/201811.84016/02/201811.84016/02/201814/03/201811.21026/03/201811.21011.170CompletedCompletedChange of work approved from hkrdb on 24.10.2017
141 BDR1652210682016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AM ಮಾಶಾಳ ತಾಂಡ ರಸ್ತೆ ನಿರ್ಮಾಣ ಮಾಡುವುದು.10.0021/09/201610.00010/11/201610.000 30/01/20178.76031/01/20178.7608.760CompletedCompleted 
142 BDR1652210692016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AM ಧನಗರ ವಾಡಿ ದಿಂದ ರೋಳಾವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ17.6521/09/201617.65004/11/201617.650 27/02/201714.19028/02/201714.19014.140CompletedCompleted  
143 BDR1652210702016-17MICROBidarBasvakalyanOthersSCP InfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding Augmentation of Piped Water Supply at Gadigoundgaon Village Tq: Basavakalyan Providing Augmentation of Piped Water Supply at Gadigoundgaon Village Tq: Basavakalyan 15.0021/09/201615.00008/11/201615.000 28/12/201614.66004/02/201612.85012.840CompletedPhysically Completed 
144 BDR1652210712016-17MICROBidarBasvakalyanOthersSCP InfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding Augmentation of Piped Water Supply at Bhosga Village Tq: Basavakalyan Providing Augmentation of Piped Water Supply at Bhosga Village Tq: Basavakalyan 49.0021/09/201649.00007/01/201749.000 20/03/201747.30005/05/201744.07037.690CompletedCompletedCompleted
145 BDR1652212392016-17MICROBidarBasvakalyanOthersSCP InfrastructureRoads & BridgesOthersOthersPREDCEOSep 21 2016 12:00AMProviding CC Road from Dayanand Suryavanshi SC Shmashan Bhoomi at Jajanmugli VillageProviding CC Road from Dayanand Suryavanshi SC Shmashan Bhoomi at Jajanmugli Village10.0008/12/201610.00012/12/201610.000 17/03/20178.79018/03/20178.7908.510CompletedCompleted  
146 BDR1652220722016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding C C Road at Rikshwa Colony to Rajkimar ward No. 5 at Basavakalyan City 200Mtr Providing C C Road at Rikshwa Colony to Rajkimar ward No. 5 at Basavakalyan City 200Mtr 10.0015/12/201610.00020/12/201610.00002/01/201717/01/20178.86019/01/20178.8608.860CompletedCompleted 
147 BDR1652220732016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding CC Drains with Top Slab infornt of Hanuman temple to Bhavani temple ST Colony Main Road Tripurant Providing CC Drains with Top Slab infornt of Hanuman temple to Bhavani temple ST Colony Main Road Tripurant 12.0014/10/201612.00017/12/201612.00002/01/201717/01/201710.55019/01/201710.55010.450CompletedCompleted 
148 BDR1652220742016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding CC Road from Laxman Shivaram Makade house to Narsing Mallesha Devnale house in Village Ilhal tq Basavakalyan Providing CC Road from Laxman Shivaram Makade house to Narsing Mallesha Devnale house in Village Ilhal tq Basavakalyan 12.0014/10/201612.00017/12/201612.00002/01/201717/01/201710.41019/01/201710.41010.390CompletedCompleted 
149 BDR1652220752016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersPREDCEOJul 15 2016 12:00AMProviding CC Road Berasha Sharanappa Pujari House to ambary Jamadar house, Rajappa Pujari House to Ashok Dhabu House & Sharnamma Jaganna Pujari house Maruti Pujari house (ST) 450 Mtr at Kohinoor Village Tq: BKProviding CC Road Berasha Sharanappa Pujari House to ambary Jamadar house, Rajappa Pujari House to Ashok Dhabu House & Sharnamma Jaganna Pujari house Maruti Pujari house (ST) 450 Mtr at Kohinoor Village Tq: BK15.3421/09/201615.34004/11/201615.340 21/03/201713.05022/03/201713.05013.040CompletedCompleted 
150 BDR1652220762016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಎಮ್.ಎಸ್. ಬಾರ್ಡರ ದಿಂದ ಹುಲಸೂರ ದಿಂದ ಮಹಾಗಾಂವ ವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ 37.00 ರಿಮದ 39.00)36.0716/11/201636.07006/01/201736.07031/01/201708/05/201735.62030/06/201735.62035.470Completedcompletedcompleted
151 BDR1652220772016-17MICROBidarBasvakalyanOthersTSP InfrastructureWater SupplyOthersOthersPMGSYCEOJul 15 2016 12:00AMImprovements to Road from Yalladgundi to Bhosga from km 0.00 2.0km in Basavakalyan Taluka Improvements to Road from Yalladgundi to Bhosga from km 0.00 2.0km in Basavakalyan Taluka 45.0013/10/201645.00003/11/201645.00031/01/201708/05/201744.09030/06/201744.09034.050CompletedPhysically completed IInd & Part Bill Recived (Rs.21.14 lakhs)
152 BDR1652220782016-17MICROBidarBasvakalyanOthersTSP InfrastructureWater SupplyOthersOthersRWSCEOJul 15 2016 12:00AMProviding Augmentation of Piped Water Supply at Kohinoor Village Tq: Basavakalyan Providing Augmentation of Piped Water Supply at Kohinoor Village Tq: Basavakalyan 30.0021/09/201630.00008/11/201630.000 14/03/201726.21003/05/201723.2207.750CompletedPhysically CompletedPhysically Completed
153 BDR1652220792016-17MICROBidarBasvakalyanOthersTSP InfrastructureRoads & BridgesOthersOthersRWSCEOJul 15 2016 12:00AMProviding Augmentation of Piped Water Supply at Jajanmugli Village Tq: Basavakalyan Providing Augmentation of Piped Water Supply at Jajanmugli Village Tq: Basavakalyan 40.0021/09/201640.00007/01/201740.000 20/03/201739.45003/05/201738.26038.020Completedಬೌತಿಕವಾಗಿ ಪೂರ್ಣಗೊಂಡಿದೆ. ಬೌತಿಕವಾಗಿ ಪೂರ್ಣಗೊಂಡಿದೆ.
154 BDR1652230802016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding CC Drains from NGO Colony to via Narshetty Petrolpump upto Bridge At Tripurant Basavakalyan City Providing CC Drains from NGO Colony to via Narshetty Petrolpump upto Bridge At Tripurant Basavakalyan City 15.0014/10/201615.00026/11/201615.00007/12/201624/12/201613.12006/01/201713.12031.120CompletedCOMPLETEDExpenditure: amount wrong entered, Correct Expenditure: amount 13.12 lakhs.
155 BDR1652230822016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding CC road From Shivareddy house to Kore house at Ganga Colony Ward NO. 18 Basavakalyan Providing CC road From Shivareddy house to Kore house at Ganga Colony Ward NO. 18 Basavakalyan 12.0014/10/201612.00006/01/201712.00017/01/201713/02/201711.93004/03/201710.3908.600CompletedCOMPLETED 
156 BDR1652230832016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding C C Road Vakare House to Rajkumar Khandre house 300Mtr Hiremath Colony Basvakalyan CityProviding C C Road Vakare House to Rajkumar Khandre house 300Mtr Hiremath Colony Basvakalyan City10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.95016/12/20168.3508.350CompletedCOMPLETED 
157 BDR1652230842016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding C C Road Deepak Gudda House to Babu Bunna House 300Mtr Gudda Colony Basavakalyan CityProviding C C Road Deepak Gudda House to Babu Bunna House 300Mtr Gudda Colony Basavakalyan City10.3115/12/201610.31030/12/201610.31002/01/201717/01/20178.66019/01/20178.6608.180CompletedCOMPLETED 
158 BDR1652230852016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding C C Road From Vaijappa Panchal house to Govind Rathod house at Ward No. 19 Basavakalyan City 250mtr Providing C C Road From Vaijappa Panchal house to Govind Rathod house at Ward No. 19 Basavakalyan City 250mtr 11.0015/12/201611.00030/12/201611.00002/01/201717/01/20179.06019/01/20179.0608.790CompletedCOMPLETED 
159 BDR1652230862016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding CC Road from Sidram Yenagunde House to Umesh Shilwant house at Ward No. 18, Basavakalyan City Providing CC Road from Sidram Yenagunde House to Umesh Shilwant house at Ward No. 18, Basavakalyan City 10.0011/01/201710.00016/02/201710.00025/02/201725/03/20179.97025/03/20178.5107.500CompletedCompleted 
160 BDR1652230872016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding C C Road From Nazim house to Mahebook Ali house at Allah nagar Ward No. 10 Basavakalyan City 200Mtr Providing C C Road From Nazim house to Mahebook Ali house at Allah nagar Ward No. 10 Basavakalyan City 200Mtr 10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.75016/12/20168.3207.940CompletedCOMPLETED 
161 BDR1652230882016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJul 15 2016 12:00AMProviding C C Road & CC Drain From Sharnappa Vithal Vai Balaji Temple to Hanuman Temple ward No. 3 at Kali Galli Basavakalyan City 200Mtr Providing C C Road & CC Drain From Sharnappa Vithal Vai Balaji Temple to Hanuman Temple ward No. 3 at Kali Galli Basavakalyan City 200Mtr 10.0014/10/201610.00004/11/201610.00011/11/201608/12/20169.72016/12/20168.1609.220CompletedCOMPLETED 
162 BDR1652230892016-17MICROBidarBasvakalyanOthersGeneralInstitutionalHealthOthersOthersPWDDCJul 15 2016 12:00AMConstruction of Public Toilets (Pay & use) at Govt. Hospital Basavakalyan Construction of Public Toilets (Pay & use) at Govt. Hospital Basavakalyan 12.0014/10/201612.00013/11/201612.00007/12/201626/12/201610.21006/01/201710.2107.270Completedcompleted 
163 BDR1652230902016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಚಿಕ್ಕನಾಗಾಂವದಿಂದ ಜನವಾಡಾ ರಸ್ತೆ ಕಿ.ಮೀ 0.00 ದಿಂದ 2.80100.0015/07/2016100.00010/02/2017100.00010/02/201705/06/201790.11030/06/201790.11078.160CompletedPhysically completed Physically completed-IVth & part Bill Recived (Rs.10.75lakhs)
164 BDR1652230912016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AMImprovement To road from Kohinoor to pahad ladvnthi from 0.00to 2.70 km. At Basavakalyan Taluka Improvement To road from Kohinoor to pahad ladvnthi from 0.00to 2.70 km. At Basavakalyan Taluka 75.0013/10/201675.00007/01/201775.00031/01/201727/05/201773.85029/06/201773.85031.950CompletedPhysically completed IVth & Part Bill (Rs.24.85 lakhs) Recived
165 BDR1652230922016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AMApproach Road From Kahanpur Village to ODP Road from 0.00 to 1.5km Kahanpur Village Basavkaalyan Taluka Approach Road From Kahanpur Village to ODP Road from 0.00 to 1.5km Kahanpur Village Basavkaalyan Taluka 50.0002/11/201650.00019/12/201650.00031/01/201727/05/201749.20029/06/201749.20024.910Completedphysically completed IVth & Part Bill (Rs. 19.00 lakhs) Recieved
166 BDR1652230932016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AMImprovement to road from Baasavanwadi to Devnal Village from km. 00.00 to 2.0kmImprovement to road from Baasavanwadi to Devnal Village from km. 00.00 to 2.0km70.0013/10/201670.00007/01/201770.00031/01/201727/05/201769.24029/06/201769.24014.520CompletedPhysically CompletedPhysically completed
167 BDR1652230942016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ರಾಜೇಶ್ವರ ದಿಂದ ಎನ್.ಎಚ್-9 ವಾಯ್ ಹಂದ್ರಾಳವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ 0.00 ರಿಂದ 5.00)80.0002/11/201680.00007/01/201780.00031/01/201727/05/201778.94029/06/201778.94057.010Completedphysically completedIVth & Part bil (Rs.15.28) Recived
168 BDR1652230952016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPMGSYCEOJul 15 2016 12:00AM ಯರಬಾಗ ದಿಂದ ರಾಂಪೂರ ವಾಡಿವರೆಗೆ ರಸ್ತೆ ನಿರ್ಮಾಣ (ಕಿ.ಮೀ 0.00 ರಿಂದ 5.00)43.8613/10/201643.86003/11/201643.86031/01/201727/05/201743.54029/06/201743.54030.110CompletedPhysically completedIVth & Part bill (Rs.8.73 laksh) Recived
169 BDR1652230962016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPREDCEOOct 24 2017 12:00AMProviding CC Road From Hanuman Temple to Gram Panchyat at Village Ujlamb Tq : Basavakalyan 350 Mtr. Construction of CC Road From Hanuman Temple to Sri.Kishor at Ujlamb Basavakalyan Taluka10.0019/03/201810.00012/02/201810.00016/02/201817/03/20188.32019/05/20188.3200.000CompletedPhysically CompletedChange of work approved from hkrdb on 24.10.2017
170 BDR1652232362016-17MICROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesOthersOthersPWDDCJan 1 1900 12:00AMProviding LED Dual carriage pole with two lights in the middle of the road Ambedkar circle to bus stand road in BasvakalyanProviding LED Dual carriage pole with two lights in the middle of the road Ambedkar circle to bus stand road in Basvakalyan90.0017/01/201790.00010/03/201790.00030/03/201720/06/201783.25030/06/201773.03037.550Completedcompleted  
171 BDR1611230032016-17MACROBidarAuradOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPMGSYCEOFeb 3 2017 12:00AM Construction of road 4km to 5km from Donagaon to Murki village in Aurad Taluka131.1720/12/2017159.46027/12/2017159.46005/01/201824/02/2018156.68019/03/2018144.08092.020Completedphysically completed 
172 BDR161123272016-17CMDQBidarAuradOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEOApr 24 2017 12:00AM Construction of CC Road & Drain from Chandrakanth Kadam hosue to Ankush Biradar house at Holesamundra village10.0013/12/201710.00001/01/201810.00002/01/201805/02/20188.77003/07/20188.7707.000CompletedPhysically Completed 
173 BDR1614230612016-17GDQBidarAuradOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEODec 14 2016 12:00AM Construction of CC Road in Ram Nagar at Aurad (B) town10.0003/09/20178.94003/04/20178.940 12/05/20178.84005/12/20178.8407.250CompletedCompleted 
174 BDR1614230632016-17GDQBidarAuradOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersKRIDLCEODec 14 2016 12:00AM ಬೀದರ್ ಜಿಲ್ಲೆ ಔರಾದ್ ತಾಲ್ಲೂಕಿನ ಕಮಲಾನಗರ ಜಿಲ್ಲಾ ಪಂಚಾಯತಿ ವ್ಯಾಪ್ತಿಯ ಹುಲಸೂರು ಗ್ರಾಮದ ಪ್ರಾಥಮಿಕ ಶಾಲೆಗೆ ಕಾಂಪೌಂಡ್ ನಿರ್ಮಾಣ ಕಾಮಗಾರಿ10.0024/02/201810.00003/09/201810.000  0.00024/02/201810.0009.900CompletedCompletedGeneral
175 BDR1621220762016-17MACROBidarBhalkiOthersTSP InfrastructureRoads & BridgesRural RoadsOthersPREDCEOMar 11 2017 12:00AM ಭಾಲ್ಕಿ ತಾಲ್ಲೂಕಿನ ನಾಗರಾಳ ಗ್ರಾಮವನ್ನು ಗ್ರಾಮ ವಿಕಾಸ ಯೋಜನೆ ಮಾದರಿ ಅನ್ವಯ ಆಂತರಿಕ ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ.50.0028/12/201750.00021/12/201650.00002/02/201805/03/201844.85015/03/201844.85041.670CompletedPhysically Completed 
176 BDR1621230122016-17MACROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDDCMay 11 2016 12:00AM Widening and strengthening of Aurad-Sadashivgadh(SH-34) road km 53.30 to 56.00 in Bhalki taluka296.3019/01/2017296.30023/03/20170.00022/08/201703/11/2017292.65012/11/2017292.650277.240Completedcompleted 
177 BDR1621230142016-17MACROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDDCOct 28 2016 12:00AM Formation of road from Dongapur village to Bhalki main road length-3.97 km in Bhalki taluka191.6011/08/2016191.60012/09/2016191.600 20/03/2017189.00024/03/2017189.000186.610CompletedCompleted 
178 BDR1621230152016-17MACROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDDCOct 26 2016 12:00AM Formation of road from Biri (k) to Kotkyal village 3.48 Km in Bhalki taluka198.5011/07/2016198.50012/09/2016198.50012/12/201631/03/2017195.84005/06/2017195.840174.950Completedcompleted 
179 BDR1621230162016-17MACROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDDCSep 2 2017 12:00AM Construction of road from Jaigaon village to Telgaon Cross in Bhalki Tq. Of Bidar Dist.179.0803/08/2017179.08006/05/2017179.09001/01/201727/10/2017176.68015/11/2017176.680146.910Completed completed 
180 BDR1621230172016-17MACROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDDCSep 2 2017 12:00AM Formation of road from Gorchincholi to Koroor (H) in Bhalki Tq. Of Bidar Dist.69.9020/04/201769.90006/05/201769.90001/01/201701/11/201769.16015/11/201769.16066.860Completedcompleted 
181 BDR1621230192016-17MACROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDDCJun 1 2017 12:00AM Construction of four lane road in village limit of Mehkar on Kesarjawlga Alwai road from km 11.20 to 11.690 in Bhalki Taluka Dist. Bidar94.4301/06/201794.43023/03/201794.43030/03/201713/09/201794.43010/10/201798.77093.750Completedcompleted  
182 BDR1621230732016-17MACROBidarBhalkiOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPWDDCMar 11 2017 12:00AM Re construction of bridge on Bhalki Chincholi SH-75 (km 7.10)105.0012/12/201796.00029/12/201796.00001/01/201823/03/201894.86026/03/201898.86067.090Completed completed letter sent to ee pwd frm hkrdb regarding tender premium on 27/2/2018
183 BDR1624230642016-17GDQBidarBhalkiOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEODec 14 2016 12:00AM Construction of CC Road at Warwatti (B) village in Bhalki Tq10.0002/10/20179.70021/02/20169.700 12/05/20178.480 8.4808.420CompletedCompleted 
184 BDR1631230082016-17MACROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEODec 20 2016 12:00AM Improvement of road from Hallikhed (B) to Markhal village of Length 5.440 km in Humnabad Tq.216.1018/01/2017184.30020/04/2017184.300 08/11/2017160.40011/08/2017160.400135.480CompletedPhysically Completed 
185 BDR1631230092016-17MACROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEODec 29 2016 12:00AM Improvement of road from Kabirabad Wadi to Namadapur village in Humnabad Tq.193.5202/03/2017193.52020/04/2017193.520 28/09/2017190.00028/09/2017190.000189.950CompletedCompleted 
186 BDR1631230102016-17MACROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEOOct 21 2015 12:00AM Formation of Road From Walkhandi Village to Gandi patwada of length 3.364 km Humnabad Taluka137.3012/05/2016134.50023/01/2017134.500 31/10/2017129.91031/10/2017129.910116.920CompletedPhysically Completed 
187 BDR1631230112016-17MACROBidarHumnabadOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEOMay 11 2016 12:00AM Improvement of Approach Road to Botagi Village of Length 1.430km in Humnabad Taluka, Bidar Dist.76.0014/12/201676.00023/01/201776.000 13/06/201766.92013/06/201766.92066.550CompletedCompleted 
188 BDR1641130232016-17MACROBidarBidarOthersGeneralInfrastructureWater SupplyRural Water SupplyOthersCMCDCJan 13 2017 12:00AM RO plant at basavagiri in Bidar 12.0028/09/201712.00005/10/201712.00003/03/201813/03/201812.00020/03/201810.90010.620CompletedWork CompletedWork Completed
189 BDR1641130382016-17MACROBidarBidarOthersGeneralInstitutionalSocialOthersOthersKRIDLCEOOct 19 2016 12:00AM  M.Y Ghorpade G. P Building Gudpalli50.0026/02/201856.88028/02/201856.880  0.00028/02/201856.88056.310CompletedCompletedಮಂಡಳಿಯ ಆದೇಶ ಸಂಖ್ಯೆ: 2924, ದಿ: 30/12/2017ರನ್ವಯ, ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನವನ್ನು NK ಯಿಂದ KRIDL ಗೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
190 BDR1641230072016-17MACROBidarBidarOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEOMay 11 2016 12:00AM Construction of Road and Drains of Chidari Village survey No. 12 Shrishidaramaya layout of BUDA in Bidar Taluka289.1004/07/2017289.10011/01/2017289.10003/03/201718/01/2018316.16002/05/2018316.160286.830CompletedPhysically Completed 
191 BDR1641230422016-17MACROBidarBidarOthersGeneralInfrastructureUrban InfrastructureTransportOthersPWDDCOct 7 2017 12:00AM Const of Bus Shelter at Vidynagar in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4404.610CompletedCompleted 
192 BDR1641230432016-17MACROBidarBidarOthersGeneralInstitutionalOthersOthersOthersPWDDCOct 7 2017 12:00AM Const of Bus Shelter at Gumpa ring road in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4504.610CompletedCompleted 
193 BDR1641230462016-17MACROBidarBidarOthersGeneralInstitutionalOthersOthersOthersPWDDCOct 7 2017 12:00AM Const of Bus Shelter at Mailooor ring road in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4504.610CompletedCompleted 
194 BDR1641230472016-17MACROBidarBidarOthersGeneralInstitutionalOthersOthersOthersPWDDCOct 7 2017 12:00AM Const of Bus Shelter at RTO office in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4504.610CompletedCompleted 
195 BDR1641230482016-17MACROBidarBidarOthersGeneralInstitutionalOthersOthersOthersPWDDCOct 7 2017 12:00AM Const of Bus Shelter at KEB office in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4504.610CompletedCompleted 
196 BDR1641230492016-17MACROBidarBidarOthersGeneralInstitutionalOthersOthersOthersPWDDCOct 7 2017 12:00AM Const of Bus Shelter at Narsimha Zarna in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50027/01/201822/03/20186.45023/03/20186.4504.610CompletedCompleted 
197 BDR1641230522016-17MACROBidarBidarOthersGeneralInstitutionalOthersOthersOthersPWDDCOct 7 2017 12:00AM Const of Bus Shelter at Gandhi gunj in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50028/01/201822/03/20186.45023/03/20186.4504.610CompletedCompleted 
198 BDR1641230542016-17MACROBidarBidarOthersGeneralInstitutionalOthersOthersOthersPWDDCOct 7 2017 12:00AM Const of Bus Shelter at Mailoor cross in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50015/11/201715/12/20176.45001/01/20186.0004.390Completedcompleted 
199 BDR1641230552016-17MACROBidarBidarOthersGeneralInstitutionalOthersOthersOthersPWDDCOct 7 2017 12:00AM Const of Bus Shelter at Shahapur gate in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50015/11/201715/12/20176.45001/01/20185.0503.630CompletedCompleted 
200 BDR1641230562016-17MACROBidarBidarOthersGeneralInstitutionalOthersOthersOthersPWDDCOct 7 2017 12:00AM Const of Bus Shelter at Basaveshwar circle in Bidar Taluka & Bidar Dist6.5029/08/20176.50009/11/20176.50015/11/201715/12/20176.45001/01/20186.0004.340CompletedCompleted 
201 BDR1641233282016-17CMDQBidarBidarOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEOApr 24 2017 12:00AM Construction of CC Road & Drain from Sanjeev Marpalli hosue to Narsappa hosue at Baroor village19.0013/12/201710.00028/12/201710.00002/02/201805/02/20188.33028/02/20188.3307.910CompletedPhysically Completed 
202 BDR1641233292016-17CMDQBidarBidarOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEOJan 1 1900 12:00AM Providing B.T. Road from KEB to Shah Abdul Razaq Dargah at Kamthana village10.0013/12/201710.00028/12/201710.00002/02/201831/01/20188.76002/05/20188.7608.600CompletedCompleted 
203 BDR1644230592016-17GDQBidarBidarOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEODec 14 2016 12:00AM Construction of CC Road from Zakir Hotel to Rajkumar house at Sindol village10.0009/03/20179.43014/03/20179.430 12/05/20178.14005/12/20178.1407.740CompletedCompleted 
204 BDR1644230602016-17GDQBidarBidarOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEOApr 26 2017 12:00AM ಬೀದರ ಜಿಲ್ಲೆ ಔರಾದ ತಾಳೂಕಿನ ಕಮಲಾನಗರ ಜಿಲ್ಲಾ ಪಂಚಯತ ವ್ಯಾಪ್ತಿಯ ಕಾಳಗಾಪೂರ ನೀವೃತ್ತಿ ಮನೆಯಿಂದ ಎಸ್. ಸಿ ವಾರ್ಡ ವರೆಗೆ ಸಿ.ಸಿ ರಸ್ತ ನಿರ್ಮಾಣ10.0027/12/201710.00001/10/20180.00023/01/201816/02/20188.48026/03/20188.4800.000CompletedPhysically Completed 
205 BDR1644230622016-17GDQBidarBidarOthersSCP InfrastructureRoads & BridgesRural RoadsOthersPREDCEODec 14 2016 12:00AM Construction of Road from Laskar Naik Tanda to Keshev Naik tanda Approach road at Laskar Naik tanda 10.0003/09/201710.00014/03/201710.000 20/05/20177.57020/05/20177.5706.050CompletedPhysically Completed 
206 BDR1651130202016-17MACROBidarBasvakalyanOthersGeneralInfrastructureWater SupplyRural Water SupplyOthersRWSCEOMay 1 2017 12:00AM ಕೋಹಿನೂರು ವಾಡಿ ಮನೆಗಳಿಗೆ ಕುಡಿಯುವ ನೀರು ಸರಬರಾಜು ಮಾಡಲು ಓ.ಹೆಚ್.ಟಿ ಯಿಂದ ರಾಮಚಂದ್ರ ಕಂಟೆನೂರೆ ಮನೆ ಮತ್ತು ಓ.ಹೆಚ್.ಟಿ ಯಿಂದ ಹನುಮಾನ ಮಂದಿರ ಹಾಗೂ ಓ.ಹೆಚ್.ಟಿಯಿಂದ ಶಂಕರ ಪೂಜಾರಿ ಮನೆಯವರೆಗೆ ಜಿ.ಐ ಪೈಪಲೈನ ನಿಮರ್ಾಣ.14.0001/05/201714.00025/01/201714.00026/10/201722/12/201711.84001/10/201811.8408.200CompletedPhysically completed 
207 BDR1651230042016-17MACROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEOMar 17 2017 12:00AM Construction of CC Road and CC Drain, PVC Pipe line & Chamber from Kohinoor Swarajnagar School to Sub Register Office & From Main road to PHC Guest House Basavakalyan Taluka22.9028/12/201722.90028/02/20180.00007/07/201823/04/201818.85019/05/201818.85013.480CompletedPhysically COmpleted 
208 BDR1651230052016-17MACROBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEOSep 2 2017 12:00AM Construction of PVC Pipe Drain, Chamber CC road in Kohinoor Pahad34.3020/03/201734.30019/04/201734.300 30/10/201728.73030/10/201728.73028.730CompletedCompleted 
209 BDR16512312016-17CMDQBidarBasvakalyanOthersGeneralInfrastructureRoads & BridgesRural RoadsOthersPREDCEOApr 24 2017 12:00AM Construction of Road from Ramthirth (K) village to Korhalli Maharashtra Border via Ramlingheshwar temple at Ramthirth (K) village10.0013/12/201710.00023/12/20170.00002/02/201805/02/20188.51017/03/20188.5108.500CompletedCompleted 
210 BDR1658130822016-17DGSNDBidarBasvakalyanOthersGeneralInstitutionalOthersULB AmenitiesOthersHKRDBHKRDBMar 30 2017 12:00AM 1.8 CUM ACE HOPPER TIPPER BS 414.8530/03/201714.850 0.000  0.00030/03/201714.85014.100Completed 100% Payment made
                 8415.31 8425.180 8070.640  7755.690 8119.4707179.900