LIST OF Completed MACRO WORKS

  Workcode Taluka Type Subtype Category Work Name Agency Plan Approved Date Allocation ADM Approved Date ADM Amount Work Order Amt Exp Stages of Work Feedback
1 BDR15R2123017BhalkiInfrastructureRoads & BridgesGeneralConstruction of CC road with drain from Swami Kirana shop near fire station to Sushilkumar swami house and Sushilkumar Swami house to main road on right side & satyasai ol road on leftside at Bhalki Town in Bhalki Taluka.PWD 31/05/2016 123.42 31/05/2016123.42123.16105.86Completed
2 BDR15R2123018BhalkiInfrastructureRoads & BridgesGeneralConstruction of CC road backside to Mandir at bhat colony in bhalki town in bhalki talukaPWD 31/05/2016 103.00 31/05/2016103.00101.7293.48Completed
3 BDR15R2123019BhalkiInfrastructureRoads & BridgesGeneralConstruction of CC road with drain from sonale house to jadhav hospital Main road via guru cold daink shop at bhalki town.PWD 31/05/2016 30.00 31/05/201630.0029.3229.32Completed
4 BDR15R2123020BhalkiInfrastructureRoads & BridgesGeneralConstruction of CC road with drain from Kaank circle to house of Sharanappa swamy and others (colony behind high school building) at Bhalki Town in Bhalki Taluka.PWD 31/05/2016 45.00 31/05/201645.0044.1844.18Completed
5 BDR15R2123044BhalkiInfrastructureRoads & BridgesGeneralConstruction of 8mm pipe culverts @ Attarga village to Manikeshwar road in Bhalki talukPMGSY 02/02/2016 40.00 14/03/201640.0034.8232.00Work Completed.Final bill Recieved.
6 BDR15R3113025HumnabadInstitutionalEducationGeneralConstruction of 02 additional rooms to Govt Backward Class Primetric Boys hostel at Nirna PRED 31/03/2016 20.00 16/08/201620.2618.8418.80Completed
7 BDR15R3113039HumnabadInstitutionalEducationGeneralConstruction of 02 additional rooms to Govt, SC Primetric Boys hostel at Manna-E-KhalliPRED 31/03/2016 20.00 16/08/201620.2618.2518.00Completed
8 BDR15R3123092HumnabadInfrastructureWater SupplyGENERALWater purification plant in Neerna - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.412.411.42Physically completed
9 BDR15R3123093HumnabadInfrastructureWater SupplyGENERALWater purification plant in Bemalkheda - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.472.750.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/71/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
10 BDR15R3123094HumnabadInfrastructureWater SupplyGENERALWater purification plant in Changlera - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.472.910.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/71/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
11 BDR15R3123095HumnabadInfrastructureWater SupplyGENERALWater purification plant in Boral - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.472.900.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/71/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
12 BDR15R3123096HumnabadInfrastructureWater SupplyGENERALWater purification plant in Bhadrapur - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.472.900.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/71/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
13 BDR15R3123097HumnabadInfrastructureWater SupplyGENERALWater purification plant in Karpakpalli - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47  2.470.000.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/71/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
14 BDR15R3123098HumnabadInfrastructureWater SupplyGENERALWater purification plant in Manna-e-khelli - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.473.850.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/71/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
15 BDR15R3123099HumnabadInfrastructureWater SupplyGENERALWater purification plant in karkanalli - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.472.900.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/71/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
16 BDR15R3123100HumnabadInfrastructureWater SupplyGENERALWater purification plant in Devgiri Thanda - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.473.850.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/71/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
17 BDR15R3123101HumnabadInfrastructureWater SupplyGENERALWater purification plant in Vithalpur - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.473.850.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/71/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
18 BDR15R3123102HumnabadInfrastructureWater SupplyGENERALWater purification plant in Govind Thanda - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.473.850.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/71/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
19 BDR15R3123103HumnabadInfrastructureWater SupplyGENERALWater purification plant in Bannalli - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.473.850.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/71/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
20 BDR15R4113027BidarInstitutionalEducationGeneralConstruction of 01 additional class room to Govt. NelwadPRED 31/03/2016 6.50 16/08/20166.625.835.79Completed
21 BDR15R4123001BidarInfrastructureRoads & BridgesGeneralFormation of Metal Road & Construction of CC Road from Ring Road to Takeki Masjid at Chidri in ward No. 23CMC Bidar08/02/2016 20.00 12/09/201620.2420.2416.68Work Completed
22 BDR15R4123002BidarInfrastructureRoads & BridgesGeneralFormation of Metal Road & Construction of CC Road from H/o Mirza Mehmood Ali Baig H/o Vinor Kumar Police Dept. At Faiz Pura in Ward No. 33CMC Bidar08/02/2016 10.00 12/09/201610.1310.1310.10Work Completed
23 BDR15R4123003BidarInfrastructureRoads & BridgesGeneralFormation of Metal Road & Construction of CC Road from Gawan Urdu School to Madina Chowk at Faiz Pura in ward No. 34CMC Bidar08/02/2016 10.00 12/09/201610.1510.159.45Work COmpleted
24 BDR15R4123004BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road from H/o Faiz Baig to H/o Cholewale Adveppa Master at Faiz Pura in ward No. 33CMC Bidar08/02/2016 10.00 12/09/201610.1310.1310.10Work completed
25 BDR15R4123005BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road from H/o Maqeet operator to Hyderabad road in ward No. 33CMC Bidar08/02/2016 10.00 12/09/20169.709.709.53Work completed
26 BDR15R4123006BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road from Darga Bande Alishah (R.A) to Amer Hamza Masjid via Edgeri Road at Faiz Pura in Ward No: 33CMC Bidar08/02/2016 20.00 12/09/201619.4219.4219.82Work Completed
27 BDR15R4123008BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road from H/o Dilip to H/o Srimandal at vidya nagar in ward No. 25CMC Bidar08/02/2016 10.00 12/09/20169.769.760.00Work Completed
28 BDR15R4123009BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road & Drain from H/o laiq Moulsab to H/o Muneer Sir at Malgounda colony in ward No. 25CMC Bidar08/02/2016 10.00 12/09/20169.239.239.20Work completed
29 BDR15R4123010BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road & Drain from H/o Asif to H/o Jameel at ahmed colony in ward No. 25CMC Bidar08/02/2016 10.00 12/09/201610.1610.169.97WORK COMPLETED
30 BDR15R4123011BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road & Drain from Masjid Mehraj to H/o Tabrez Wasi at Mehraj colony in ward No. 25CMC Bidar08/02/2016 10.00 12/09/201610.1410.149.97WORK COMPLETED
31 BDR15R4123012BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road from H/o Rasool Sab to H/o Mateen at Haq colony in ward No. 25CMC Bidar08/02/2016 10.00 12/09/20169.639.639.58Completed
32 BDR15R4123013BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road & Drain from H/o Naseer to Masjid Aqsa at Haq colony in ward No. 25CMC Bidar08/02/2016 15.00 12/09/201615.2115.2114.95Completed
33 BDR15R4123014BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road from H/o Akheel to H/o Idress at Haq colony in ward No. 25CMC Bidar08/02/2016 15.00 12/09/201615.2115.2114.92Completed
34 BDR15R4123015BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road from Sony Ice Cream to H/o Mallappa House at Haq colony in ward No. 25CMC Bidar08/02/2016 10.00 12/09/201610.1310.139.78Work Completed
35 BDR15R4123016BidarInfrastructureRoads & BridgesGeneralConstruction of CC Road from H/o yaser to KEB Contractor at Bilal Colony in ward No: 25CMC Bidar08/02/2016 10.00 12/09/201610.1310.1210.01Work Completed
36 BDR15R4123021BidarInfrastructureRoads & BridgesGeneralImprovements of road from Aurad (S) to Sirsi(A) in Bidar TalukaPWD 31/03/2016 107.28 03/10/2016104.0087.1286.87completed
37 BDR15R4123030BidarInfrastructureRoads & BridgesGeneralConstruction of CC road and Drain in Ranjol KhenyPRED 31/03/2016 30.00 16/08/201630.3029.7228.88Completed
38 BDR15R4123040BidarInfrastructureRoads & BridgesGeneralImprovement and asphalting to approach road of Gornalli village from ring road in Bidar TalukaPRED 31/03/2016 48.32 02/11/201643.9638.1337.86Completed
39 BDR15R4123047BidarInfrastructureWater SupplyGENERALWater purification plant in Mandakanalli - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS26/05/2016 2.57 26/09/20162.474.050.00completed
40 BDR15R4123049BidarInfrastructureWater SupplyGENERALWater purification plant in Anadoor - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS26/05/2016 2.57 26/09/20162.474.050.00ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/69/2016-17/1721 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
41 BDR15R4123051BidarInfrastructureWater SupplyGENERALWater purification plant in Bhairanlli - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS26/05/2016 2.57 26/09/20162.574.050.00ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/69/2016-17/1721 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
42 BDR15R5123022BasvakalyanInfrastructureRoads & BridgesGeneralImprovements and widing to Basavakalyan to Raichur road SH-51 from (0.00 to 8.00 k.m)PWD 05/08/2016 150.51 05/08/2016150.51149.35142.13Completed
43 BDR15R5123023BasvakalyanInfrastructureRoads & BridgesGeneralImprovements and widing road Koudiyal to Nagoba Katta in Basavakalyan talukaPWD 05/08/2016 73.88 05/08/201673.8863.7460.25completed
44 BDR15R5123031BasvakalyanInfrastructureRoads & BridgesGeneralImprovements to road Ambedkar chowk, Sadanand hotel via CDPO office to Gadagi math road As per PMGSY norms.PRED 31/03/2016 30.00 20/09/201629.3026.2913.91Physically Completed
45 BDR15R5123032BasvakalyanInfrastructureRoads & BridgesGeneralWard No: 13 CC road Road most Backward area in CMC limit at Basavakalyan cityPRED 31/03/2016 20.00 20/09/201619.6019.5918.43Completed
46 BDR15R5123033BasvakalyanInfrastructureRoads & BridgesGeneralWard No: 14 CC road Road most Backward area in CMC limit at Basavakalyan cityPRED 31/03/2016 20.00 20/09/201619.5018.4018.38Completed
47 BDR15R5123034BasvakalyanInfrastructureRoads & BridgesGeneralWard No: 03 CC road Road most Backward area in CMC limit at Basavakalyan cityPRED 31/03/2016 20.00 20/09/201619.8018.1717.47Completed
48 BDR15R5123035BasvakalyanInfrastructureRoads & BridgesGeneralConstruction for CC roads and RCC Drains at Biradar colony in Ward No:24PRED 31/03/2016 30.00 21/11/201630.0026.9026.64Completed
49 BDR15R5123036BasvakalyanInfrastructureRoads & BridgesGeneralContruction CC road and side drain at extension area of biradar colony at Basavakalyan townPRED 24/10/2017 20.00 01/02/201820.0016.9716.69Physically Completed
50 BDR15R5123037BasvakalyanInfrastructureRoads & BridgesGeneralconstruction of CC road from House of Fakir sab mamu house to Dr.Mathpati house and connecting to shivapur road ward no.22 at BasavakalyanPRED 31/03/2016 20.00 20/09/201619.5019.5410.11Physically Completed
51 BDR15R5123066BasvakalyanInfrastructureWater SupplyGENERALWater purification plant in Ujalamb - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20163.603.600.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/70/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
52 BDR15R5123067BasvakalyanInfrastructureWater SupplyGENERALWater purification plant in Bhosga - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.470.000.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/70/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
53 BDR15R5123068BasvakalyanInfrastructureWater SupplyGENERALWater purification plant in Maisalga - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.473.600.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/70/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
54 BDR15R5123069BasvakalyanInfrastructureWater SupplyGENERALWater purification plant in Manthal - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.473.600.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/70/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
55 BDR15R5123070BasvakalyanInfrastructureWater SupplyGENERALWater purification plant in Kohinoor - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.473.600.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/70/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
56 BDR15R5123071BasvakalyanInfrastructureWater SupplyGENERALWater purification plant in Belura - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20163.603.600.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/70/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
57 BDR15R5123072BasvakalyanInfrastructureWater SupplyGENERALWater purification plant in Ghotala - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.473.600.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/70/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
58 BDR15R5123073BasvakalyanInfrastructureWater SupplyGENERALWater purification plant in Gadigoundgaon - Concrete platform - Borewell & Electrification, Pipeline, Installation, Disposal of Waste waterRWS16/10/2017 2.47 26/09/20162.473.600.00ಮಂಡಳಿ ಆದೇಶ ಸಂ: ಹೈಕಮಂ/ಯೋಶಾ/ಮ್ಯಾಕ್ರೋ/70/2016-17/1722 ದಿ: 16.10.2017 ರನ್ವಯ ಕಾಮಗಾರಿಯ ಅನುಷ್ಠಾನ ಇಲಾಖೆ ಬದಲಾವಣೆ ಮಾಡಲಾಗಿದೆ.
      TOTAL  1195.02 1187.391142.77990.53