Sl.NoWorkcodeTalukaSub TypeSectorCategoryWork NameAgencyPlan Approval DateAllocationWork Order AmountExpenditureWork Stage
1 BLY161113028SirguppaInstitutionalEducationGeneralConstruction of Two Class Rooms To Govt PU College Tekkalakote, Siruguppa Taluk, Bellary District.NK03/09/2016 16.35 16.3512.15Roof Laid plastering work under progress
2 BLY161113029SirguppaInstitutionalEducationGeneralConstruction of First Floor Laboratory To Govt PU College Tekkalkote, Siruguppa Taluka, Bellary District.NK03/09/2016 13.29 13.290.89Column upto Roof Level
3 BLY161113030SirguppaInstitutionalEducationGeneralConstrution of Ground floor Laboratory To Govt PU College Tekkalakote, Sirugappa Taluka, Bellary District.NK03/09/2016 16.98 16.985.63Roof Laid Plastering work under progress
4 BLY161113031SirguppaInstitutionalEducationGeneralConstruction of One Class Room To Govt Pu College Tekkalakote, Siruguppa Taluka, Bellary District.NK03/09/2016 9.12 9.126.02Roof Laid Block masonry under progress
5 BLY161113032SirguppaInstitutionalEducationGeneralConstruction of One class Class Room To Govt PU college Tekkalakote, Siruguppa Taluka, Bellary District.NK03/09/2016 9.12 9.120.65column Upto Roof Level
6 BLY161113033SirguppaInstitutionalEducationGeneralConstruction of Toilet Block To Govt PU College @Tekkalakote, Siruguppa Taluk, Bellary DistrictNK03/09/2016 16.04 16.046.29finishing stage
7 BLY161423103SirguppaInfrastructureRoads & BridgesGeneralಬಳ್ಳಾರಿ ಜಿಲ್ಲೆ ಸಿರುಗುಪ್ಪ ತಾಲ್ಲೂಕಿನ ಕೆ ಬೆಳಗಲ್ ಗ್ರಾಮ ಪಂಚಾಯ್ತಿ ವ್ಯಾಪ್ತಿಯ ಕೆ ಬಳಗಲದಿಂದ ಗೆಜ್ಜಾಳವರೆಗಿನ ರಸ್ತೆ ಕಾಮಗಾರಿPRED-B 14/12/2016 31.50 0.000.00tender invited
8 BLY162113001BellaryInstitutionalSocialGeneralM.Y Ghorpade G. P Building at B D halli in Bellary talukaNK27/10/2016 50.00 50.0014.85Lintel Level
9 BLY162113025BellaryInstitutionalEducationGeneralConstruction of Government PU College at Kurugodu Bellary (D)NK30/12/2016 196.22 196.2278.45Roof sheltering work under progress
10 BLY162113044BellaryInstitutionalEducationGeneralConstruction of Additional Class Room to Higher Primary School at Moka Bellary TalukaNK 25/02/2017 26.00 26.0015.70Roof Sheltering work under progress
11 BLY162113089BellaryInstitutionalHostelGeneralConst of OBC Students Girls Hostel at Vijaynagar Sri. Krinadevarayya University Jnanasagara Campus Ballary.NK17/02/2017 180.14 179.4553.12Roof sheltering under progress
12 BLY162123005BellaryInfrastructureRoads & BridgesGeneralFormation of Drain at Diwakara Babu Layout in Ward No. 20 Bellary TalukaCMC Bellary 07/11/2016 70.00 69.2320.34Drain work is in progress.
13 BLY162123008BellaryInfrastructureRoads & BridgesGeneralImprovements to roads from Mundargi Main Road to Ananthapur By Pass in BellaryCMC Bellary 22/12/2016 89.95 89.940.00WMM is laid and stone pitching is in progress.
14 BLY162123020BellaryInfrastructureRoads & BridgesGeneralConstruction of Storm water Drain beside Divakar Babu Layout (VV Sangha Land to Railway Track) Road in Bellary CityCMC Bellary 22/12/2016 30.00 19.090.00M-20 for drain is in progress
15 BLY162123026BellaryInstitutionalEducationGeneralProviding RCC Roof to Existing class rooms and renovation at Govt. P.U. College, BellaryNK05/02/2017 164.10 164.1048.55out of 13 class room ,6 class room concrete work finishing stage 7 rooms concrete work under progress
16 BLY162123042BellaryInfrastructureUrban InfrastructureGeneralConstruction of Development work for Greve-Yard at Cowl Bazar, BellaryNK 21/04/2017 22.58 22.5811.59Finishing stage
17 BLY162123051BellaryInfrastructureRoads & BridgesGeneralImprovement to road from Ch: 10380 km of Kuriganur Distributory to Chanal village by metalling Ashaphalting from km 0.00 to 4.20 including structures under Kuriganur Distributory of RBLLC.PMGSY-B28/02/2017 260.00 251.3264.33Subgrade & GSB Completed.
18 BLY162123059BellaryInfrastructureRoads & BridgesGeneralConstruction of Two CC roads in Mariammanahalli village in Bellary Dist.1) 12ನೇ ವಾರ್ಡಿನ ತುಪ್ಪದಕುಡ್ಡಿ ರೈಮಾನ್ ಸಾಬ್ ಮನೆಯಿಂದ 13ನೆ ವಾರ್ಡಿನ ಲೋಕಪ್ಪನ ಹೊಲದ ರಸ್ತೆಯವರೆಗೆ ಸಿ.ಡಿ.ಮತ್ತು ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ 2) 13ನೇ ವಾರ್ಡನ ಸುಭಾನ್ ಮನೆಯಿಂದ ಪಿ.ಕೆ.ಹಳ್ಳಿ ಪೀರಾಸಾಬ್ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ 3) 13ನೇ ವಾರ್ಡನ ಕುಂಚೂರು ಖಲೀಲ್ ಸಾಬ್ ಮನೆಯಿಂಧ ಎಸ್.ಮಹಮ್ಮದ್ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ 4) 13ನೇ ವಾರ್ಡನ ಪ್ರಿಯದರ್ಶಿನಿ ಶಾಖೆ ಮುಂದಿನಿಂದ ಅಯ್ಯನಹಳ್ಳಿ ಅಡ್ಡ ರಸ್ತೆ ಕೂಡುವ ಬಲಹುಂಚಿ ರಫೀಕ್ ಮನೆಯವರೆಗೆ ಸಿ.ಸಿ.ರಸ್ತೆ ನಿರ್ಮಾಣ PRED-B 09/01/2017 47.72 46.690.00under progress
19 BLY162123125BellaryInfrastructureOthersGENERALಬಳ್ಳಾರಿ ನಗರದ ಟಿ.ಎಸ್ ನಂ: 962/3 ಟೀಚರಸ್ ಕಾಲೋನಿ ನೆಲ್ಲ ಚೆರವು ಪ್ರದೇಶದಲ್ಲಿ ಪಾರ್ಕ ಅಭಿವೃದ್ಧಿ ಪಡಿಸುವುದು.NK07/03/2017 31.00 22.5013.85CiviL work completed play equipment work under progress
20 BLY162223105BellaryInfrastructureRoads & BridgesGENERALಚಾನಾಳು ಗ್ರಾಮದಲ್ಲಿ low level causeway ನಿರ್ಮಾಣ ಮಾಡುವ ಕುರಿತುPMGSY-B27/05/2017 42.50 38.5738.13 work completed.
21 BLY162223106SandoorInfrastructureRoads & BridgesGENERALಕುಡುತಿನಿ ಗ್ರಾಮದ ವಿವಿಧ ವಾರ್ಡಗಳಲ್ಲಿ ಸಿ.ಸಿ. ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣPRED-B26/05/2017 40.00 34.9113.84C C road completed drain under progress
22 BLY163113063HospetInstitutionalEducationGeneralConstruction of 4 School Rooms of Govt. High School in Ward No. 15-31 in Nehru Colony, HospetPRED-B 08/12/2016 32.60 0.000.00under progress
23 BLY163123077HospetInfrastructureRoads & BridgesGeneralImprovement of and Asphalting Road Kottal to Janur road from 0.00 km to 2.00 km in Hospet TalukaPWD-B 04/11/2016 114.08 155.06114.74BT work completed & Side shoulder work to be done
24 BLY164123078SandoorInfrastructureRoads & BridgesGeneralConstruction of road drains in Ward No. 1, 10, 22, 13, 18 & 22 of Sandur Municipal AreaPWD-B 12/04/2017 196.00 183.3882.24Out of 8 wards, CC Road work completed in 5 wards & remaining wards are work under progress
25 BLY164123079SandoorInfrastructureRoads & BridgesGeneralಸಂಡೂರು ತಾಲೂಕಿನ ಕುರೇಕುಪ್ಪ ಪುರಸಭೆ ವ್ಯಾಪ್ತಿಯಲ್ಲಿ ಬರುವ ವಾರ್ಡ ನಂ: 2,7,8,11,15,16,20,21 ಮತ್ತು 22 ರಲ್ಲಿ ರಸ್ತೆ ಮತ್ತು ಚರಂಡಿ ನಿರ್ಮಾಣ.PWD-B 08/12/2016 100.00 89.9952.73Out of 7 wards, 6 wards CC Road work completed & in remaining wards under progress
26 BLY164123104SandoorInfrastructureNemmadi UruGENERALConstruction of Town Hall fro Nemmadi Uru at Sandoor Town in BellaryPWD-B04/26/2017 187.50 184.290.00Work under progress
27 BLY166113083HadagaliInfrastructureWater SupplyGeneralSingataluru Connecting Pipe Line work (Filling up of Koilaragatti Tank and Sovenahalli Tank from Tungabhadra River in Huvinahadagali Taluk)KNNL SLIS Hadagali10/07/2017 199.50 198.560.00work nearing completion.
28 BLY166123049HadagaliInfrastructureNemmadi UruGeneralNemmadi Uru Hadgali : Town HallNK 13/11/2016 186.86 184.2942.60Plinth Completed
29 BLY166123102HadagaliInfrastructureUrban InfrastructureGENERALConstruction of shopping mall in Hadagali Town Bellary Dist.NK24/07/2018 184.88 184.8841.96Column upto Roof Level
30 BLY167123110H.B.HalliInfrastructureWater SupplyGENERALWater Purification plant at chilgodu-1 - Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.RWS26/05/2016 2.47 2.471.30Physically Completed
31 BLY167123112H.B.HalliInfrastructureWater SupplyGENERALWater Purification plant at Basarkodu Tanda- Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.RWS13/01/2017 2.47 2.471.29Physically Completed
32 BLY167123114H.B.HalliInfrastructureWater SupplyGENERALWater Purification plant at H.Obalapur- Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.RWS13/01/2017 2.47 2.470.49Physically Completed
33 BLY167123116H.B.HalliInfrastructureWater SupplyGENERALWater Purification plant at Chikkasobati- Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.RWS13/01/2017 2.47 2.470.49Physically Completed
34 BLY167123118H.B.HalliInfrastructureWater SupplyGENERALWater Purification plant at Guledal- Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.RWS13/01/2017 2.47 2.470.49Physically Completed
35 BLY167123120H.B.HalliInfrastructureWater SupplyGENERALWater Purification plant at Kattehola- Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.RWS13/01/2017 2.47 2.470.48Physically Completed
36 BLY167123122H.B.HalliInfrastructureWater SupplyGENERALWater Purification plant at Chilgodu-2 - Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.RWS13/01/2017 2.47 2.471.30Physically Completed
37 BLY167123124H.B.HalliInfrastructureWater SupplyGENERALWater Purification plant at Chintrampalli- Concrete Platform/ Bore well & Electrification Pipeline, installation, Disposal of waste water.RWS13/01/2017 2.47 2.471.78Physically Completed
      TOTAL  2583.792491.71746.27