LIST OF Under Progress MACRO WORKS

  Workcode Taluka Type Subtype Category Work Name Agency Plan Approved Date Allocation ADM Approved Date ADM Amount Work Order Amt Exp Stages of Work Status Not Started Under Progress Completed Feedback
1 HK161113146HK RegionInstitutionalTraining CentreGENERALPROCUREMENT OF 250 LPH R.O PLANT/ELECTRONIC ITEMS REQUIRED FOR DISTRICT TRAINING CENTRE OF ALL HK REGION DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-258HKRDB24/03/2017 29.03 24/03/201729.0329.0315.0275% payment made of items suppliedUnder Progress
2 HK161713005HK RegionInstitutionalParkGENERAL Supply Installation Testing and Commissioning of Digital Planetarium Equipment and Software and Fun Science Equipment and Software at Bidar Science Centre and Kalburagi Theme Park under HKRDB Macro 2015-16 and 2016-17 IND-213HKRDB05/11/2016 63.05 05/11/201663.0563.0523.2975 % payment made for materials suppliedUnder Progress
3 HK161713007HK RegionInstitutionalSportsGENERALPROCUREMENT OF MATERIALS FOR IMPROVEMENT OF CHANDRASHEKAR PATIL DISTRICT STADIUM KALABURGI UNDER HKRDB MACRO PROJECT 2016-17 IND-168HKRDB09/06/2016 9.37 09/06/20169.379.377.7175 % payment made for materials supplied and balance will be paid after third party inspectionUnder Progress
4 HK161713009HK RegionInstitutionalSportsGENERALPROCUREMENT OF EQUIPMENT - FURNITURE - SPORTS ITEMS REQUIRED FOR DIFFERENT LOCATIONS OF KALABURAGI - YADGIR - BIDAR - BELLARY - KOPPAL - RAICHUR DISTRICTS UNDER HKRDB MACRO PROJECTS FOR 2016-17 IND 173HKRDB24/10/2016 37.23 24/10/201637.2337.2331.6375 % payment made for materials supplied and balance will be paid after third party inspectionUnder Progress
5 HK161713013HK RegionInstitutionalUrban InfrastructureGENERALProviding water purifier and LED screen to CMC kalaburagiHKRDB11/07/2016 38.50 11/07/201638.500.000.00under progressUnder Progress
6 HK161713015HK RegionInstitutionalOthersGENERALPROCURMENT OF MARGAROGYA VAHINI FOR KMC ROAD MAINTENANCE TASK FORCE TOWARDS MACRO PROJECTS FOR KMC 2015-16 & 2016-17 UNDER HKRDB MACRO PROJECT IND-221HKRDB30/12/2016 10.74 30/12/201610.7410.744.6175% payment made Under Progress
7 HK161713016HK RegionInstitutionalPlantGENERALPROCURMENT OF 1000-500 LPH R-O PLANT AND E-TOILETS FOR KALABURAGI MUNCIPAL CORPORATION TOWARDS MACRO PROJECTS KMC 2015-16 & 2016-17 UNDER HKRDB MACRO PROJECT IND-217HKRDB30/12/2016 114.71 30/12/2016114.71114.7147.7075% payment madeUnder Progress
8 HK161713022HK RegionInstitutionalSocialGENERALPROCUREMENT OF FURNITURE-ELECTRONIC-PLAY ITEMS REQUIRED DESTITUTE HOMES OF BALLARY DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-279HKRDB11/05/2017 34.81 11/05/201734.8134.8125.12Parcel Supplied - 75 % payment made of material suppliedUnder Progress
9 HK161713023HK RegionInstitutionalCollegeGENERAL PROCUREMENT OF MEDICAL EQUIPMENTS REQUIRED FOR VARIOUS MEDICAL COLLEGE-HOSPITALS OF HK REGION UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-294 (bidar)HKRDB25/04/2017 42.55 25/04/201742.5542.556.806 items suppliedUnder Progress
10 HK161713024HK RegionInstitutionalHealthGENERALProcurement of Minor Medical Equipments for Kalaburagi District THOs under HKRDB Macro Regional Health 2016-17 IND 153HKRDB31/08/2016 66.91 31/08/201666.9166.9163.6875% payment madeUnder Progress
11 HK161713025HK RegionInstitutionalHealthGENERALProcurement of Water Purifiers 250-500 Ltr for Kalaburagi District Talukas Health Offices, Kalaburagi Dist. Hospital & Jayadeva Heart Centre Kalaburagi under HKRDB Macro Regional Health 2016-17 IND 138HKRDB31/08/2016 168.49 31/08/2016168.49168.49122.54materials supplied and 75 % payment made balance will be paid after third party inspectionUnder Progress
12 HK161713026HK RegionInstitutionalHealthGENERALPROCUREMENT OF MEDICAL EQUIPMENTS FOR ESI HOSPITAL KALBURAGI & DISTRICT HOSPITAL KOPPAL UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-273HKRDB24/03/2017 107.25 24/03/2017107.25107.2583.40Partial Supplied - 75% payment madeUnder Progress
13 HK161713027HK RegionInstitutionalHealthGENERALPROCUREMENT OF MEDICAL EQUIPMENT FOR VARIOUS TALUKAS OF H.K REGION DISTRICTS UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 REAPPROPRIATION IND-272HKRDB28/03/2017 105.47 28/03/2017105.47105.4766.88Parcel supplied - 75% payment madeUnder Progress
14 HK161713028HK RegionInstitutionalHealthGENERALPROCUREMENT MEDICAL EQUIPMENTS REQUIRED FOR GANGAVATI TALUKA HOSPITAL DISTRICT KOPPAL & ECHS POLYCLINIC KALABURAGI UNDER HKRDB MACRO PROJECT KALABURAGI FOR THE YEAR 2016-17 IND-248HKRDB20/02/2017 21.80 20/02/201721.8021.800.7375% payment made for 01 equipments suppliedUnder Progress
15 HK161713029HK RegionInstitutionalHealthGENERALProcurement of Medical equipments for District Surgeon Bellary, Talukas of Kalaburagi & Bidar District Health & Family Welfare under HKRDB MACRO Projects for 2016-17- IND 154HKRDB25/08/2016 19.48 25/08/201619.4819.4817.1175% payment made of materials suppliedUnder Progress
16 HK161713034HK RegionInstitutionalHealthGENERALPROCUREMENT MEDICAL EQUIPMENTS REQUIRED FOR GANGAVATI TALUKA HOSPITAL & ECHS POLYCLINIC KALABURAGI UNDER HKRDB MACRO PROJECT KALABURAGI FOR THE YEAR 2016-17 IND-233HKRDB09/02/2017 28.82 09/02/201728.8228.8217.13Parcel Supplied - 75% payment madeUnder Progress
17 HK161713036HK RegionInstitutionalHealthGENERALProcurement of Computer-Medical Equipments For Different Locations of Koppal & Bellary District under HKRDB MACRO Projects for 2016-17 IND-160HKRDB09/06/2016 11.71 09/06/201611.7111.717.00Parsel supplied 75% payment made Under Progress
18 HK161713038HK RegionInstitutionalHealthGENERALProcurement of Health Facilities for Different Locations of Koppal & Bellary District under HKRDB MACRO Projects for 2016-17 IND-161HKRDB14/09/2016 107.23 14/09/2016107.23107.2382.7675% payment made of items suppliedUnder Progress
19 HK161713039HK RegionInstitutionalHealthGENERALPROCUREMENT OF MEDICAL EQUIPMENTS REQUIRED FOR DIFFERENT PHCs,-THOs-CHCs OF KALABURGI, BELLARY AND DISTRICT HOSPITAL OF BELLARY UNDER HKRDB KALABURAGI FOR THE YEAR 2016-17 IND-175HKRDB24/10/2016 86.58 24/10/201686.5886.5844.0175 % payment made for materials supplied and balance will be paid after third party inspectionUnder Progress
20 HK161713041HK RegionInstitutionalHealthGENERALProcurement of Health Facilities-Hospital Furnitures for Different Locations of Koppal & Bellary District under HKRDB MACRO Projects for 2016-17 IND-162HKRDB09/06/2016 29.40 09/06/201629.4029.4022.33Parcel supplied - 75 % payment made for materials supplied and balance will be paid after third party inspectionUnder Progress
21 HK161713042HK RegionInstitutionalSmart PoliceGENERALProcurement of Water Purifiers 500 LPH for Kalaburagi & Bellary SPs under SMART Police HKRDB MACRO Projects for 2016-17 NDENT No-142HKRDB08/09/2016 10.62 08/09/201610.6210.626.7675 % payment made for materials supplied and balance will be paid after third party inspectionUnder Progress
22 HK161713046HK RegionInstitutionalSmart PoliceGENERALproviding obstacles for PTS at DAR premise in Ballari HKRDB24/11/2016 11.51 24/11/201611.510.004.60Under progressUnder Progress
23 HK161713047HK RegionInstitutionalSmart PoliceGENERALvehicle parking shed at DAR premises in BallariHKRDB19/12/2016 22.24  0.000.000.00to be startedUnder Progress
24 HK161713048HK RegionInstitutionalSocialGENERALPROCUREMENT OF FURNITURE-ELECTRONIC ITEMS REQUIRED FOR SOCIAL WELFARE HOSTELS OF BELLARY DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-268HKRDB12/11/2016 59.29 12/11/201659.2959.2944.39Complete - 75% payment madeUnder Progress
25 HK161713054HK RegionInstitutionalSmart PoliceGENERALProcurement of Monitoring and Rescue Equipments for SP Office, Koppal under SMART Police HKRDB MACRO Projects for 2016-17 NDENT No-145HKRDB14/09/2016 95.22 14/09/201695.2295.2278.9275 % payment made for materials supplied and balance will be paid after third party inspectionUnder Progress
26 HK161713055HK RegionInstitutionalSmart PoliceGENERALProcurement of Computers for SP Office, Yadgir under SMART Police and Different Health Centres of Bellary - Koppal District Under HKRDB MACRO Projects for 2016-17 IND-198HKRDB24/10/2016 30.41 24/10/201630.4130.4128.91materials supplied and 75 % payment made balance will be paid after third party inspectionUnder Progress
27 HK161713056HK RegionInstitutionalSmart PoliceGENERALPROCUREMENT OF TRAFFIC MANAGEMENT EQUIPMENTS UNDER SMART POLICE SCHEME FOR BALLARY POLICE UNDER HKRDB MACRO PROJECT KALABURAGI FOR THE YEAR 2016-17 IND-234HKRDB02/03/2017 61.78 02/03/201761.7861.7847.7875% payment madeUnder Progress
28 HK161713057HK RegionInstitutionalSmart PoliceGENERALPROCUREMENT OF RESCUE ITEMS, ELECTRICAL EQUIPMENT, FURNITURE, CLOTHING, UTENSILS FOR HOMEGUARD KALBURGI AND DISASTER TRAINING CENTRE BALLARI UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-235HKRDB17/02/2017 22.77 17/02/201722.7722.7715.87Parcel supplied - 75% payment madeUnder Progress
29 HK161713063HK RegionInstitutionalSocialGENERALPROCUREMENT OF FURNITURE REQUIRED FOR BCM HOSTELS FOR VARIOUS TALUKAS OF YADGIRI DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-263HKRDB22/03/2017 146.45 22/03/2017146.45146.4522.36Parcel Supplied - 75% payment madeUnder Progress
30 HK161713065HK RegionInstitutionalHostelGENERALPROCUREMENT OF FURNITURE-ELECTRONIC ITEMS FOR VARIOUS RESIDENTAL SCHOOLS OF SOCIAL WELFARE DEPARTMENT OF YADGIRI DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-274HKRDB24/03/2017 133.37 24/03/2017133.37133.3792.1275% payment madeUnder Progress
31 HK161713066HK RegionInstitutionalHostelGENERALSupply of Coir mattresses and pillows in Koppal BCM HostelsHKRDB05/01/2017 161.70 05/01/2017161.70161.7011.70Under ProgressUnder Progress
32 HK161713069HK RegionInstitutionalSocialGENERALPROCUREMENT OF ELECTRONICS-FURNITURE ITEMS REQUIRED FOR PRE & POST MATRIC BCM HOSTELS FOR VARIOUS TALUKAS OF BIDAR DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-266HKRDB23/03/2017 47.08 23/03/201747.0847.0832.00Parcel Supplied - 75% payment madeUnder Progress
33 HK161713070HK RegionInstitutionalSocialGENERALPROCUREMENT OF KICHEN ITEMS REQUIRED FOR BCM HOSTELS FOR VARIOUS TALUKAS OF YADGIRI DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-264HKRDB22/03/2017 8.74 22/03/20178.748.746.55Parcel Supplied - 75% payment madeUnder Progress
34 HK161713075HK RegionInstitutionalCulture ArtsGENERALPromotional film of HKRDB HKRDB27/09/2016 8.00 27/09/20168.008.000.70Under ProgressUnder Progress
35 HK161713076HK RegionInstitutionalInnovativeGENERALProcurement of Quality Control Equipments & Total Station Equipment for Upgradation of Nirmithi Kendra as Green Technology Centre & District Stadium at Kalaburagi under HKRDB MACRO Projects for 2016-17 IND-185HKRDB24/10/2016 11.70 24/10/201611.7011.708.7775 % payment made for materials supplied and balance will be paid after third party inspectionUnder Progress
36 HK161713079HK RegionInstitutionalLibraryGENERALProcurement of Furniture required for Upgradation of GP Libraries for all Districts of HK Region under HKRDB MACRO Projects for the year 2016-17 IND-215HKRDB28/12/2016 43.75 28/12/201643.7543.7531.0875% payment made for equipment suppliedUnder Progress
37 HK161713080HK RegionInstitutionalTankerGENERAL9 KL water tanker to TMC KoppalHKRDB02/03/2017 32.02 02/03/201732.020.000.00Order placed on DGSNDUnder Progress
38 HK161713093HK RegionInstitutionalOthersGENERALPROCUREMENT OF FURNITURE-ELECTRONIC ITEMS REQUIRED FOR YADGIR & BALLARY DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 REAPPROPRIATION IND-269HKRDB24/03/2017 19.13 24/03/201719.1319.133.66Parcel Supplied - 75% payment madeUnder Progress
39 HK161713094HK RegionInstitutionalCollegeGENERALPROCUREMENT OF FURNITURE-ELECTRONICS-500 LPH R.O PLANT REQUIRED FOR GOVT POLYTECHNIC COLLEGE & KHADI BOARD ALL HK REGION DISTRICTS UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-259HKRDB28/03/2017 48.49 28/03/201748.4948.4932.98Parcel Supplied - 75% payment made of items suppliedUnder Progress
40 HK161713095HK RegionInstitutionalEducationGENERALProviding equipments to Agriculture college Kalburgi, KV Kalaburagi, PU college Kalagi, Karajgi, Kamalapur and Srinivas Saradgi and Govt high school Hadalgi HKRDB04/07/2016 106.05 04/07/2016106.050.008.49Under ProgressUnder Progress
41 HK161713099HK RegionInstitutionalSchoolGENERALRO plant -100LPH at Jawahar Navodaya Chikajogi tq KudligiHKRDB13/01/2017 5.00  0.000.000.00under progressUnder Progress
42 HK161713102HK RegionInstitutionalSchoolGENERALPROCUREMENT OF KITCHEN ITEMS REQUIRED FOR ANGANWADI & GHPS SCHOOL OF KALABURAGI DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-262HKRDB22/03/2017 20.07 22/03/201720.0720.073.91Partial Supplied 75% payment madeUnder Progress
43 HK161713103HK RegionInstitutionalOthersGENERALProcurement of Furniture, Electronic Items, RO Plants and Kiosk Required for different college locations at Koppala - Bellary Districts under HKRDB Macro Projects for 2016-17 IND-193HKRDB25/10/2016 107.44 25/10/2016107.44107.4482.51materials supplied and 75 % payment made balance will be paid after third party inspectionUnder Progress
44 HK161713104HK RegionInstitutionalCollegeGENERALPROCUREMENT OF R.O PLANTS FOR DISTRICT & TALUKA FORA AND ACB OFFICES ALONG WITH DIFFERENT COLLEGES-HOSTELS OF KALBURAGI & KOPPALS DISTRICT UNDER H.K REGION UNDER HKRDB MACRO PROJECT 2016-17 IND-159HKRDB31/08/2016 79.85 31/08/201679.8579.8555.5075 % payment made for materials supplied and balance will be paid after third party inspectionUnder Progress
45 HK161713105HK RegionInstitutionalCollegeGENERALPROCUREMENT OF FURNITURE & EQUIPMENTS FOR VIGNANESHWAR GOVT. LAW COLLEGE(MARTUR), GU CAMPUS AND GOVT. POLYTECHNIC BELLARY UNDER HKRDB MACRO PROJECTS FOR 2016-17. IND 178HKRDB10/04/2016 50.13 10/04/201650.1350.1348.26Partial Supplied Under Progress
46 HK161713107HK RegionInstitutionalWomen & ChildGENERALPROCUREMENT OF ANGANWADIES ITEMS FOR VARIAOUS TALUKAS OF RAICHUR DISTRICT UNDER HKRDB MACRO PROJECT FOR THE YEAR 2016-17 IND-283HKRDB17/03/2017 91.17 17/03/201791.1791.1768.66completed - 75% payment made Under Progress
47 HK161713109HK RegionInstitutionalCollegeGENERALPROCUREMENT OF ELECTRONIC-HOUSE HOLD- SPORTS ITEMS FOR ENGLISH LANGUAGE LAB FOR B.ED COLLEGE KALABURAGI & KASTURBA RESIDENTAL HIGH SCHOOL KALABURAGI UNDER HKRDB MACRO PROJECT 2016-17 IND-157HKRDB24/08/2016 2.28 24/08/20162.282.281.7175% payment made of materials suppliedUnder Progress
48 HK161713119HK RegionInstitutionalOthersGENERALPROCUREMENT OF FURNITURE ITEMS FOR DIFFERENT HOSTEL-SCHOOL LOCATION FOR TALUKA OF KALABURAGI DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT 2016-17 IND 180HKRDB24/10/2016 138.93 24/10/2016138.93138.93104.19completed 75% payment madeUnder Progress
49 HK161713120HK RegionInstitutionalSocialGENERAL PROCUREMENT OF COMPUTERS-DEEP FREEZERS-UPS FOR POST MATRIC BOYS & GIRLS HOSTELS OF DIFFERENT HOSTELS LOCATION OF KALABURAGI DISTRICT UNDER HKRDB MACRO PROJECT 2016-17 IND-194HKRDB11/03/2016 124.61 11/03/2016124.61124.61109.29completed 75% payment madeUnder Progress
50 HK161713121HK RegionInstitutionalCollegeGENERAL PROCUREMENT OF FURNITURE’S FOR DIFFERENT COLLEGES-HOSTELS FOR KALABURAGI DISTRICT UNDER HKRDB MACRO PROJECT 2016-17 IND-156HKRDB09/06/2016 54.71 09/06/201654.7154.7151.74completed 75% payment madeUnder Progress
51 HK161713122HK RegionInstitutionalCollegeGENERALPROCUREMENT OF SPORTS ITEMS AND ELECTRICAL-ELECTRONIC APPLIANCES FOR DIFFRENT COLLEGES & HOSTEL FOR KALABURAGI DISTRICT UNDER HKRDB MACRO PROJECT FOR 2016-17 IND-155HKRDB09/06/2016 11.33 09/06/201611.3311.3310.8675% payment made of materials suppliedUnder Progress
52 HK161713123HK RegionInstitutionalSchoolGENERALPROCUREMENT OF UTILITY EQUIPMENTS FOR DIFFERENT SCHOOL-COLLEGES OF KALABURAGI UNDER HKRDB MACRO PROJECT 2016-17 IND-143HKRDB09/06/2016 16.19 09/06/201616.1916.1910.9775 % payment made for materials supplied and balance will be paid after third party inspectionUnder Progress
53 HK161713124HK RegionInstitutionalCollegeGENERALPROCUREMENT OF FURNITURE REQUIRED FOR GOVT P.U COLLEGES OF VARIOUS TALUKAS OF H.K REGION DISTRICTS UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-275HKRDB22/03/2017 61.82 22/03/201761.8261.8243.1575% payment madeUnder Progress
54 HK161713126HK RegionInstitutionalSocialGENERALPROCUREMENT OF KITCHEN ITEMS FOR POST MATRIC BOYS & GIRLS HOSTELS OF DIFFERENT HOSTELS LOCATIONS OF KALABURAGI DISTRICT UNDER HKRDB MACRO PROJECT 2016-17 IND-196HKRDB24/10/2016 26.63 24/10/201626.6326.6319.9775% Payment madeUnder Progress
55 HK161713127HK RegionInstitutionalSocialGENERALPROCUREMENT OF FURNITUR FOR POST MATRIC BOYS & GIRLS HOSTELS OF DIFFERENT HOSTELS LOCATIONS OF KALABURAGI DISTRICT UNDER HKRDB MACRO PROJECT 2016-17 IND-195HKRDB25/10/2016 17.94 25/10/201617.9417.9413.4575% payment madeUnder Progress
56 HK161713128HK RegionInstitutionalSchoolGENERALPROCUREMENT OF UPS-R.O PLANT-ELECTRICAL & ELECTRONIC-KITCHEN ITEMS & SPORTS MATERIALS REQUIRED FOR MDRS SCHOOLS AT DIFFERENT PLACE OF KALABURAGI DISTRICT UNDER HKRDB MACRO PROJECT KALABURAGI FOR THE YEAR 2016-17 IND-236HKRDB24/03/2017 97.34 24/03/201797.3497.3496.09materials supplied and 75 % payment made balance will be paid after third party inspectionUnder Progress
57 HK161713129HK RegionInstitutionalSchoolGENERALPROCUREMENT OF FURNITURE-ELECTRONICS ITEMS REQUIRED FOR VARIOUS GOVT SCHOOLS & P.U COLLEGE OF YADGIRI & KALABURAGI DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-260HKRDB16/03/2017 67.96 16/03/201767.9667.9647.43Parcel Supplied - 75% payment madeUnder Progress
58 HK161713130HK RegionInstitutionalSchoolGENERALPROCUREMENT OF ELECTRICAL & ELECTRONICS - FURNITURE - SPORTS ITEMS FOR DIFFERENT SCHOOLS AND DISTRICT INFORMATION OFFICES OF H.K. REGION UNDER HKRDB MACRO PROJECTS FOR 2016-17 IND 170HKRDB10/04/2016 160.89 10/04/2016160.89160.894.85Partial supplied - 75 % payment made for materials supplied and balance will be paid after third party inspectionUnder Progress
59 HK161713133HK RegionInstitutionalCollegeGENERALGreen board on DGSND forShri Pampanna Sharnappa Guggal Shettar Degree College Kanakgiri, KoppalHKRDB17/01/2017 0.84 17/01/20170.840.840.84under progressUnder Progress
60 HK161713138HK RegionInstitutionalEducationGENERALEeshanyada AisiriHKRDB07/09/2016 85.05 07/09/201685.050.0023.80Under ProgressUnder Progress
61 HK161713139HK RegionInstitutionalEducationGENERALVijayanagarada AisiriHKRDB07/09/2016 25.99 07/09/201625.990.007.70Under ProgressUnder Progress
62 HK161713142HK RegionInstitutionalOthersGENERALTransheight Consulantant Pvt ltd, bangalore 2016-17 Macro-civilHKRDB05/03/2016 12.48  0.000.00184.10 Under Progress
63 HK161713143HK RegionInstitutionalOthersGENERALInspectoarte Griffith, Bangalore 2016-17-equipmentsHKRDB  0.12  0.000.000.12 Under Progress
64 HK161713144HK RegionInstitutionalOthersGENERALAakar Abhinav Consultants Pvt ltd, Mumbai 2015-16 and 2016-17 parkHKRDB18/01/2016 4.90  0.000.0014.19 Under Progress
65 HK161713148HK RegionInstitutionalOthersGENERALPROCUREMENT OF 250 LPH RO PLANT & SPORTS ITEMS REQUIRED FOR BCM HOSTELS FOR VARIOUS TALUKAS OF YADGIRI DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-265HKRDB24/03/2017 78.71 24/03/201778.7178.7134.81Partial Supplied - 75% payment madeUnder Progress
66 HK161713149HK RegionInstitutionalOthersGENERALPROCUREMENT OF FURNITURE & ELECTRONIC ITEMS REQUIRED FOR WAQF OFFICE & DC OFFICE OF ALL HK REGION DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-257HKRDB16/03/2017 22.46 16/03/201722.4622.4616.57Partial Supplied 75% payment made of items suppliedUnder Progress
67 HK161713151HK RegionInstitutionalSocialGENERALProcurement of CCTV cameras for NEKSRTC Bus stands for various talukas of HK region District under HKRDB Kalaburagi Macro project. for the year 2016-17 Koppal District(Ind-298)HKRDB19/04/2017 2.91 19/04/20172.910.002.1875% payment madeUnder Progress
68 HK161713152HK RegionInstitutionalHealthGENERALProcurement of medical equipments required for various medical college/Hospital of HK region under HKRDB Kalaburagi Macro project. for the year 201-17 Ind-294 Koppal Dist.HKRDB27/04/2017 8.52  0.000.006.00 Under Progress
69 HK161713153HK RegionInstitutionalSocialGENERALPROCUREMENT OF LIGHTING/ AUDIO/ACOUSTICS/SEATING FURNITURE/AC & DGSET EQUIPMENTS & FITTINGS FOR SEDUM AUDITORIUM UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 (Kalaburagi Macro)HKRDB13/04/2017 114.09 13/04/2017114.09114.0916.1575% payment madeUnder Progress
70 HK161713154HK RegionInstitutionalOthersGENERALPROCUREMENT OF CCTV CAMERAS FOR NEKSRTC BUS STANDS FOR VARIOUS TALUKAS OF HK REGION DISTRICTS UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 IND-298 (Yadgiri)HKRDB13/04/2017 7.82 13/04/20177.820.005.8675% payment madeUnder Progress
71 HK161713155HK RegionInstitutionalHealthGENERALPROCUREMENT OF MEDICAL EQUIPMENTS REQUIRED FOR VARIOUS MEDICAL COLLEGE/HOSPITALS OF HK REGION UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 (Kalaburagi Macro)HKRDB25/04/2017 20.95 25/04/201720.9520.9515.7175% payment madeUnder Progress
72 HK161713156HK RegionInstitutionalHealthGENERALProcurement of medical equipment required for various Medical college/ Hospital of HK Region under Kalaburagi Macro project ind 294 (Yadgiri)HKRDB21/04/2017 8.00 21/04/20178.000.006.0075% payment madeUnder Progress
73 HK161713157HK RegionInstitutionalAnganwadiGENERALPROCUREMENT OF KICHEN/FURNITURE ITEMS REQUIRED FOR VARIUOS ANGANWADIES OF KALABURAGI DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 (KALABURAGI MACRO)HKRDB18/04/2017 14.20 18/04/201714.2014.209.5175% payment madeUnder Progress
74 HK161713158HK RegionInstitutionalHealthGENERALPROCUREMENT OF MEDICAL EQUIPMENTS FOR ESI HOSPITAL KALBURAGI UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 (KALABURAGI MACRO)HKRDB25/04/2017 34.39 25/04/201734.3934.3925.7975% payment madeUnder Progress
75 HK161713159HK RegionInstitutionalSocialGENERALPROCUREMENT OF CCTV CAMERAS FOR NEKSRTC BUS STANDS FOR VARIOUS TALUKAS OF HK REGION DISTRICTS UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 (KALABURAGI MACRO)HKRDB18/04/2017 18.55 18/04/201718.5518.5513.9175% payment madeUnder Progress
76 HK161713160HK RegionInstitutionalUniversityGENERALPROCUREMENT OF FURNITURE /SOUND SYSTEMS/ ELECTRONIC EQUIPMENTS ETC FOR GULBARGA UNIVERSITY SEMINAR HAL UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 (KALABURAGI MACRO)HKRDB25/04/2017 100.36 25/04/2017100.36100.3670.7075% payment madeUnder Progress
77 HK161713161HK RegionInstitutionalSocialGENERALPROCUREMENT OF EQUIPMENT & MATERIALS FOR IT CONSULTANCY OF HKRDB KALABURAGI UNDER HKRDB MACRO PROJECT OF THE YEAR 2016-17 (ind 123)HKRDB06/07/2016 13.46 06/07/201613.460.008.3075% payment madeUnder Progress
78 HK161713163HK RegionInstitutionalSocialGENERALPROCUREMENT OF APPLIANCES AND FAKE NOTE DETECTORS FOR DISTRICT AND ANDTALUKA COURTS CONSUMER FORA AND ACB OFFICES UNDER H K REGION UNDER HKRDB MACRO PROJECT 2016-17 IND-151HKRDB25/08/2016 5.99 25/08/20165.995.994.4975 % payment made for materials supplied and balance will be paid after third party inspectionUnder Progress
79 HK161713165HK RegionInstitutionalHealthGENERALPROCUREMENT OF MEDICAL EQUIPMENTS FOR VARIOUS TALUKAS OF BIDAR DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 (ind 252)HKRDB16/03/2017 37.90 16/03/201737.9037.9023.6275% payment made for equipments suppliedUnder Progress
80 HK161713166HK RegionInstitutionalSocialGENERALPROCUREMENT OF FURNITURE ITEMS REQUIRED FOR VARIOUS TALUKAS OF H.K REGION DISTRICTS UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 (ind 271)HKRDB24/03/2017 10.93 24/03/201710.9310.938.2075% payment madeUnder Progress
81 HK161713167HK RegionInstitutionalEducationGENERALPROCUREMENT OF FURNITURE/ELECTRONIC ITEMS REQUIRED FOR VARIOUS RESIDENTAL SCHOOLS OF SOCIAL WELFARE DEPARTMENT OF SHAHAPUR & SURPUR TALUKAS OF YADGIRI DISTRICT UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 (ind 278)HKRDB05/04/2017 34.36 05/04/201734.3634.3624.5375% payment madeUnder Progress
82 HK161713168HK RegionInstitutionalHealthGENERALPROCUREMENT OF MEDICAL EQUIPMENTS, BLOOD BANK FACILITIES AND FURNITURE FOR DISTT HOSPITAL YADGIR AND CHC RUPANGUDI,BALLARI UNDER HKRDB MACRO PRROJECT FOR THE YEAR 2016-17 (ind 280)HKRDB02/05/2017 111.61 02/05/2016111.61111.6153.2075% paid for materials supplied and put up for balance paymentUnder Progress
83 HK161713169HK RegionInstitutionalSocialGENERALPROCUREMENT OF FURNITURE ITEMS REQUIRED FOR VARIOUS TALUKAS OF H.K REGION DISTRICTS UNDER HKRDB KALABURAGI MACRO PROJECT FOR THE YEAR 2016-17 (ind 281)HKRDB06/04/2017 159.91 06/04/2017159.91159.91117.3075% payment madeUnder Progress
84 HK161713171HK RegionInstitutionalSocialGENERALPROCUREMENT OF CC TV CAMERAS FOR NEKSRTC BUS STANDS FOR VARIOUS TALUKAS OF HK REGION IN RAICHUR DIST [IND NO.298]HKRDB13/04/2017 8.74 13/04/20178.748.746.55 Under Progress
      TOTAL  4290.98 4237.723906.412639.76