LIST OF Completed MACRO WORKS

  Workcode Taluka Type Subtype Category Work Name Agency Plan Approved Date Allocation ADM Approved Date ADM Amount Work Order Amt Exp Stages of Work Status Not Started Under Progress Completed Feedback
1 KLB157123321KalaburagiInfrastructureWater SupplyGENERALProviding Pipeline from Khajakotnoor village (MI Tank) to Srinivas Saradagi villageRWS03/05/2016 21.50 03/05/201621.5021.2816.52CompletedCompleted
2 KLB15R312010ChincholiInfrastructureRoads & BridgesGeneralWiderning to road from Sedam-Chincholli road (Part of Wanmarpalli - Raichur, Road, SH-15) from KM 119.00 to 120.00 at sulepeth village limit in ChincholliPWD-Sedam05/04/2016 184.32 26/04/2017184.32166.95140.42Work Completed. Final Report and Bill to be submitted for payment Completed
3 KLB15R312011ChincholiInfrastructureLightingGeneralSub estimate widerning Wanmarpalli - Raichur (SH-15) from KM 119.00 to 120.00 at sulepeth village limit in Chincholli Tq at Kalaburagi Dist. (Providing and fixing M.H. Fitting Street Light Pole)PWD-Sedam27/06/2017 29.51 01/09/201729.5129.510.00work completed, Completed
4 KLB15R411094ChittapurInstitutionalLibraryGeneralConstruction of Library building at Kalgi village in Chittapur TalukaKRIDL-218/01/2016 20.00 17/09/201617.100.0016.85Completed. Completed
5 KLB15R412012ChittapurInfrastructureRoads & BridgesGeneralConstn. of pipe culverts on AP border putpak to Bhosga road (SH-126) (Km 59.00, 59.50 and 59.60) in Chittapur talukaPWD-Sedam21/06/2016 46.36 21/06/201646.3636.2335.89Work CompletedCompleted
6 KLB15R412013ChittapurInfrastructureRoads & BridgesGeneralConst n of main road from Chittapur to Madbool village in chittapur talukaPWD-Sedam19/02/2016 190.56 19/02/2016190.5616.28160.15CompletedCompleted
7 KLB15R412014ChittapurInfrastructureRoads & BridgesGeneralConst'n of road from Bhagodi to Madbool cross in chittapur talukaPWD-Sedam19/02/2016 190.56 19/02/2016190.5616.28150.24Completed (Repeated work as per meeting review of 10-04-2017)Completed
8 KLB15R412015ChittapurInfrastructureRoads & BridgesGeneralConstruction of CD works on Madbol to Bhagodi (MDR) road in Chittapur Tq. (Sub Estimate)PWD-Sedam02/03/2017 29.63 02/03/201729.630.0029.63Work completedCompleted
9 KLB15R412016ChittapurInfrastructureRoads & BridgesGeneralImpt to approach to Bhagodi bridge cum barrage in ChittapurPWD-Sedam03/10/2016 80.00 11/03/201680.0074.3974.39Work CompletedCompleted
10 KLB15R412019ChittapurInfrastructureRoads & BridgesGeneralImprovements of approach road from Arankal Bugadi Tanda in Chittapur Taluka to Jammankolla - Mallimolla Tanda in Chincholi TalukaPWD-Sedam18/01/2016 50.00 17/05/201650.0046.6843.99Work CompletedCompleted
11 KLB15R412028ChittapurInfrastructureRoads & BridgesGeneralDevelopment of Gundgurthi Village in Kalaburagi dist -Part-3PRED10/02/2016 78.00 12/05/201678.0077.8651.88Phy CompletedCompleted
12 KLB15R412029ChittapurInfrastructureRoads & BridgesGeneralDevelopment of Gundgurthi Village in Kalaburagi dist -Part-4PRED10/02/2016 71.34 12/05/201671.3471.220.00Phy CompletedCompleted
13 KLB15R412030ChittapurInfrastructureRoads & BridgesGeneralDevelopment of Gundgurthi Village in Kalaburagi dist PART -1PRED10/02/2016 89.10 12/05/201689.1088.9688.96CompletedCompleted
14 KLB15R412031ChittapurInfrastructureRoads & BridgesGeneralDevelopment of Gundgurthi Village in Kalaburagi dist PART -2PRED10/02/2016 80.40 12/05/201680.4080.2566.19Phy CompletedCompleted
15 KLB15R412109ChittapurInfrastructureRoads & BridgesGeneralConstruction of C.C. Road from Railway station to Basanna Soukar Nalwar shop in Ward No. 01 at Chittapur TownKRIDL-110/05/2016 10.00 16/12/201610.000.009.90CompletedCompleted
16 KLB15R412111ChittapurInfrastructureRoads & BridgesGeneralConstruction of C.C. Road from Nagavi Chowk to Ravi Sajjan Shetty House in Ward No. 03 at Chittapur Town.KRIDL-110/05/2016 10.00 16/02/201610.000.009.90CompletedCompleted
17 KLB15R412112ChittapurInfrastructureRoads & BridgesGeneralProviding C.C. Road & RCC Drain from Jagu Guttedar House to Nagavi Chowk at Ward No. 4 in Chittapur TownKRIDL-110/05/2016 10.00 30/08/201610.000.009.90CompletedCompleted
18 KLB15R412113ChittapurInfrastructureRoads & BridgesGeneralProviding C.C. Road & RCC Drain from Bhairi house to Kadu Papa house via Hanamanth Chowdhari house at Ward No. 5 in Chittapur TownKRIDL-110/05/2016 10.00 30/08/201610.000.009.80CompletedCompleted
19 KLB15R412114ChittapurInfrastructureRoads & BridgesGeneralProviding C.C. Road from Devibai house to Kemu house at Ward No. 6 in Chittapur TownKRIDL-110/05/2016 10.00 30/08/201610.000.009.80CompletedCompleted
20 KLB15R412116ChittapurInfrastructureRoads & BridgesGeneralProviding RCC Drain from Subhash Rathod house to Diggaon Road at Ward No. 8 in Chittapur Town.KRIDL-110/05/2016 10.00 30/08/201610.000.0010.00Work CompletedCompleted
21 KLB15R412118ChittapurInfrastructureRoads & BridgesGeneralProviding C.C. Road from Nagavi main road to Sulegaon Layout at Ward No. 10 in Chittapur TownKRIDL-110/05/2016 10.00 30/08/201610.000.009.90CompletedCompleted
22 KLB15R412119ChittapurInfrastructureRoads & BridgesGeneralConstruction of C.C. Road from Yakub Fruite house to Ek Kaman in Ward No. 11 at Chittapur Town.KRIDL-110/05/2016 10.00 16/12/201610.000.009.90CompletedCompleted
23 KLB15R412120ChittapurInfrastructureRoads & BridgesGeneralConstruction of CC road and RCC drain from Munna House to Police Station in Ward No. 12 at Chittapur Taluka. Dist. KalaburagiKRIDL-110/05/2016 10.00 27/04/201710.000.009.90CompletedCompleted
24 KLB15R412121ChittapurInfrastructureRoads & BridgesGeneralConstructin of CC Road and RCC Drain from Yeddapur House to Shivakumar Hadpad Shop Janta to Police Station in Ward No. 13 Chittapur Town. Dist. KalaburagiKRIDL-110/05/2016 10.00 27/04/201710.000.009.90CompletedCompleted
25 KLB15R412122ChittapurInfrastructureRoads & BridgesGeneralProviding C.C. Road & RCC Drain from Makabool Patel house to Gachin Math & Old General Hospital to Ganapati Temple Vai Mainoddin House at Ward No. 14 in Chittapur Town.KRIDL-110/05/2016 10.00 30/08/201610.000.009.90CompletedCompleted
26 KLB15R412123ChittapurInfrastructureRoads & BridgesGeneralProviding C.C. Road & RCC Drain from Sultan Sab layout Survay No. 273 at Ward No. 15 in Chittapur Town.KRIDL-110/05/2016 10.00 30/08/201610.000.009.90CompletedCompleted
27 KLB15R412124ChittapurInfrastructureRoads & BridgesGeneralProviding C.C. Road & RCC Drain from Prakash Samgar house to Katre Wel at Ward No. 16 in Chittapur Town.KRIDL-110/05/2016 10.00 30/08/201610.000.009.90CompletedCompleted
28 KLB15R412125ChittapurInfrastructureRoads & BridgesGeneralConstruction of C.C. Road from Basavaraj Honnal house to Sudhakar Dengi house in Ward No. 17 at Chittapur Town.KRIDL-110/05/2016 10.00 16/12/201610.000.009.80CompletedCompleted
29 KLB15R412126ChittapurInfrastructureRoads & BridgesGeneralConstruction of C.C. Road from Elehadis Masjid to Chitavali chowk in Ward No. 18 at Chittapur TownKRIDL-110/05/2016 10.00 16/12/201610.000.009.80CompletedCompleted
30 KLB15R412127ChittapurInfrastructureRoads & BridgesGeneralProviding C.C. Road from Bevoor Sahukar house to Old Basaveshwar Chowk at Ward No. 19 in Chittapur TownKRIDL-110/05/2016 10.00 30/08/201610.000.009.90CompletedCompleted
31 KLB15R412128ChittapurInfrastructureRoads & BridgesGeneralConstruction of C.C. Road from Chittavali Chowk to Reshmi Madeppa house in Ward No. 20 at Chittapur TownKRIDL-110/05/2016 10.00 16/12/201610.000.0010.00CompletedCompleted
32 KLB15R412129ChittapurInfrastructureRoads & BridgesGeneralProviding C.C. Road from Old Basaveshwar Chowk to Jyoti Sevakendra at Ward No. 21 in Chitapur TownKRIDL-110/05/2016 10.00 30/08/201610.000.0010.00CompletedCompleted
33 KLB15R412130ChittapurInfrastructureRoads & BridgesGeneralProviding C.C. Road from Church to Old Basaveshwar Chowk & Chitawali Chowk to Basaveshwar Statue at Ward No. 22 in Chittapur TownKRIDL-110/05/2016 10.00 30/08/201610.000.009.90CompletedCompleted
34 KLB15R412131ChittapurInfrastructureRoads & BridgesGeneralProviding C.C. Road from Linga Hotel to Sitaram Chali at Ward No. 23 in Chitapur TownKRIDL-110/05/2016 10.00 30/08/201610.000.009.90CompletedCompleted
35 KLB15R512032JewargiInfrastructureRoads & BridgesGeneralConstn. of CC Road In Andola village of Jewargi PRED22/06/2016 100.00 05/12/201672.0063.8457.79Phy Completed Completed
36 KLB15R512033JewargiInfrastructureRoads & BridgesGeneralConstn. of CC Road In Ijeri village of Jewargi PRED22/06/2016 100.00 05/12/201679.0063.1961.51 Completed. Completed
37 KLB15R512108JewargiInfrastructureRoads & BridgesGeneralImprovement of road from Mahur New village to Mahur old village Km.12.45 to 13.55 in Jewargi talukaKRIDL-122/02/2015 55.00 30/03/201655.000.0055.00CompletedCompleted
38 KLB15R611097SedamInstitutionalCollege GeneralConstruction of PU College at SedamKRIDL-227/02/2016 165.71 27/02/2016165.710.00165.71Completed. Completed
39 KLB15R612018SedamInfrastructureRoads & BridgesGeneralConstruction of Ranjol to Bhootpur Village road from Km 0.00 to 2.10 in Sedam Tq.PWD-Sedam16/01/2016 106.00 25/06/2016103.2998.4197.92work Completed Received 3rd party report & final Payment done Completed
40 KLB15R612101SedamInfrastructureUrban InfrastructureGeneralಸೇಡಂ ಪಟ್ಟಣದ ವಾರ್ಡ ನಂ. 22 ರಲ್ಲಿ ಜಿ.ಕೆ ರಸ್ತೆಯ ಭವಾನಿ ಕಾಂಪ್ಲೆಕ್ಸ್ ದಿಂದ ಕೊಡ್ಲಾ ಕ್ರಾಸ್ ಲೇಬರ್ ಕಾಲೋನಿವರೆಗೆ ಮತ್ತು ಪಕ್ಕದ ಬಡಾವಣೆಗಳಿಗೆ ಎಚ್.ಡಿ.ಪಿ.ಇ. ಪೈಪ್ ಲೈನ್ ಕಾಮಗಾರಿ.TMC-Sedam06/02/2018 30.00 14/11/201730.0029.550.00Physically CompletedCompleted
41 KLB15R711035KalaburagiInstitutionalParkGeneralDevelopment of Landscape work at Pragati colony garden in KalaburagiNK 06/07/2016 24.87 06/07/201624.870.0022.96Work completedCompleted
42 KLB15R711043KalaburagiInstitutionalSportsGeneralConstr of Canteen building at C.P Stadium in KalaburagiNK02/04/2016 5.06 02/04/20165.065.064.12work completedCompleted
43 KLB15R711046KalaburagiInstitutionalSportsGeneralRepairs and renovation of Medical hall and Sports room C.P Stadium in KlbNK02/04/2016 5.02 02/04/20165.025.024.06work completedCompleted
44 KLB15R711048KalaburagiInstitutionalSportsGeneralRepairs of toilet and curtains mats to Swimming pool C.P Stadium in KlbNK02/04/2016 1.93 02/04/20161.931.931.56work completedCompleted
45 KLB15R711239KalaburagiInstitutionalSocialGeneral50 ಎಕರೆ ಪ್ರದೇಶದಲ್ಲಿ ಮೇವು ಬೆಳೆಯಲು ಪ್ರತಿ ಎಕರೆಗೆ ರೂ.10000/- ದಂತೆCEO31/03/2016 5.00 31/03/20165.000.002.00work approved and 40% fund releasedCompleted
46 KLB15R712020KalaburagiInfrastructureRoads & BridgesGeneralCC Road & Drain form Kajal House to Mijgori, Sai Pahelwan house to Aadi Batli house & infront of Usmania Maslim Chowk, Mominpura, Kaalburgi.PWD KLB20/05/2016 104.68 20/05/2016104.68103.5797.18Physically completed Completed
47 KLB15R712021KalaburagiInfrastructureRoads & BridgesGeneralCC Road Form Ahmed Manzil to Batle Alawa via Yakubji Maniar, Alla Bakash House, Salar jung and Ayub Gul Farosh @ Mominpura, Batle Alawa.PWD KLB20/05/2016 102.68 20/05/2016102.68101.6284.01work CompletedCompleted
48 KLB15R712022KalaburagiInfrastructureRoads & BridgesGeneralCC Road Form balti Alawa to National Chowk via Mouzan house, Naseer Syed Bare, Naseer Ayub & Sons & Rasheed Lunge house, Kalburgi.PWD KLB20/05/2016 102.16 20/05/2016102.16101.0696.55Work CompletedCompleted
49 KLB15R712023KalaburagiInfrastructureRoads & BridgesGeneralCC Road & Drain form Mirza Gayaz baig house, late Dr.Viqarulla hussaini, Rahmat Colony, Azizulla Sarmast and New Mount Carmel School @ W.NO.13, Azadpur Road & Firdose Nagar Colony, Kalburgi.PWD KLB20/05/2016 99.00 20/05/201699.0097.9297.76Physically completedCompleted
50 KLB15R712034KalaburagiInfrastructureRoads & BridgesGeneralImpts. of connectivity road from Bhunyar [K] village via Sonth road to Kalaburagi talukaPMGSY29/02/2016 191.40 29/02/2016191.40161.17116.68COMPLETEDCompleted
51 KLB15R712040KalaburagiInfrastructureUrban InfrastructureGeneralProviding 12.5mtr high mast lights 4 nos at ward no 20 in KalaburagiNK08/03/2016 11.53 10/05/201611.530.0011.08Work completedCompleted
52 KLB15R712055KalaburagiInfrastructureRoads & BridgesGeneral Construction Of Bus Shelter Opposite Samagraha Abhi Virudhi Bank Towards Hirapur Road Aland Check Post ,KalburgiNK03/06/2016 3.98 27/05/20163.980.003.91Work completed, roof sheet balanceCompleted
53 KLB15R712060KalaburagiInfrastructureRoads & BridgesGeneral Construction of Bus Shelter Opposite Pujari Complex Towards Humnabad road Ram Mandir, KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.91Work completedCompleted
54 KLB15R712063KalaburagiInfrastructureRoads & BridgesGeneral Construction of Bus Shelter Opposite Nirmala Nivas Towards Central Bus Station Road Near Kanni Market.,KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.91Work completedCompleted
55 KLB15R712064KalaburagiInfrastructureRoads & BridgesGeneral Construction of Bus Shelter Beside Ring Road Towards Central Bus Station Road Near Filter Bed Ahmed Nagar Colony ,KalaburgiNK03/06/2016 3.98 27/05/20163.980.003.91Work completedCompleted
56 KLB15R712067KalaburagiInfrastructureRoads & BridgesGeneral Construction of Bus Shelter Opposite Hussaini Icon Centre Towards Central Bus Station Road Misbah Nagar Chowk ,KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.91Work completedCompleted
57 KLB15R712068KalaburagiInfrastructureRoads & BridgesGeneral Construction of Bus Shelter Opposite Al-llahi Tours & Travels Towards Humnabad Road KCT Engg.College,KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.91Work completedCompleted
58 KLB15R712070KalaburagiInfrastructureRoads & BridgesGeneral Construction of Bus Shelter Beside Old Bus Stand New Madina Colony ,KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.91Work completed.Completed
59 KLB15R712071KalaburagiInfrastructureRoads & BridgesGeneral Consturction of Bus Shelter Beside Government Printing Press, KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.91Work completedCompleted
60 KLB15R712072KalaburagiInfrastructureRoads & BridgesGeneral Consturction of Bus Shelter Beside Of Hanuman Temple Open Space Towards High Court Road at Biddapur Colony,KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.91Work completedCompleted
61 KLB15R712073KalaburagiInfrastructureRoads & BridgesGeneral Construction of Bus Shelter Opposite Nagaraj Complex Towards Humnabad At Kakade Chowk,KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.92Work completedCompleted
62 KLB15R712075KalaburagiInfrastructureRoads & BridgesGeneral Construction of Bus Shelter Towards High Court Road Opposite Udanur Cross,KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.92Work completed Completed
63 KLB15R712076KalaburagiInfrastructureRoads & BridgesGeneral Consturction of Bus Shelter Opposite Shruthi Medical Store Towards Super Market Road Pooja Colony Cross, KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.92Work completedCompleted
64 KLB15R712079KalaburagiInfrastructureRoads & BridgesGeneral Construction of Bus Shelter Opposite Sun International Hotel Towards Central Bus Station,KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.92Work completed Completed
65 KLB15R712080KalaburagiInfrastructureRoads & BridgesGeneral Construction of Bus Shelter at Rukmoddin tola darga towards Aland road KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.92Work completedCompleted
66 KLB15R712086KalaburagiInfrastructureRoads & BridgesGeneral Construction of Bus Shelter Beside Siddarood Math Towards Ram Mandir Road Siddarood Colony,KalaburagiNK03/06/2016 3.98 27/05/20163.980.003.91Work completed Completed
67 KLB15R712087KalaburagiInfrastructureRoads & BridgesGeneralProviding and laying of 90mm dia HDPE Pipeline from Azadpur Cross Ring road to Piece Islamic School Azadpur road and Hagarga Cross Ring road to Itihad Chowk in KalaburagiKUWSDB01/07/2016 23.33 01/07/201623.3319.0022.71CompletedCompleted
68 KLB15R712104KalaburagiInfrastructureRoads & BridgesGeneralConstn of CC road from KWS zonal office to SB College compound wall (balance work) in Kalabuargi townKRIDL-108/02/2016 10.00 08/02/201610.000.0010.00CompletedCompleted
69 KLB15R712132KalaburagiInfrastructureRoads & BridgesGeneralProviding and laying of CC road at ward no 55 of SB office to NGO office in Kalabaragi (From 0.00 CH-171.00MCH) KRIDL-107/03/2017 5.12 07/03/20175.120.005.00CompletedCompleted
70 KLB15R712133KalaburagiInfrastructureRoads & BridgesGeneralProviding and laying of CC road at ward no 55 of Dr. Mahinnala house to Railway line in Kalaburagi (From 0.00 CH-212.00MCH)KRIDL-107/03/2017 5.30 07/03/20175.300.005.10CompletedCompleted
71 KLB15R712134KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Ring road to Kanni market via Mohammadi chowk in Kalaburagi city.CMC25/01/2016 84.90 03/02/201692.4292.4292.42CompletedCompleted
72 KLB15R712135KalaburagiInfrastructureRoads & BridgesGeneralconst of Drain from ring road to Kanni Market via Mohammadi Chowk in Kalaburagi City.CMC25/01/2016 45.10 02/02/201645.1944.6342.39CompletedCompleted
73 KLB15R712136KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Mohammadi chowk to Dattatraya Herror School via Raliance Funcation hall and Behind Venkateshwar temple in New Raghavendra Colony W.No.21 Kalaburagi city.CMC25/01/2016 65.25 02/02/201665.3258.3556.67CompletedCompleted
74 KLB15R712137KalaburagiInfrastructureRoads & BridgesGeneralCC Road from Sanjayvani Press to S.B. Collage compound & Dr. S.H.Katti House to S.B. Collage compound via Millind School.CMC25/01/2016 35.00 02/02/201634.9332.7329.60CompletedCompleted
75 KLB15R712138KalaburagiInfrastructureRoads & BridgesGeneralImpt of road from New RTO office to Srusti Nilaya plot no 3 (kusnoor road) in Kalaburagi cityCMC19/02/2016 99.00 19/02/201699.5988.00100.02CompletedCompleted
76 KLB15R712139KalaburagiInfrastructureRoads & BridgesGeneralImpts to road from existing KEB TC to University gate (kusnoor road) in Kalaburagi cityCMC19/02/2016 99.95 19/02/201699.9988.5492.98CompletedCompleted
77 KLB15R712143KalaburagiInfrastructureRoads & BridgesGeneralConstruction of road from Santosh Colony Main road to Choudhry ITI College road via 60 ft. Road at Ward No. 22 in Kalaburagi CityCMC26/02/2016 82.00 26/02/201682.0074.9481.63CompletedCompleted
78 KLB15R712144KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Drain from Santosh Colony Main road to Choudhry ITI College road via 60 ft. Road at Ward No. 22 in Kalaburagi CityCMC26/02/2016 46.25 26/02/201646.2538.8036.41CompletedCompleted
79 KLB15R712145KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC Road from Aland road to PF Office and surrounding of Chincholi Layout at Ward No. 22 in Kalaburagi CityCMC26/02/2016 29.25 26/02/201629.2526.1727.80CompletedCompleted
80 KLB15R712147KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road Indian oil Corporation to Gunj Bank Colony, Kalburgi.CMC02/02/2016 35.27 02/02/201635.2729.8130.45CompletedCompleted
81 KLB15R712148KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road from Mahalakshmi Lay out to Raghuji Finance @ Gunj Colony, Kalaburgi.CMC02/02/2016 45.27 02/02/201645.2738.3639.02CompletedCompleted
82 KLB15R712149KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road from Sarwar house to Luqman College & Divine School to Human Age School @ Omrah Colony, Kalaburgi.CMC02/02/2016 29.97 02/02/201629.9726.9526.84CompletedCompleted
83 KLB15R712150KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road from Mahadeva Nagar Arch to Akka Mahadevi temple @ Mahadeva Nagar.CMC02/02/2016 49.90 02/02/201649.9049.5044.22CompletedCompleted
84 KLB15R712151KalaburagiInfrastructureRoads & BridgesGeneralFormation of BT Road in Veerendra palil Layout, Kalaburgi.CMC02/02/2016 20.10 02/02/201620.1019.7919.79CompletedCompleted
85 KLB15R712152KalaburagiInfrastructureRoads & BridgesGeneralFormation of BT Road in Darshanapur, GDA Layout, Kalaburgi.CMC02/02/2016 20.12 02/02/201620.1219.2219.21CompletedCompleted
86 KLB15R712153KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road from Krishna School to Sharanappa House @ Basaveshwara Colony,CMC02/02/2016 20.04 02/02/201620.0419.6219.78CompletedCompleted
87 KLB15R712154KalaburagiInfrastructureRoads & BridgesGeneralFormation of CC Road from Zaheed, Ex Mayor to Masjid Huda @ Rahmath Nagar ColonyCMC02/02/2016 35.28 02/02/201635.2834.4531.49CompletedCompleted
88 KLB15R712155KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road & CC Drain from Basheer Kanchi to join existing Storm Water Drain via Kali Gumbad.CMC02/02/2016 50.22 02/02/201650.2249.8728.17Physically Completed Completed
89 KLB15R712156KalaburagiInfrastructureRoads & BridgesGeneralCC Road from KBN Medical College Gate to Dr. Shakeel Khan Clinic, Madina Colony.CMC02/02/2016 25.10 02/02/201625.1024.3423.67CompletedCompleted
90 KLB15R712157KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road & CC Drain from Masjide Sabira to Malagathi Main Road and in front of Nayeem Khan’s HouseCMC02/02/2016 50.34 02/02/201650.3447.6550.00CompletedCompleted
91 KLB15R712158KalaburagiInfrastructureRoads & BridgesGeneralCC Drain from Maharaja Hotel to Dr. Dhaded Hospital via Late Kaiser Mahmood Maniyar’s House, Station Bazaar, KalaburagiCMC02/02/2016 24.83 02/02/201624.8324.8020.11CompletedCompleted
92 KLB15R712159KalaburagiInfrastructureRoads & BridgesGeneralCC Drain from KCT Gate Boundry to Rudra Bhoomi in Madina ColonyCMC02/02/2016 20.04 02/02/201620.0419.2619.27CompletedCompleted
93 KLB15R712160KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road from Dr. Vipul Shah House to Arihanth NagarCMC02/02/2016 25.03 02/02/201625.0324.5724.65CompletedCompleted
94 KLB15R712161KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road @ Mahatma Gandhi Truck Terminal Colony, KalaburagiCMC02/02/2016 40.10 02/02/201640.1037.6737.59CompletedCompleted
95 KLB15R712162KalaburagiInfrastructureRoads & BridgesGeneralCC Road from Baig’s House to Shabdi’s House @ Qamar Colony, KalaburagiCMC02/02/2016 15.11 02/02/201615.1114.7514.78CompletedCompleted
96 KLB15R712164KalaburagiInfrastructureRoads & BridgesGeneralFormation of Road & CC Drain from Hagarga Road to Mazahar Uloom School, KalaburagiCMC02/02/2016 45.23 02/02/201645.2337.4136.62CompletedCompleted
97 KLB15R712165KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Storm Water Drain from Nisti Hospital to existing Storm Water Drain beside Hanuman Temple via N.V.English Medium School at Sharna nagar.CMC01/02/2016 34.50 20/02/201634.5031.0934.30CompletedCompleted
98 KLB15R712166KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from T.T.Bhimrao house to MG Road via Gumbaz and Hasmi house at Pragati colony.CMC01/02/2016 50.00 20/02/201650.0045.6840.48CompletedCompleted
99 KLB15R712167KalaburagiInfrastructureRoads & BridgesGeneralConstruction of storm water Drain Gulla Bowdi Ex-Corpotator Mohan house to existing storm water drain at Kalyan Nagar.CMC01/02/2016 25.00 20/02/201624.8423.3317.69CompletedCompleted
100 KLB15R712168KalaburagiInfrastructureRoads & BridgesGeneralWiding of CC road infront of Asian Mall.CMC01/02/2016 10.00 20/02/20169.909.808.41CompletedCompleted
101 KLB15R712169KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Box culvert near Asian Mall & Lahoti Petrol Pump Junction.CMC01/02/2016 20.00 20/02/201620.0019.6718.46CompletedCompleted
102 KLB15R712170KalaburagiInfrastructureRoads & BridgesGeneralProviding Pavers from Kamat Hotel to Janata Bazar at Super Market.CMC01/02/2016 19.00 20/02/201618.9717.6512.58CompletedCompleted
103 KLB15R712171KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from old Chowk Police Station to Heritage Hotel via Prakash Talkies.CMC01/02/2016 95.00 20/02/201695.0594.5889.14CompletedCompleted
104 KLB15R712172KalaburagiInfrastructureRoads & BridgesGeneralImprovement to road from Langoti Peer Darga to Filter bed road. (GDA 80 ft road)CMC01/02/2016 95.00 20/02/201695.1094.6290.00CompletedCompleted
105 KLB15R712173KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road S.V.P Circle to PDA Engineering College .CMC01/02/2016 98.50 20/02/201698.0993.9997.14CompletedCompleted
106 KLB15R712174KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from old Jewargi under Bridge to PDA Engineering College under Bridge Tarfile Main road. + Work slip amount 8.28CMC01/02/2016 99.50 20/02/2016107.3798.48106.73CompletedCompleted
107 KLB15R712177KalaburagiInfrastructureRoads & BridgesGeneralFormation of road from Parivar Hotel to Sayyed Chincholli road in Shivshakti Nagar W.No: 23CMC01/02/2016 45.00 20/02/201645.0041.6340.19CompletedCompleted
108 KLB15R712178KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road Opp: PDA Engineering College Rub House and V.G. Womens College to Deshmuk sab House.CMC01/02/2016 13.00 20/02/201613.0012.4212.92CompletedCompleted
109 KLB15R712179KalaburagiInfrastructureRoads & BridgesGeneralImprovement road and drain from Biddapur main road to Railway under Bridge at Datta Nagar W.No: 50CMC01/02/2016 50.00 20/02/201650.2949.9347.80CompletedCompleted
110 KLB15R712180KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from ring road (High Court) Bus Stand to Mannur Advocate house and Navade Aparajita house to Basavaraj house via Umesh Jankar house at KHB colony.CMC01/02/2016 50.00 20/02/201649.8845.5249.15CompletedCompleted
111 KLB15R712181KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Pradeep Mitri house to ring road via T.V.Shivanand house and IT Park gate at KHB colony.CMC01/02/2016 50.00 20/02/201649.8844.0343.91CompletedCompleted
112 KLB15R712182KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road & Drain from Chandrabhushan Nivas (Arihanth School) to Siddiveer Nivas & Revansiddappa Police Patil house at Revansiddeshwar Colony in W.No.32 in Kalaburagi City.CMC18/02/2016 50.00 26/02/201650.0040.9246.18CompletedCompleted
113 KLB15R712183KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road & Drain from Jagadevappa M.Magali house to Vijaykumar Jadhav house in Revansiddeshwar Colony in W.No.32 in Kalaburagi City.CMC18/02/2016 50.00 26/02/201650.0040.4845.69CompletedCompleted
114 KLB15R712184KalaburagiInfrastructureRoads & BridgesGeneralImprovements of road from Adarsh Kalyan Mantap to existing road at Gubbi colony in Kalaburagi city.CMC18/02/2016 20.00 26/02/201620.0016.5716.77CompletedCompleted
115 KLB15R712185KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Drain surrounding Masjid-E-Rahim, Macca colony in W.No.13 in Kalaburagi City.CMC18/02/2016 15.00 26/02/201615.0012.4014.55CompletedCompleted
116 KLB15R712186KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road & drain from Vaishanavi Kiran shop to Panduranga Biradar house at Dastapur Pasar house to Uma Shetty house in Revansiddeshwar colony W.No.32 in Kalaburagi City.CMC18/02/2016 75.00 26/02/201675.0061.5370.00CompletedCompleted
117 KLB15R712187KalaburagiInfrastructureRoads & BridgesGeneralConstruction of road from Masjid to Abdul Raheem (Deputy Tahasildar) Milat Nagar in Kalaburagi City.CMC18/02/2016 10.00 26/02/201610.008.379.39CompletedCompleted
118 KLB15R712188KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Darga Main road (Royal enfield showroom) to MG road via Masjid-E-Umra in Kalaburagi City.CMC18/02/2016 40.00 26/02/201640.0034.9541.76CompletedCompleted
119 KLB15R712189KalaburagiInfrastructureRoads & BridgesGeneralFormation of road Gunj main road to shivaji Nagar near Basalingeshwar Temple (Beside Bharat Dal Mill) in Bhavani Nagar W.No.3 in Kalaburagi City.CMC18/02/2016 18.00 26/02/201618.0014.5014.31CompletedCompleted
120 KLB15R712190KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Ring to 110 KV Station (Sindigi road) in W.No.20 in Kalaburagi City.CMC18/02/2016 25.00 26/02/201625.0023.2921.69CompletedCompleted
121 KLB15R712191KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from KEB Khazana OHT to Gunj Main road beside Darbar Hotel via Sanjay Nagar in W.No.8 in Kalaburagi City.CMC18/02/2016 25.00 26/02/201625.0023.3220.36CompletedCompleted
122 KLB15R712192KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road & Drain from Ansari & Palavala House to Islamabad main road via Sarmuddin house in W.No.4 in Kalaburagi city.CMC18/02/2016 25.00 26/02/201625.0021.0823.16CompletedCompleted
123 KLB15R712193KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Drain from KBN Compound Dubai Galli W.No.4 in Kalaburagi city.CMC18/02/2016 15.00 26/02/201615.0012.6814.47CompletedCompleted
124 KLB15R712194KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road from Zikrya Masjid to ASI Liyakat Ali House in W.No.46 in Kalaburagi City.CMC18/02/2016 12.00 26/02/201612.0010.4210.15CompletedCompleted
125 KLB15R712195KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Amruth Chincholikar house to Kusnoor main road via Guttedar house in Kalaburagi City.CMC18/02/2016 30.00 26/02/201630.0025.1126.33 CompletedCompleted
126 KLB15R712196KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from New Jewargi road to Panchasheel Nagar via Mahaveer Nagar in Kalabuargi City.CMC18/02/2016 62.00 26/02/201662.0046.0045.67CompletedCompleted
127 KLB15R712197KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Kothari Bhavan to Venkatgiri Hotel (over Bridge road) in Kalabuargi city.CMC18/02/2016 22.50 26/02/201622.5021.4821.31CompletedCompleted
128 KLB15R712198KalaburagiInfrastructureRoads & BridgesGeneralFormation of road from Sparkal School to Ring road W.No.54 in Kalaburagi cityCMC18/02/2016 45.00 26/02/201645.0037.7440.00CompletedCompleted
129 KLB15R712199KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road & Drain at Tarfile area W.No.53 in Kalabuargi City.CMC18/02/2016 30.00 26/02/201630.0029.5129.06CompletedCompleted
130 KLB15R712200KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Kalyani Petrol pump to Children Park in Kalaburagi City.CMC18/02/2016 25.00 26/02/201625.0022.9820.19CompletedCompleted
131 KLB15R712201KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Storm Water Drain from Old LML Showroom (Opp: Janata Grah Nirman Layout) to Dobhighat via Kalyani Petrol Pump in Kalaburagi City.CMC18/02/2016 99.00 26/02/201699.0085.0482.46CompletedCompleted
132 KLB15R712202KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Nisar Ahmed house to Icon Vally In Misbhan Nagar MSK Mill in W.No: 20 Kalabuargi city.CMC18/02/2016 10.00 26/02/201610.008.698.35CompletedCompleted
133 KLB15R712203KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Storm Water Drain & Raod from Ganesh Temple existing SWD to Vijayvani Building via S.Tivari house at Sharan Nagar in Kalaburagi city.CMC18/02/2016 25.00 26/02/201625.0021.3918.39CompletedCompleted
134 KLB15R712204KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Storm Drain Dr.Vishavanath Reddy Hospital to Anand lodge existing drin at Shanti Nagar in Kalaburagi city.CMC18/02/2016 16.00 26/02/201616.0013.0212.41CompletedCompleted
135 KLB15R712205KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Gunj main road to Police house via Salasara Function Hall & Behind Malu Factory to Gunj main road in W.No.3 in Kalaburagi city.CMC18/02/2016 40.00 26/02/201640.0037.7537.60CompletedCompleted
136 KLB15R712206KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Taineralu house to Ashwinikumar house & Rayappa Rtd. Tahasildar house to B.S.Patil Sagar house at NGO's colony in W.No.30 in Kalaburagi city.CMC18/02/2016 16.50 26/02/201616.5015.6416.27CompletedCompleted
137 KLB15R712207KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Veeranna Padshetty house to Annappa Hebal and around park at Pragati colony in Kalaburagi city.CMC18/02/2016 19.00 26/02/201619.0016.6014.09CompletedCompleted
138 KLB15R712208KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road from Gundarao Keshwar house to Mahadevappa Mahindrakar house and Shashikala Swamy house to Guru Swamy house at Gubbi colony in Kalaburagi cityCMC18/02/2016 16.25 26/02/201616.2513.0713.02CompletedCompleted
139 KLB15R712209KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Huda Masjid to PNT road at Nagar in Kalaburagi city.CMC18/02/2016 34.00 26/02/201634.0031.9626.58CompletedCompleted
140 KLB15R712210KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Rudrawadi Hospital to Al Ameen School at Rahemat Nagar in Kalaburagi cityCMC18/02/2016 26.70 26/02/201626.7023.2721.36CompletedCompleted
141 KLB15R712211KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road from Aland rod to High school at W.No.18 in Kalaburagi City.CMC18/02/2016 27.00 26/02/201627.0025.4923.28CompletedCompleted
142 KLB15R712212KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Qadri chowk to Mallikarjun Temple at W.No.19 in Kalaburagi cityCMC18/02/2016 14.00 26/02/201614.0013.309.50CompletedCompleted
143 KLB15R712213KalaburagiInfrastructureRoads & BridgesGeneralConstruction of road from Vijay Nagar to Qhadri chowk at W.No.19 in Kalaburagi city.CMC18/02/2016 33.00 26/02/201633.0028.2025.69CompletedCompleted
144 KLB15R712214KalaburagiInfrastructureRoads & BridgesGeneralFormation of road from Taj Nagar main road to Tajsultanpur road in Kalaburagi city.CMC18/02/2016 30.00 26/02/201630.0024.2722.99CompletedCompleted
145 KLB15R712216KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road in Vardhanagar of Kalaburagi city.CMC18/03/2016 14.50 18/03/201614.5012.8212.76CompletedCompleted
146 KLB15R712217KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from old ESI Hospital to Join M.S.K Mill Main road Ward No.50 in Kalaburagi city.CMC18/03/2016 64.90 18/03/201664.9062.3659.61CompletedCompleted
147 KLB15R712218KalaburagiInfrastructureRoads & BridgesGeneralImprovement of from Z.P Division office to District Consumer Forum office at Prashanth Nagar W.No.46 in Kalaburagi city.CMC18/03/2016 19.00 18/03/201619.0015.7615.40CompletedCompleted
148 KLB15R712219KalaburagiInfrastructureRoads & BridgesGeneralProviding RCC Cover Slab on existing Strom Water Drain from Back side Asian Mall to Advocates Colony Culvert at W.No.47 in Kalaburagi City.CMC18/03/2016 38.90 18/03/201638.9033.8735.11CompletedCompleted
149 KLB15R712220KalaburagiInfrastructureRoads & BridgesGeneralProviding and Laying CC road from Shivasharanagar Dhaba to Sedam Main road at Sri Siddaganga Area in Kalaburagi city.CMC18/03/2016 12.12 18/03/201612.1211.3211.18CompletedCompleted
150 KLB15R712221KalaburagiInfrastructureRoads & BridgesGeneralConstruction of Strom Water Drain from Kotambari Layout Rub to Shakthi Nagar Rub W.No.51 in Kalaburagi city.CMC18/03/2016 29.20 18/03/201629.2025.0817.76CompletedCompleted
151 KLB15R712222KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Govt B.ed College to Women's Polytechnic College in Kalaburagi City.CMC18/03/2016 20.73 18/03/201620.7318.8519.37CompletedCompleted
152 KLB15R712223KalaburagiInfrastructureRoads & BridgesGeneralConstruction of RCC Drain in Kapnoor Harijinwada at ward No.32 in Kalaburagi city.CMC18/03/2016 63.28 18/03/201663.2862.8552.13CompletedCompleted
153 KLB15R712224KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Vergis House to Padma Nivas House Via Chetan Durgi House W.No.51 in Kalaburagi city.CMC18/03/2016 21.00 18/03/201621.0017.3919.06CompletedCompleted
154 KLB15R712225KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Dr.Suresh House to Railway Track at Godutai colony W.No.51CMC18/03/2016 41.87 18/03/201641.8736.0435.89CompletedCompleted
155 KLB15R712226KalaburagiInfrastructureRoads & BridgesGeneralImprovements of road at Chandrashekar Patil Studium in Kalaburagi City.CMC22/03/2016 43.61 18/03/201643.6137.2445.40CompletedCompleted
156 KLB15R712227KalaburagiInfrastructureRoads & BridgesGeneralImprovement of Road from Sri Veerayya Swami House ward No.51 in Kalaburagi city.CMC31/05/2016 12.50 30/07/201612.5010.109.61CompletedCompleted
157 KLB15R712228KalaburagiInfrastructureRoads & BridgesGeneralImprovement of Road from Basawarajappa House to new Jewargi Main road at Godutai colony ward No.51 in Kalaburagi city.CMC31/05/2016 9.51 30/07/20169.517.377.12CompletedCompleted
158 KLB15R712229KalaburagiInfrastructureRoads & BridgesGeneralImprovement of Road from Jambannagouda House to railway track at Godutai colony ward No.51 in Kalaburagi city.CMC31/05/2016 15.00 30/07/201615.0011.6212.83CompletedCompleted
159 KLB15R712230KalaburagiInfrastructureRoads & BridgesGeneralImprovement of Road from Sri Sajjad house to Sri Mallikarjun House at Godutai colony ward No.51 in Kalaburagi city.CMC31/05/2016 9.11 30/07/20169.117.067.02CompletedCompleted
160 KLB15R712231KalaburagiInfrastructureRoads & BridgesGeneralImprovement of Road from Godutai colony post office to railway track via Veerayya Swami house at Godutai colony Ward No.51 in Kalaburagi city.CMC31/05/2016 19.21 30/07/201619.2115.3814.49CompletedCompleted
161 KLB15R712232KalaburagiInfrastructureRoads & BridgesGeneralProviding CC road from Asha Jyoti to Vandana teacher house at Laxmi nagar W. No 30 in KalabaragiCMC26/07/2016 12.00 26/07/201612.009.549.22CompletedCompleted
162 KLB15R712233KalaburagiInfrastructureRoads & BridgesGeneralProviding CC road from GDA 80ft road to Gola house at Laxmi nagar W. No 30 in KalabaragiCMC26/07/2016 12.75 26/07/201612.7510.148.46CompletedCompleted
163 KLB15R712234KalaburagiInfrastructureRoads & BridgesGeneralProviding CC road from Sedam main road to S.S Patil house at Bhayanagar in KalabaragiCMC26/07/2016 17.00 26/07/201617.0013.5313.45CompletedCompleted
164 KLB15R712237KalaburagiInfrastructureRoads & BridgesGeneralProviding Pumping Machinery and pipeline work at Seed farm, Kotnoor village of Nandikoor GP Kalaburagi Taluka- farm pond to GDA Compound.RWS31/03/2016 5.00 31/03/20165.004.924.92ಕಾಮಗಾರಿ ಪೂರ್ಣಗೊಂಡಿರುತ್ತದೆ Completed
165 KLB15R712238KalaburagiInfrastructureRoads & BridgesGeneralProviding Pumping Machinery and pipeline work at Seed farm, Kotnoor village of Nandikoor GP Kalaburagi Taluka- Sri Guru College Compound to Seed farm office.RWS31/03/2016 5.00 31/03/20165.004.924.92ಕಾಮಗಾರಿ ಪೂರ್ಣಗೊಂಡಿರುತ್ತದೆ Completed
      TOTAL  6055.06 6016.064651.435183.63