LIST OF Completed MACRO WORKS

  Workcode Taluka Type Subtype Category Work Name Agency Plan Approved Date Allocation ADM Approved Date ADM Amount Work Order Amt Exp Stages of Work Feedback
1 KLB151113019AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Mallabad Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
2 KLB151113020AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Chincholli Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
3 KLB151113021AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Chnincholli Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
4 KLB151113022AfzalpurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Shiva bala nagar village of Afzalpur talukPRED24/09/2015 4.50 19/11/20154.504.453.84Completed
5 KLB151113024AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Sonna Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
6 KLB151113025AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Jewargi (B) Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
7 KLB151113026AfzalpurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Chinamageri village of Afzalpur talukPRED24/09/2015 4.50 19/11/20154.504.454.30Completed
8 KLB151113328AfzalpurInstitutionalTourismGENERALಅಫಜಲಪೂರ ತಾಲೂಕಿನ ದೇವಲ ಗಾಣಗಾಪೂರ ಗ್ರಾಮದ ಮಾರುತಿ ಜಗಬಾ ಮನೆಯಿಂದ ಸಂತೋಷ ಟೇಲರ ಮನೆಯವರೆಗೆ ಹಾಗೂ ಗಣೇಶ ಮಂದಿರದಿಂದ ಶೆಟ್ಟಿ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ ಕಾಮಗಾರಿPRED17/11/2015 10.00 18/11/201510.009.878.97Completed
9 KLB151113329AfzalpurInstitutionalTourismGENERALಅಫಜಲಪೂರ ತಾಲೂಕಿನ ದೇವಲ ಗಾಣಗಾಪೂರ ಗ್ರಾಮದ ಎಸ್.ಬಿ.ಹೆಚ್. ಎಟಿಎಂ ನಿಂದ ಬಾಷಾಸಾಬ ಜವಳಿ ಮನೆಯವರೆಗೆ ಹಾಗೂ ಸೈಬಣ್ಣಾ ನೂಲಾ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ ಕಾಮಗಾರಿPRED17/11/2015 10.00 18/11/201510.009.879.48Completed
10 KLB151113330AfzalpurInstitutionalTourismGENERALಅಫಜಲಪೂರ ತಾಲೂಕಿನ ದೇವಲ ಗಾಣಗಾಪೂರ ಗ್ರಾಮದ ಸೈಬಣ್ಣ ನೂಲಾ ಮನೆಯಿಂದ ದೇವಸ್ಥಾನದ ಮುಖ್ಯ ರಸ್ತೆಯವರೆಗೆ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ ಕಾಮಗಾರಿPRED17/11/2015 10.00 18/11/201510.009.879.69Completed
11 KLB151113331AfzalpurInstitutionalTourismGENERALಅಫಜಲಪೂರ ತಾಲೂಕಿನ ದೇವಲ ಗಾಣಗಾಪೂರ ಗ್ರಾಮದ ಅನಂತ ಘನಾತೆ ಮನೆಯಿಂದ ಬಸ್ ನಿಲ್ದಾಣ ವೃತ್ತದವರೆಗೆ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ ಕಾಮಗಾರಿPRED17/11/2015 10.00 18/11/201510.009.879.67Completed
12 KLB151113332AfzalpurInstitutionalTourismGENERALಅಫಜಲಪೂರ ತಾಲೂಕಿನ ದೇವಲ ಗಾಣಗಾಪೂರ ಗ್ರಾಮದ ಲಾಲಾಸಾಬ ಅಗರಖೇಡ ಮನೆಯಿಂದ ನಬಿಸಾಬ ದೇವಣಗಾಂವ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ ಕಾಮಗಾರಿPRED17/11/2015 10.00 18/11/201510.009.879.34Completed
13 KLB151113333AfzalpurInstitutionalTourismGENERALಅಫಜಲಪೂರ ತಾಲೂಕಿನ ದೇವಲ ಗಾಣಗಾಪೂರ ಗ್ರಾಮದ ಮಹಾದೇವ ಗುತ್ತೆದಾರ ಮನೆಯಿಂದ ದತ್ತ ದೇವಸ್ಥಾನದ ರಸ್ತೆಯವರೆಗೆ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ ಕಾಮಗಾರಿPRED17/11/2015 10.00 18/11/201510.009.878.62completed
14 KLB151113334AfzalpurInstitutionalTourismGENERALಅಫಜಲಪೂರ ತಾಲೂಕಿನ ದೇವಲ ಗಾಣಗಾಪೂರ ಗ್ರಾಮದ ಶಾಂತಾಬಾಯಿ ಮಡಿವಾಳಪ್ಪ ಮನೆಯಿಂದ ಸರಜು ಮಿಟ್ಟು ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ ಕಾಮಗಾರಿPRED17/11/2015 5.35 18/11/20155.355.284.42Completed
15 KLB151113335AfzalpurInstitutionalTourismGENERALಅಫಜಲಪೂರ ತಾಲೂಕಿನ ದೇವಲ ಗಾಣಗಾಪೂರ ಗ್ರಾಮದ ಮಾರುತಿ ಜಗಬಾ ಮನೆಯಿಂದ ದೇವಸ್ಥಾನದ ಮುಖ್ಯರಸ್ತೆಯವರೆಗೆ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ ಕಾಮಗಾರಿPRED17/11/2015 10.00 18/11/201510.009.878.47Completed
16 KLB151113336AfzalpurInstitutionalTourismGENERALಅಫಜಲಪೂರ ತಾಲೂಕಿನ ದೇವಲ ಗಾಣಗಾಪೂರ ಮಂದಿರದ ಸುತ್ತಮುತ್ತ ಸೋಲಾರ್ ಸ್ಟ್ರೀಟ್ ಲೈಟ್ ಅಳವಡಿಸುವ ಕಾಮಗಾರಿ.CEO17/11/2015 15.00 18/11/201515.000.000.00Completed
17 KLB151123023AfzalpurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Bankalaga Village of Afzalpur talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
18 KLB151123279AfzalpurInfrastructureWater SupplyGENERALInstallation of WPP Plant in Bhognalli Village under JalamrithRWS01/11/2016 4.45 11/01/20164.453.811.91ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್(physically completed)
19 KLB151123280AfzalpurInfrastructureWater SupplyGENERALInstallation of WPP Plant in Chowdapur & Tanda Village under JalamrithRWS01/11/2016 4.45 11/01/20164.453.812.67ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್ (physically completed)
20 KLB151123281AfzalpurInfrastructureWater SupplyGENERALInstallation of WPP Plant in Shirwal Village under JalamrithRWS01/11/2016 4.45 11/01/20164.453.811.14ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್
21 KLB151123282AfzalpurInfrastructureWater SupplyGENERALInstallation of WPP Plant in Bhosga Village under JalamrithRWS01/11/2016 4.44 11/01/20164.453.812.67ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್(physically completed)
22 klb151123283AfzalpurInfrastructureWater SupplyGENERALInstallation of WPP plant in Aurad village under JalamrithRWS11/01/2016 4.45 11/1/20164.453.811.52ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್
23 KLB1513106KalaburagiInstitutionalUniversityGENERALConstruction of Sanitary Landfill pit with Leachate collection tank at Central University, KalaburagiCMC01/03/2016 14.78 01/03/201614.8014.0213.74Completed
24 KLB1513109KalaburagiInstitutionalUniversityGENERALDry waste and compost storage unit in Central University, KalaburagiCMC01/03/2016 5.00 01/03/20164.924.713.65Completed
25 KLB1513110KalaburagiInstitutionalUniversityGENERALElectrification work at Central University, KalaburagiCMC01/03/2016 5.00 01/03/20163.423.372.54Completed
26 KLB1513111KalaburagiInstitutionalUniversityGENERALSinking of Borewell and providing 1HP pumping Machinery at Central University, Kalaburagi CMC01/03/2016 1.51 01/03/20161.511.470.26Completed
27 KLB151413251AfzalpurInfrastructureRoads & BridgesGeneralFormation of road from Takkalaki village to old chowadeshwari temple in Afzalpur talukPRED22/06/2015 47.83 05/01/201647.8346.348.92Physically Completed Final bill submitted
28 KLB152113028AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. PS School premises of Naroona Village of Aland talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
29 KLB152113029AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. PS School premises of Duttargaon Village of Aland talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
30 KLB152113030AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Padasavali Village of Aland talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
31 KLB152113033AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Khajuri Village of Aland talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
32 KLB152113034AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. PS School premises of Khajuri Village of Aland talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
33 KLB152113035AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Babaleshiwar Village of Aland talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
34 KLB152113036AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Nimbarga Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.99ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
35 KLB152113037AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Yelasangi Village of Aland talukRWS24/09/2015 1.50 19/11/20151.500.990.99ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
36 KLB152113038AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. High School premises of Jawali Village of Aland talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
37 KLB152113039AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. HPS School premises of Munnalli Village of Aland talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
38 KLB152113040AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. HPS School premises of Tadakal Village of Aland talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
39 KLB152113041AlandInfrastructureWater SupplyGeneralProvision of RO Plants in Govt. HPS School premises of Belamagi Village of Aland talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
40 KLB152113042AlandInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Ningadalli village of Aland talukPRED24/09/2015 4.50 09/11/20154.504.454.44cOMPLETED
41 KLB152113043AlandInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Kamalanagar village of Aland talukPRED24/09/2015 4.50 19/11/20154.504.451.59Phy Completed
42 KLB152123027AlandInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Kadaganchi Village of Aland talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
43 KLB152123031AlandInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Hallisalagar Village of Aland talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
44 KLB152123094AlandInfrastructureRoads & BridgesGeneralFormation of road from Duttargaon main road to Amareshwar Temple at Duttargaon Village in Aland TalukaPRED09/10/2015 15.00 29/01/201615.0013.3112.00Physically Completed
45 KLB152123117AlandInfrastructureRoads & BridgesGeneralCC road in Rudrawadi village in Aland talukPRED07/10/2015 25.00 07/01/201625.0023.6223.62 Completed
46 KLB153113045ChincholiInfrastructureSanitationGeneralConstruction of Public Tiolet in Chengata village of Chincholli talukPRED24/09/2015 4.50 19/11/20154.504.453.43Phy COmpleted
47 KLB153123008AlandInfrastructureRoads & BridgesGeneralImprovement and repair of road from Syed Chincholli to Jumbaga(B)PMGSY12/01/2016 273.30 23/02/2016264.90228.26217.51 Completed.
48 KLB153123009AlandInfrastructureRoads & BridgesGeneralImprovement to road from Syed Chincholi to Aloor NaronaPMGSY12/01/2016 498.50 23/02/2016495.10406.81294.89Completed.
49 KLB153123012ChincholiInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in SC colony of Miriyan village in Chinchol talukPRED05/08/2015 4.50 19/11/20154.504.454.00wORK cOMPLETED
50 KLB153123047ChincholiInfrastructureSanitationGeneralConstruction of Public Tiolet in Koldagi cross of Chincholli talukPRED24/09/2015 4.50  0.004.453.60Complete
51 KLB153123157ChincholiInfrastructureRoads & BridgesGeneralConstn of CC road with drian and CD at Chandapur Ashraya colony internal roads Chandapur in Chincholi townKRIDL-225/01/2016 157.13 25/01/2016157.130.00157.13Completed
52 KLB153123158ChincholiInfrastructureRoads & BridgesGeneralConstn of CC road with drian and CD from Chincholi SBH bank to infront to Laxmi temple here agashi via Bogappa Master house in Chincholi townKRIDL-225/01/2016 101.46 25/01/2016101.460.00101.46Completed.
53 KLB153123159ChincholiInfrastructureRoads & BridgesGeneralConstn of CC road with drian and footpath Harkood school to Shivakumar Paliyd house Basavanagar Chandapur in Chincholi townKRIDL-225/01/2016 136.82 25/01/2016136.820.00136.82Completed.
54 KLB153123160ChincholiInfrastructureRoads & BridgesGeneralConstn of CC road with drian and CD Chincholi Sri Ram nagar vijaykumar houseto Tukaram chandrampalli house via Prabhu Dandin house in Chincholi townKRIDL-225/01/2016 53.04 25/01/201653.040.0053.05completed
55 KLB153413253ChincholiInfrastructureRoads & BridgesGeneralFormation of road from Chimmanchod to Basavantpur in Chincholli PRED22/06/2015 50.00 29/02/201649.7045.3143.45Physicaly Completed
56 KLB154123001ChittapurInfrastructureRoads & BridgesGeneralFormation of road from Chittapur taluk footpath to bhosga road ( A.P border ) (SH126) Km 58-60 double lane PWD SEDAM03/09/2015 178.20 07/01/2016178.20170.45166.94Work Completed
57 KLB154123002ChittapurInfrastructureRoads & BridgesGeneralImprovement of Drains in Dandoti village Chittapur takukPRED03/09/2015 25.80 05/11/201525.8025.3723.60physically completed
58 KLB154123003ChittapurInfrastructureRoads & BridgesGeneralImprovement on Chittapur Malkhed Road and road over bridge on Kagina river in Malkhed villagePMGSY19/10/2015 49.50 05/11/201549.5046.9346.92Completed
59 KLB154123048ChittapurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Hosur village of chittapur talukPRED24/09/2015 4.50 19/11/20154.504.454.40WORK COMPLETED
60 KLB154123049ChittapurInfrastructureSanitationGeneralConstruction of Public Tiolet in Herur K village of Chittapur talukPRED24/09/2015 4.50 19/11/20154.504.454.21ಕೆಲಸ ಮುಗಿದಿದೆ
61 KLB154123050ChittapurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Banahatti village of chittapur talukPRED24/09/2015 4.50 19/11/20154.504.453.68completed
62 KLB154123051ChittapurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Taritanda of Chittapur talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಭೌತಿಕವಾಗಿ ಕೆಲಸ ಮುಗಿದಿದೆ
63 KLB154123053ChittapurInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Bhankur Village of Chittapur talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಭೌತಿಕವಾಗಿ ಕೆಲಸ ಮುಗಿದಿದೆ
64 KLB154123054ChittapurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Halakatta village of chittapur talukPRED24/09/2015 4.50 19/11/20154.504.453.50completed
65 KLB154123055ChittapurInfrastructureSanitationGeneralConstruction of Public Tiolet for Women in Madabool Tanda of chittapur talukPRED24/09/2015 4.50 19/11/20174.504.454.35completed
66 KLB154123118ChittapurInfrastructureWater supplyGeneralProviding mother drain 530 mts setting champer Areation pound to Kalgi (part-2)RWS03/10/2015 49.11 03/10/201549.1149.0643.90completed
67 KLB154123156ChittapurInfrastructureRoads & BridgesGeneralConst of road on both side of under bridge in Shampurhalli in Chittapur tqRailways31/12/2015 185.65  0.00185.650.00work completed and fund released to railway dept Guntakal
68 klb154123287ChittapurInfrastructureWater SupplyGENERALInstallation of WPP plant in Hosur village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.812.29Plant commissioned(physically completed)
69 klb154123288ChittapurInfrastructureWater SupplyGENERALInstallation of WPP plant in Wacca village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.813.05Plant commissioned (physically completed)
70 klb154123291ChittapurInfrastructureWater SupplyGENERALInstallation of WPP plant in Itaga village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.812.28Plant commissioned
71 klb154123292ChittapurInfrastructureWater SupplyGENERALInstallation of WPP plant in Devan tegnoor village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.813.05Plant commissioned
72 KLB154413248ChittapurInstitutionalschoolGeneralConstruction of 3 rooms to Govt. High School at KalagiPRED18/01/2016 20.00 19/07/201620.0019.2618.72Phy Completed
73 KLB154413249ChittapurInstitutionalschoolGeneralConstruction of 2 rooms Govt. High school at Bedsoor village in Chittapur TalukaPRED18/01/2016 20.00 12/09/201620.0019.2418.46Physically Completed.
74 KLB154623231ChittapurInfrastructureWater SupplyGeneralProviding water supply scheme to PHC centre @ Arnakal village in Chittapur talukaRWS23/12/2016 8.92 23/12/20168.928.836.69ಕೆಲಸ ಮುಗಿದಿದೆ
75 KLB155113018JewargiInfrastructureWater supplyGeneralProviding Chainlink fencing & Electrochlorinator to open well @ Jainapur village in Jewargi talukRWS05/08/2015 4.50 23/11/20154.503.472.58ಕಾಮಗಾರಿ ಪೂರ್ಣಗೊಂಡಿದೆ
76 KLB155113056JewargiInfrastructureWater supplyGeneralProviding Chainlink fencing & Electrochlorinator to open well @ Andola village in Jewargi talukRWS24/09/2015 4.00 23/11/20154.002.932.48ಕೆಲಸ ಮುಗಿದಿದೆ
77 KLB155113057JewargiInfrastructureWater supplyGeneralProviding Chainlink fencing & Electrochlorinator to open well @ Mudabal (B) village in Jewargi talukRWS24/09/2015 4.00 23/11/20154.002.932.13ಕೆಲಸ ಮುಗಿದಿದೆ
78 KLB155113058JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Haranur Village of Jewargi talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
79 KLB155113063JewargiInfrastructureSanitationGeneralConstruction of Public Tiolet in Narayanapur village of Jewaragi talukPRED24/09/2015 4.50 19/11/20154.504.453.75ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
80 KLB155113064JewargiInfrastructureSanitationGeneralConstruction of Public Tiolet in Balabatti village of Jewaragi talukPRED24/09/2015 4.50 26/09/20154.504.453.20Phy completed
81 KLB155123013JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Ganvar Village of Jewargi talukRWS05/08/2015 1.50 19/11/20151.501.480.99ಭೌತಿಕವಾಗಿ ಕೆಲಸ ಮುಗಿದಿದೆ
82 KLB155123015JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Aurad Village of Jewargi talukRWS05/08/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
83 KLB155123016JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Biral (B) Village of Jewargi talukRWS05/08/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
84 KLB155123017JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Andola Village of Jewargi talukRWS05/08/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
85 KLB155123059JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Haraval Village of Jewargi talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
86 KLB155123060JewargiInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Gudur S A Village of Jewargi talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
87 KLB155123062JewargiInfrastructureSanitationGeneralConstruction of Public Toilet in Vastari village of Jewaragi talukPRED24/09/2015 4.50 23/11/20154.504.454.29completed
88 KLB155123093JewargiInfrastructureRoads & BridgesGeneralConsruction of CC road from Sharanappa Jainapur House to Govt School & ST colony to Main road in Naribol village, Jewargi talukPRED09/10/2015 15.00 28/01/201714.9014.619.38phy Completed
89 KLB155123210JewargiInfrastructureNemmadi UruGeneralMonitoring and service tax for Electirfication work at ward no 38 and installation of Controlling point in JewargiTMC JEWARGI05/05/2016 2.91 05/05/20162.912.912.91Completed
90 KLB155413252JewargiInfrastructureRoads & BridgesGeneralFormation of road from Harizan colony to Hana basaveshwar colony temple in Nelogi village Jewargi talukPRED22/06/2015 32.71 05/01/201632.7132.0932.02completed
91 KLB156113077SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt.High School premises of Malakhed village of Sedam talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
92 KLB156113078SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Kurikunta village of Sedam talukRWS24/09/2015 1.50 18/01/20161.501.480.99ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
93 KLB156113079SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Adaki village of Sedam talukRWS24/09/2015 1.50 23/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
94 KLB156113080SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Ranjol village of Sedam talukRWS24/09/2015 1.50 23/11/20151.501.480.99ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
95 KLB156113081SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Duganur village of Sedam talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
96 KLB156113082SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Nachawar village of Sedam talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
97 KLB156113083SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Buragpalli village of Sedam talukRWS24/09/2015 1.50 23/11/20151.501.480.99ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
98 KLB156113084SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Batagera (B) village of Sedam talukRWS24/09/2015 1.50 23/11/20151.501.480.99ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
99 KLB156113085SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Sindhanamadu village of Sedam talukRWS24/09/2015 1.50 23/11/20151.501.480.99ಕಾಮಗಾರಿ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
100 KLB156123072SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Mudhol village of Sedam talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
101 KLB156123073SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. High School premises of Medak village of Sedam talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
102 KLB156123076SedamInstitutionalWater supplyGeneralProvision of RO Plants in Govt. HPS School premises of Beeranalli village of Sedam talukRWS24/09/2015 1.50 19/11/20151.501.480.99ಕೆಲಸ ಭೌತಿಕವಾಗಿ ಮುಗಿದಿದೆ
103 KLB156123134SedamInfrastructureRoads & BridgesGeneralConstn of approach road to Madaranarasapalli from SH 122 (Imadapur cross) Km 0.00 to 2.450 in Sedam talukaPWD SEDAM29/10/2015 92.00 04/01/201681.0080.0679.83Work Completed
104 KLB156123135SedamInfrastructureRoads & BridgesGeneralConstn of approach road to Hala hanamanhalli from Sindhanamadu village Km 0.00 to 0.300 in Sedam talukaPWD SEDAM29/10/2015 13.55 04/01/201613.2511.5910.84Work completed
105 KLB156123136SedamInfrastructureRoads & BridgesGeneralConstn of approach road to Batagera (B) from SH10 km 0.00 to 1.60 in Sedam talukaPWD SEDAM09/01/2016 169.60 09/01/2016169.60162.08161.21Work completed
106 KLB156413254SedamInfrastructureRoads & BridgesGeneralConstruction of approach road to Madhwar from SH-122 Km 0.00 to 0.410 in Sedam TalukaPWD SEDAM11/08/2015 25.00 05/01/201624.0023.6920.92Work completed
107 KLB156423255SedamInfrastructureRoads & BridgesGeneralFormation of CC road & drain in Rajol village in Sedam talukKRIDL-216/11/2015 25.00 03/05/201625.0024.5025.00Completed.
108 KLB157113065KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet in Kadani village of Kalaburagi talukPRED24/09/2015 4.50 23/11/20154.504.454.07complted
109 KLB157113086KalaburagiInfrastructureRoads & BridgesGeneralConstruction of RCC Drain & NP3 pipe line drain from bhimalli house to fort @ ward no. 33 KalaburagiNK22/07/2015 11.50 22/07/201511.5011.507.90Work Completed & handed over
110 KLB157113087KalaburagiInfrastructureRoads & BridgesGeneralConstruction of RCC Drain from Chowdeshwar school Jange brothers & Shivand swamy house to main road @ ward no. 34 kalaburagiNK22/07/2015 20.89 22/07/201520.8920.8913.88Work Completed
111 KLB157113088KalaburagiInfrastructureRoads & BridgesGeneralProviding 12m high mast light @ ward no. 33 kalaburagiNK22/07/2015 2.90 22/07/20152.902.902.88Work Completed & handed over
112 KLB157113089KalaburagiInfrastructureRoads & BridgesGeneralProviding Drilling of borwell @ ward no. 34 KalaburagiNK22/07/2015 1.28 22/07/20151.281.280.00Work Completed & handed over
113 KLB157113090KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Chigarahalli Yedrami main road to Gogihal village PMGSY14/12/2015 119.79 14/12/2015119.79111.90110.74Completed
114 KLB157113168KalaburagiInstitutionalPark GeneralConstruction of shops at Public Exhibition Ground Kotnoor D Park KalaburagiNK28/01/2015 40.80 22/08/201540.8040.8042.36Work completed
115 KLB157113169KalaburagiInstitutionalPark GeneralConstruction of footpath outside compound wall @ Rajiv Gandhi Theme park, KalaburagiNK30/09/2015 38.46 29/09/201538.4638.4924.35Work completed
116 KLB157113173KalaburagiInstitutionalSportsGeneralInstallation of Indoor synthetic Tennis court 3 no. @ CP Stadium KalaburagiNK20/06/2015 32.23 20/06/201532.2332.2332.19Work Completed & handing over certificate submitted
117 KLB157113174KalaburagiInstitutionalSportsGeneralInstallation of 1 no. Synthetic Tennis court @ Police Ground KalaburagiNK20/06/2015 13.45 20/06/201513.4513.4512.07Work completed & handing over certificate submitted
118 KLB157113175KalaburagiInstitutionalSportsGeneralConstruction of clay tennis court @ block 1 Police Ground KalaburagiNK20/06/2015 3.94 20/06/20153.943.943.93Work Completed & handing over certificate submitted
119 KLB157113176KalaburagiInstitutionalSportsGeneralConstruction of clay tennis court @ block 2 Police Ground KalaburagiNK20/06/2015 3.94 20/06/20153.943.943.93Work Completed & handing over certificate submitted
120 KLB157113177KalaburagiInstitutionalSportsGeneralInstallation of Indoor synthetic Badminton court 6 no. @ CP Stadium KalaburagiNK20/06/2015 41.24 20/06/201541.2441.2442.10Work Completed & handing over certificate submitted
121 KLB157113178KalaburagiInstitutionalSportsGeneralIndoor renovation work @ CP Stadium Kalaburagi [Badminton court]NK22/07/2015 9.85 30/03/20159.859.858.25Work Completed & handing over certificate submitted
122 KLB157113179KalaburagiInstitutionalSportsGeneralInstallation of Indoor synthetic Badminton court 2 no. @ Govt officers family club KalaburagiNK22/08/2015 7.29 22/08/20157.297.297.26Work Completed & handing over certificate submitted
123 KLB157113180KalaburagiInstitutionalSportsGeneralConstruction of ELSR 50KL capacity at CP Stadium KalaburagiNK16/09/2015 10.82 16/09/201510.8310.838.76Work completed
124 KLB157113181KalaburagiInstitutionalSportsGeneralProviding fencing to hand ball court @ Chandrashekhar patil stadium KalaburagiNK24/11/2015 9.15 24/11/20159.159.1511.63Work completed & handing over certificate submitted
125 KLB157113182KalaburagiInstitutionalSportsGeneralConstruction of 2 Hand ball court benches & lightening poles @ Chandrashekhar patil Stadium KalaburagiNK24/11/2015 23.25 24/11/201523.2523.2523.17Work completed & handing over certificate submitted
126 KLB157113183KalaburagiInstitutionalSportsGeneralConstruction of Kabaddi court for 2 unit blocks @ CP Stadium KalaburagiNK22/07/2015 4.66 22/07/20154.664.662.07Work completed
127 KLB157113184KalaburagiInstitutionalSportsGeneralConstruction of Kho Kho court @ CP Stadium KalaburagiNK22/07/2015 2.47 22/07/20152.472.473.49Work completed
128 KLB157113185KalaburagiInstitutionalSportsGeneralProviding 20 mt High masts light 3 no. @ CP Stadium KalaburagiNK22/07/2015 16.20 22/07/201516.2016.2012.94Work completed
129 KLB157113186KalaburagiInstitutionalSportsGeneralProviding & Installation of 125 KVA Three Phase Generator with AMF control panel at CP Stadium, KalaburagiNK30/09/2015 9.72 30/09/20159.729.728.14Work completed
130 KLB157113196KalaburagiInstitutionalSportsGeneralProviding and laying water proofing to terrace and swimming pool and Chejja at CP stadium KalaburagiNK16/08/2016 18.08 16/08/201618.0818.086.46Work completed
131 KLB157113219KalaburagiInstitutionalUniversityGeneralEstimate for Light Equipments, truss civil and Electrical works for Ambedkar Auditorium at Gulbarga University, KalaburagiNK02/11/2015 36.50 02/11/201536.5036.5034.54Work completed & handed over
132 KLB157113220KalaburagiInstitutionalUniversityGeneralAdditional civil works at Ambedkar Auditorium at Gulbarga University, KalaburagiNK23/07/2016 3.82 23/07/20163.823.821.52Work completed
133 KLB157113221AfzalpurInstitutionalTourismGeneralಅಫಜಲಪೂರ ತಾಲೂಕಿನ ದೇವಲ ಗಾಣಗಾಪೂರ ಗ್ರಾಮದ ಇಬ್ರಾಹಿಂ ತಾಂಬಳೆ ಮನೆಯಿಂದ ಅನಂತ ಐನಾಟೆ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ ಕಾಮಗಾರಿPRED17/11/2015 9.65 18/11/20159.659.487.72Completed
134 KLB157113222KalaburagiInfrastructureTourismGeneralStage Lighting System Up gradation and Provision of Special effects in S.N Pandit Auditorium Dist Kalaburagi NK25/01/2016 12.33 25/01/201612.3312.3312.27Work completed
135 KLB157113223KalaburagiInfrastructureTourismGeneralSound System Up gradation and Provision of Special effects in S.N Pandit Auditorium Dist KalaburagiNK25/01/2016 9.35 25/01/20169.359.359.30Work completed
136 KLB157113224KalaburagiInstitutionalInnovativeGeneralEstablishment of small nursery at Chandrampalli Horticulture farm for Multiplication of improved varieties and hybrids of horticulture cropsNK04/08/2015 25.61 23/11/201525.6125.617.39Work completed & handed over
137 KLB157113226KalaburagiInstitutionalInnovativeGeneralEstablishment of small nursery at Kotnoor (D), Seed farm, KalaburagiNK04/08/2015 25.39 23/11/201525.3925.397.40Work completed & handed over
138 KLB157113244KalaburagiInstitutionalSocialGeneralProviding and installing of Air Conditioner and Air Cooler at High Court KalaburagiNK13/01/2016 1.07 13/01/20161.071.071.06Work completed
139 KLB157113245KalaburagiInstitutionalTraining CenterGeneralConstruction of first floor with gal volume sheet roofing at HKRDB training & evaluation center in KalaburagiNK22/04/2016 17.09 22/04/201617.0917.090.00Work completed
140 KLB157113341KalaburagiInstitutionalUniversityGENERALProviding 12.5 Mtr High mast lights 3 nos at Central University kalaburagi.NK19/03/2016 9.29 19/03/20169.299.298.60Work completed & Handed Over
141 KLB157123005KalaburagiInfrastructureRoads & BridgesGeneralFormation of BT road from old jewargi road to Udanoor village via Vargis appartment ring road in ward no 55 of KlaburagiPWD KLB21/08/2015 47.80 16/09/201547.8046.6345.97Physically completed. Final report received. Final bill paid.
142 KLB157123006KalaburagiInfrastructureRoads & BridgesGeneralRoad from Hiranagar colony road in Hirapur village , KalaburagiPMGSY08/09/2015 29.90 28/12/201525.0023.9922.45completed
143 KLB157123010KalaburagiInfrastructureRoads & BridgesGeneralImprovements of road in Bapugowda Darshanpur layout and Sardar Vallabhai Patel layout in Kalaburagi PWD KLB03/09/2015 114.20 29/10/2015139.28143.21112.63Physically completed.
144 KLB157123066KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet in Harasur village of Kalaburagi talukPRED24/09/2015 4.50 18/11/20154.504.454.35completed
145 KLB157123067KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet in Hagargundagi village of Kalaburagi talukPRED24/09/2015 4.50 23/11/20154.504.454.28completed
146 KLB157123068KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet in Mahagaon Cross of Kalaburagi talukPRED24/09/2015 4.50 23/11/20154.504.454.07completed
147 KLB157123069KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet in Melakunda K village of Kalaburagi talukPRED24/09/2015 4.50 26/09/20154.504.454.41COMPLETED
148 KLB157123070KalaburagiInfrastructureSanitationGeneralConstruction of Public Tiolet for women in Hagaraga village near Pojar colony of Kalaburagi talukPRED24/09/2015 4.50 23/11/20154.504.454.13WORK COMPLETED FINAL BILL PAID
149 KLB157123091KalaburagiInfrastructureRoads & BridgesGeneralAmbalga Thanda approach road from Gulbarga Basavakalyan road PMGSY08/09/2015 62.40 19/10/201559.6052.7351.33completed
150 KLB157123095KalaburagiInfrastructureRoads & BridgesGeneralFormation of raod from Melakunda (B) village to Bhairamadagi in Kalaburagi talukPRED09/10/2015 20.00 18/01/201620.0016.1813.09Physically Completed
151 KLB157123097KalaburagiInfrastructureRoads & BridgesGeneralFormation of BT road from Hirapur cross ring road (Dr Ambedkar circle) to Railway gate in KalaburagiCMC27/05/2016 57.80 13/07/201657.8054.0457.04Completed
152 KLB157123098KalaburagiInfrastructureRoads & BridgesGeneralFormation of BT road fron Tahsil office to Milan Chowk in KalaburagiCMC18/03/2016 24.90 18/03/201624.9021.5419.56Completed
153 KLB157123101KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no1 (Km 0.00 to 0.395)CMC25/01/2016 39.06 04/02/201639.0633.3531.04Completed
154 KLB157123102KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no2 (Km 0.00 to 0.240)CMC25/01/2016 26.10 04/02/201626.1022.2321.31Completed
155 KLB157123103KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no3 (Km 0.00 to 0.205)CMC25/01/2016 21.60 04/02/201621.6019.4520.17Completed
156 KLB157123105KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no5 (Km 0.00 to 0.115)CMC25/01/2016 12.16 04/02/201612.1611.2411.26Completed
157 KLB157123106KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no6 (Km 0.00 to 0.260)CMC25/01/2016 37.17 04/02/201637.1733.5431.24Completed
158 KLB157123107KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no7 (Km 0.00 to 0.095)CMC25/01/2016 9.90 02/02/20169.908.469.11Completed
159 KLB157123108KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no8 (Km 0.00 to 0.045)CMC25/01/2016 4.77 04/02/20164.774.614.52Completed
160 KLB157123109KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no9 (Km 0.00 to 0.045)CMC25/01/2016 4.77 04/02/20164.774.614.62Completed
161 KLB157123110KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no10 (Km 0.00 to 0.048)CMC25/01/2016 5.07 04/02/20165.074.914.77Completed
162 KLB157123111KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no11 (Km 0.00 to 0.047)CMC25/01/2016 4.97 04/02/20164.974.524.31Completed
163 KLB157123112KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no12 (Km 0.00 to 0.180)CMC25/01/2016 18.13 04/02/201618.1316.0415.97Completed
164 KLB157123113KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no13 (Km 0.00 to 0.035)CMC25/01/2016 3.68 04/02/20163.683.373.20Completed
165 KLB157123114KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no14 (Km 0.00 to 0.180)CMC25/01/2016 18.13 04/02/201618.1316.0416.94Completed
166 KLB157123115KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no15 (Km 0.00 to 0.275)CMC25/01/2016 28.01 04/02/201628.0123.9022.47Completed
167 KLB157123116KalaburagiInfrastructureRoads & BridgesGeneralDevelopment of Internal roads in ward no 1 Langar hanuman layout of Kalaburagi city Road no16 (Km 0.00 to 0.140)CMC25/01/2016 14.95 04/02/201614.9513.1613.40Completed
168 KLB157123119KalaburagiInfrastructureSanitationGeneralConstruction Toilets in 2 places at Channaveer colony in Kalaburagi city [8 toilets, 2 bath room, 2 basin with miror, 1 washing plantform with fencing, own borewell connection, overhead tank, electrical connection, sump, pit, pump]NK09/10/2015 20.00 14/12/201520.0020.002.001 work completed at Corporation vehicle parking premises, 1 completed at CP Stadium
169 KLB157123120KalaburagiInfrastructureSanitationGeneralConstruction Toilets in 2 places at Rajiv Gandhi Nagar in Kalaburagi city [8 toilets, 2 bath room, 2 basin with miror, 1 washing plantform with fencing, own borewell connection, overhead tank, electrical connection, sump, pit, pump]NK09/10/2015 20.00 14/12/201520.0020.002.003) 1 completed at CP Stadium 4) 1 completed at CP Stadium, due to non availability of site at given colony & as per oral direction of RC sir
170 KLB157123122KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CD &CC road from Annappagol house to chandrakant mechanic house & Construction of CC drain & road from annappagol house to shanranappa poojari house via taj sultapur main roadCMC09/12/2015 12.00 02/11/201612.009.879.59Completed
171 KLB157123123KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC drain & road from Jagannath kallshetty house sulbarpur main road at Channaveer colony kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.799.42Completed
172 KLB157123124KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC drain & road from Ramashetty hadapad house sultapur shivu limbal or shantayya sirgapur house in Chnnaveer colony kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.6810.02Completed
173 KLB157123125KalaburagiInfrastructureRoads & BridgesGeneralConstruction CC drain & road from Taj sultanpur maind road to nakul kumbar house uupto Shivaray busatty revur house in channveer colony in kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.609.36Completed
174 KLB157123126KalaburagiInfrastructureRoads & BridgesGeneralConstruction CC drain & road from Moonlight school to Mahadevappa badal house in channaveer colony in kalaburagiCMC09/12/2015 12.00 02/11/201612.009.609.05Completed
175 KLB157123127KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road from Nandu adaki house to Sultanpur road in Channaveer nagar Kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.629.60Completed
176 KLB157123128KalaburagiInfrastructureRoads & BridgesGeneralConstruction of CC road from Arun talati house to nagaraj reddy hous & Jai mata Finance in Chnnaveer nagar Kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.739.12Completed
177 KLB157123129KalaburagiInfrastructureRoads & BridgesGeneralConstruction CC drain & road from Mahadev temple to Ommantai house in Channaveer nagar Kalaburagi cityCMC09/12/2015 12.00 02/11/201612.009.619.57Completed
178 KLB157123131KalaburagiInfrastructureRoads & BridgesGeneralConstn of CC drain from Gunj Main road to M.K Transport office at Gandhinagar, KalaburagiPMGSY21/10/2015 35.00 23/12/201535.0031.8128.00completed
179 KLB157123132KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road surrounding Amba Bhavani Temple at Gandhinagar, KalaburagiPMGSY21/10/2015 35.00 23/12/201535.0034.5333.26completed
180 KLB157123133KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from M.K. Transport office to Gunj road in KalaburagiPMGSY21/10/2015 30.00 23/12/201530.0027.2727.26completed
181 KLB157123137KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Jange brother house to raghavendra colony CC road ( Jange Borthers Widen portion)CMC24/11/2015 50.00 28/01/201645.2538.5838.82Completed
182 KLB157123138KalaburagiInfrastructureRoads & BridgesGeneralImprovement of road from Manikeshwari temple to shahabazar Naka in Kalaburagi cityCMC03/01/2016 59.00 04/01/201659.0048.8427.05Completed
183 KLB157123139KalaburagiInfrastructureRoads & BridgesGeneralImprovement of BT road Sedam road to Veerashaiva Kalyan Mantap Via Laxmi Nagar and Om nagar in Kalaburagi City.CMC03/01/2016 54.50 04/01/201654.5048.8443.65Completed
184 KLB157123140KalaburagiInfrastructureRoads & BridgesGeneralImprovement of CC road form Opp. Fire Station to Chowdeshwari School in Kalaburagi City.CMC03/01/2016 52.00 04/01/201652.0042.8532.77Completed
185 KLB157123141KalaburagiInfrastructureRoads & BridgesGeneralConstrucation of CC road from Kalaburagi – Jewargi Main road behind Muktha Theatare in Kalaburagi City.CMC03/01/2016 38.00 04/01/201638.0023.0027.37Completed
186 KLB157123143KalaburagiInfrastructureRoads & BridgesGeneralConstrucation of Strom Water Drain Opp. ST. Joseph School in Kalaburagi City.CMC29/02/2016 29.00 04/01/201629.0026.3523.07Completed
187 KLB157123144KalaburagiInfrastructureRoads & BridgesGeneralImpts of BT road from PDA Engineering college to Vijay vidyalaya school in Kalaburagi cityCMC02/01/2016 32.00 04/01/201632.0026.0826.95Completed
188 KLB157123145KalaburagiInfrastructureRoads & BridgesGeneralConstn of CC road from Vijay Vidyalaya school to Lahoti Pertol pump in Kalaburagi cityCMC02/01/2016 93.50 04/01/201693.5074.5247.71Completed
189 KLB157123146KalaburagiInfrastructureRoads & BridgesGeneralImpts of BT road from Siddi Pasha darga to sedam road via old ZP meeting hall in Kalaburgi cityCMC02/01/2016 13.00 04/01/201613.0010.8510.85Completed
190 KLB157123147KalaburagiInfrastructureRoads & BridgesGeneralImpts of BT road from Govt Hospital circle to Darga road in Kalaburagi cityCMC02/01/2016 35.50 04/01/201635.5028.9317.79Completed
191 KLB157123148KalaburagiInfrastructureRoads & BridgesGeneralImpts of Bt road from Darga road to MRMC college via Bharath Nagar Thanda in Kalaburagi cityCMC02/01/2016 30.50 04/01/201630.5024.8719.37Completed
192 KLB157123149KalaburagiInfrastructureRoads & BridgesGeneralFormation of road from Sedam( Mahindra showroom) to Luqman college in Kalaburagi cityCMC02/01/2016 46.50 04/01/201646.5027.7136.68Completed
193 KLB157123150KalaburagiInfrastructureRoads & BridgesGeneralConstn of CC road from SVP circle to railway station (one way) in Kalaburagi cityCMC02/01/2016 52.00 04/01/201652.0042.8945.20Completed
194 KLB157123152KalaburagiInfrastructureRoads & BridgesGeneralImpt of road from Manikeshwari temple to Mallikarjun temple Kailash nagar in Kalaburagi cityCMC02/01/2016 12.50 04/01/201612.500.0010.07Completed
195 KLB157123154KalaburagiInfrastructureRoads & BridgesGeneralImpt of road from Kanni market to Ashok nagar (OHT) via Shanti nagar in Kalaburagi cityCMC02/01/2016 38.00 04/01/201638.0031.0335.04Completed
196 KLB157123155KalaburagiInfrastructureRoads & BridgesGeneralImpt of road from Jaitheeerth kalyan mantap to Navldagi layout (udnoor road) in Kalaburagi cityCMC02/01/2016 34.50 04/01/201634.5027.1618.55Completed
197 KLB157123161KalaburagiInfrastructureRoads & BridgesGeneralImpt of Kalaburagi ring road (NH218) to Kusnoor via Azadpur SH10 and Buddha Vihar Km 0.00 to 9.00 in KalaburagiPWD KLB22/08/2015 48.00 22/08/201548.0047.8947.52Completed. Final report recived. Final bill Paid.
198 KLB157123217KalaburagiInstitutionalHealthGeneralRepair work of Mammography room at District health KalaburagiNK16/08/2015 1.14 16/08/20151.141.140.81Work Completed
199 klb157123301KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Harknchi village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.811.90plant commissioned(physically completed)
200 klb157123302KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Allugud village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.813.06Plant commissioned(physically completed)
201 klb157123304KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Bolewad village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.01ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್(physically completed)
202 klb157123306KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Azadpur village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.810.01ಪ್ಲಾಂಟ್ ಕಮಿಷನಡ್
203 KLB157123307KalaburagiInfrastructureWater SupplyGENERALInstallation of WPP plant in Balawad village under JalamrithRWS11/01/2016 4.45 11/01/20164.453.811.91ಪ್ಲಾಂಟ ಕಮಿಷನಡ್ (physically completed)
204 KLB157123322ChittapurInfrastructureWater SupplyGENERALDrain Construction of Kalagi(Part-3)RWS03/10/2015 48.80 03/10/201548.8048.7121.04Phy.completed
205 KLB157123323ChittapurInfrastructureWater SupplyGENERALDrain Pipeline at Kalagi (Part-4)RWS03/10/2015 44.95 03/10/201544.9544.5038.89Physically completed(Court Case)
206 KLB157123324ChittapurInfrastructureWater SupplyGENERALDrain Construction at Kalagi (Part-5)RWS03/10/2015 36.55 03/10/201536.5536.1830.11completed
207 KLB157313262KalaburagiInstitutionalHostelGeneralEquipments to hostel (manual)HKRDB  5.15 30/12/20155.150.000.00completed
208 KLB157313263KalaburagiInstitutionalHostelGeneralfurniture to hostel (ind-65)HKRDB  14.47 24/11/201514.470.0013.97completed
209 KLB157313269KalaburagiInstitutionalHealthGeneralConstn of maternity hall at PHC Rahmat nagar (Balance Work) in Kalaburagi Tq.PWD KLB07/05/2015 15.00 08/10/201515.0014.7913.38physically completed.
210 KLB157313270KalaburagiInfrastructureRoads & BridgesGeneralConstrication of CC road and CC drain from Hagarga main road nor complex to rahmat nagar existing road via prince function hall including internal road in gulshan-e-arafat colony in kalaburagi.PWD KLB07/05/2015 195.00 08/10/2015164.92170.86170.61physically completed
211 KLB157313271KalaburagiInfrastructureRoads & BridgesGeneralConstrication of RCC slabs over existing CC drain from Patel complex to Ittehad Chowk in firdous colony and abubakar colony in ward No. 13 kalaburagi.PWD KLB07/05/2015 25.00 08/10/201525.0024.1920.00Physically complted final report received.
212 KLB157313272KalaburagiInfrastructureRoads & BridgesGeneralConstrication of Storm water drain from Masjid-e-Asra to Join Azadpur road including CD in Ahmed nagar Colony in W.No.13 Kalaburagi Tq.PWD KLB07/05/2015 20.00 08/10/201520.0016.4515.80Physically complted final report received.
213 KLB157313273KalaburagiInfrastructureRoads & BridgesGeneralConstrication of Storm water drain from Dr.Tayyab House to join azadpur road and CD via Tahar ali and Kazim baig house in W.No.13 Kalaburagi Tq.PWD KLB07/05/2015 20.00 08/10/201520.0016.4514.43 completed
214 KLB157313274KalaburagiInfrastructureRoads & BridgesGeneralConstruction of RCC Slabs for road crossing in yadulla colony Kalaburagi Tq.PMGSY07/05/2015 10.00 20/07/201510.008.877.75completed
215 KLB157323259KalaburagiInstitutionalHostelGeneralSupply of Furnitures, cots R.O's atc to post metric Minority Girls Hostel Shaik Roza Kalaburagi Tq.HKRDB07/05/2015 15.00  0.000.000.00completed
216 KLB157323260KalaburagiInstitutionalHostelGeneralSupply of Furnitures, cots R.O's atc to pre metric Minority Girls Hostel Filter bed Area Kalaburagi Tq. HKRDB07/05/2015 15.00  0.000.000.00completed
217 KLB157323261KalaburagiInstitutionalschoolGeneralProcurement of Music room for hostel in Kalaburagi(manual tender)HKRDB  4.84 24/11/20154.840.002.72completed
218 KLB157323275KalaburagiInfrastructureRoads & BridgesGeneralConstriction of CC road and CC Drain in Yadulla colony Kalaburagi Tq.PMGSY07/05/2015 50.00 16/10/201549.6044.9442.37completed
219 KLB157323276KalaburagiInfrastructureRoads & BridgesGeneralConstriction of CC road and CC drain from hagarga main road [SH-149] gouse saw mill cross to MK nagar road via naseeriya masjid including internal roads in Zam Colony Kalaburagi cityPMGSY07/05/2015 198.00 14/12/2015183.52171.36194.40completed
220 KLB157323277KalaburagiInfrastructureRoads & BridgesGeneralImprovements and Asphalting to road and constriction of CC drain from sedam road (SH-10) to Sri. A.B Vajpayee chowk Adarsh nagar colony Kalaburagi Tq.PMGSY07/05/2015 75.00 14/12/201572.8167.8467.84Completed
221 KLB157413246KalaburagiInstitutionalCollegeGeneralConstruction of Additional room for PU Women College at Kamalapur Kalaburagi TalukPWD KLB 21/10/2015 25.00 16/02/201625.0024.2123.07 Final report received,
222 KLB157413247KalaburagiInstitutionalHealthGeneralConstruction of Medical Officers Quarters at Mahagaon PHC KalaburagiPWD KLB21/10/2015 30.00 16/02/201629.9628.2725.77Work completed Final bill paid.
223 KLB157423256KalaburagiInfrastructureRoads & BridgesGeneralProviding CC Road from Khaja Master House to Rehmanshet Plot at Ward No 20 in MSK Mill Area Kalaburagi cityPRED18/01/2016 10.00 30/08/201610.009.729.67completed
224 KLB157613237KalaburagiInstitutionalSchoolGeneralProviding & Installing 100 KVA generator at Kendriaya vidyalaya school KalaburagiNK07/08/2015 8.80 07/08/20158.808.807.36Work completed
225 KLB157613238KalaburagiInstitutionalSchoolGeneralConstruction of Children play ground and equipments at Kendriya vidyalaya School kalaburagiNK07/08/2015 5.58 07/08/20155.585.585.58Work completed
226 KLB157613239KalaburagiInstitutionalSchoolGeneralProviding Water Purifier to Kendriaya vidyalaya KalaburagiNK30/09/2015 6.52 30/09/20156.526.527.05WorK completed
227 KLB157613240KalaburagiInstitutionalSchoolGeneralConstruction of Headroom at Kendriya vidyalaya school KalaburagiNK30/09/2015 0.45 30/09/20150.450.450.90Work completed
228 KLB157613241ChincholiInstitutionalSchoolGeneralConstn of first grade degree college at ChincholiKRIDL-206/01/2016 149.20 06/01/2016149.200.00142.20completed.
229 KLB157613242KalaburagiInstitutionalLibraryGeneralConst of Class room, library building at MahagaonNK12/01/2016 91.43 12/01/201691.4391.4391.39Work completed & handed over
230 KLB157623229AlandInfrastructureWater SupplyGeneralExtra provision of Plat form and pump at Amarja Dam in NimbargaRWS05/02/2016 21.82 05/02/201621.8215.6413.09 ಕಾಮಗಾರಿ ಪೂರ್ಣಗೊಂಡಿದೆ
231 KLB157623232KalaburagiInstitutionalCollegeGeneralRepairs & renovation to ITI College Workshop building at KalaburagiNK22/07/2015 41.20 30/03/201541.2041.2040.56Work completed & Handed Over
232 KLB157623236KalaburagiInstitutionalSchoolGeneralProviding & Installing PA system at Kendriya Vidyalaya school KalaburagiNK07/08/2015 2.82 07/08/20152.822.822.10Work completed
233 KLB157813338KalaburagiInstitutionalUniversityGENERAL1.8 CUM Capacity Auto Tippers at Central University, KalaburagiHKRDB06/01/2016 9.76 06/01/20169.760.009.35 
234 KLB157813339KalaburagiInstitutionalUniversityGENERALShredder for Biomedical & Plastic Waste (50kg / hr) Saratech Shrine 900 with 3 year CMC after warranty period at Central University, KalaburagiHKRDB06/01/2016 5.75 06/01/20165.750.005.75 
235 KLB157813340KalaburagiInstitutionalUniversityGENERALWatchman/ Workers Quarter (Prefab hut 4.88 X 4.88 M model 117) at Central University, KalaburagiHKRDB06/01/2016 1.75 06/01/20161.750.001.01 
236 KLB177123027SedamInfrastructureWater SupplyGENERALProviding RO Plant in Govt H.P School @ Ranjol Village in sedam TalukaRWS11/01/2016 1.50 23/11/20151.501.480.99Phy completed
      TOTAL  5975.92 5695.094799.374693.55